Beaufort County Public Works Stormwater Infrastructure ......2019-561 / Saxonville Road Sub Total...
Transcript of Beaufort County Public Works Stormwater Infrastructure ......2019-561 / Saxonville Road Sub Total...
Narrative Description of Project:
Installed driveway apron.
2019-561 / Saxonville Road LaborHours
LaborCost
EquipmentCost
MaterialCost
ContractorCost
Indirect Labor
Total Cost
ASI / Asphalt Installation 25.0 $549.15 $52.36 $53.20 $0.00 $291.90 $946.61AUDIT / Audit Project 1.5 $32.69 $0.00 $0.00 $0.00 $0.00 $32.69DWASPH / Driveway - Asphalt 15.0 $326.30 $60.40 $26.62 $0.00 $148.50 $561.82HAUL / Hauling 10.0 $222.70 $141.60 $367.42 $0.00 $144.20 $875.92UTLOC / Utility locates 0.5 $10.90 $0.00 $0.00 $0.00 $0.00 $10.902019-561 / Saxonville Road Sub Total 52.0 $1,141.73 $254.36 $447.23 $0.00 $584.60 $2,427.92Grand Total 52.0 $1,141.73 $254.36 $447.23 $0.00 $584.60 $2,427.92
Activity: Routine/Preventive MaintenanceDuration: 04/10/19-05/30/19
Project Summary: Saxonville Road
Beaufort County Public WorksStormwater Infrastructure
Project Summary
Before AfterDuring
SAXO
NVILLE
RDLegend
Drainage TypeAccess PipeBleeder PipeChannel PipeChannelStreamCrossline PipeDriveway PipeLateralLateral PipeRiverRoad PipeRoadsideRoadside Pipe
®Project: SaxonvilleRoadActivity: Routine/PreventiveMaintenanceProject #:2019-561Township/SW Dist:St Helena Island/8Completed:May 2019
0 40 80 120 16020Feet 1 inch = 83 feet
Prepared By: BC Stormwater Management UtilityDate Print:06/13/19File:C:\project summaries map/Saxonville Road_2019-561
Installed driveway apron.