Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my...

26
Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss and finalize it !

Transcript of Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my...

Page 1: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Beam Test Plansat the KEK Fuji Beam line

(as of Nov-7 2007)

S. Uozumi

In this slide I will give my idea for somewhatdetailed beam test plan.Let’s discuss and finalize it !

Page 2: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Good and not-so-bad news

• We can borrow the ATLAS SCT

(Thanks to Hara-sensei) ! One undergrad student working on SCT in Tsukuba will finish his grad thesis with

SCT data which will be taken in our BT.

• The SCT can be operated only through Windows PC.

Therefore we have to take all the data with Windows PC this time (the PC can be borrowed from Tsukuba).

• We can also borrow X-Z movable stage from ATLAS

(thanks to Kohriki-san and Ikegami-san), but it may be difficult to link the stage movement with our DAQ system.

Need to perform hand-input scan ?

Page 3: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

People• D. H. Kim (KNU) ? ~ ?• J. S. Suh (KNU) ? ~ ?• D. Kong (KNU) ? ~ ?• K. Kawagoe (Kobe) Nov 17~19, 23~25• D. Jeans (kobe) Nov12~end• T. Kaneko (Kobe) Nov15~end• H. Ikeda (Kobe) Nov15~end• K. Ueyama (Kobe) Nov15~end• T. Takeshita (shinshu) Nov17~20 + alpha• S. Uozumi (shinshu) start~end• M. Nishiyama (Shinshu) Nov 14~end• Y. Sudo (Tsukuba) start~end• T. Ikuno (Tsukuba) start~end• H. Yamazaki (Tsukuba) Nov 16 ? ~ end• Y. Takahashi (Tsukuba) start~end (can not enter to restricted area)

• “start” means start of preparation, Nov-12 on Monday.• “end” means the date where everything is done (includes possible delays).• Let me know if there are modifications needed on the participating period.

Page 4: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Overall schedule~Nov-12th: Gather equipments at KEK

Nov 12th~24th : Start preparation of DAQ, SCT and SciFi system at Fuji B4 by people who can participate.

Nov 16th : Almost participants are at KEK, take radiation training and have a kick-off meeting.

Nov 17th,18th (weekend) : Prepare everything as much as possible

Nov 19th~20th : Beamtime starts, setup on beamline

Nov 20th ~ 24th : As soon as the setup finished, start comissioning run followed by strip scan and run as long as possible

Nov 25th : end of the beamtime (could be extended) , withdraw from beamline

Page 5: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Beam line setup

e-

Veto counter

Movablestage

SciFitracker

Stripscintillators

ScintiCounter(3x3cm)

• Each SCT has 2 layers with a small stereo angle.

Atlas SCT(6x12cm)

Trigger counters(4x11cm?)

temp.sensor

Page 6: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Scintillator-strip assembly

spacer

• As done at the DESY BT, strips will be mounted in acrylic frame, and the scintillator layers will be installed in the detector frame and light shielded.

• To all the MPPC, uniform bias voltage will be applied by source meter.• Signal from MPPCs will be read by CAMAC ADC after signal amplification by ATLAS ASD.

Frame

Page 7: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Operation / Readout electronics

• Scintillator strips … MPPCs are biased by source meter, signal will be amplified by ATLAS ASD and read with CAMAC ADC.• Trigger / veto counters … read with CAMAC ADC.• SciFi tracker … (amp+) discri + CAMAC coincidence register.• SCT … need dedicated VME modules and software.• Movable stage … need dedicated system.• Temperature sensor … can be read by Windows PC ?

Page 8: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Strips to be tested- Let’s start with newer stuff, since beam time and rate are limited -

1. Extruded 3 mm thick direct readout without TiO2

2. Extruded 3 mm thick fiber EMBEDDED readout with TiO2

3. Extruded 3 mm thick fiber EMBEDDED readout without TiO2

4. Extruded 3 mm thick fiber readout with TiO2

5. Extruded 3 mm thick direct readout with TiO2

6. Extruded 3 mm thick fiber readout without TiO2

7. Kuraray strip 3 mm thick fiber readout8. Kuraray strip 3 mm thick direct readout9. Kuraray strip 2 mm thick direct readout

Old ones

Newly produced

Kuraray as Reference

• Will start with (1~3)+7 with ~3 different strips, and if time permits test 9, 8 and 4, and if time permits we will test 9, 8 and 4~5.• Use the same MPPCs if possible, for direct comparison.• Detailed plan will be finalized at kick-off and on-shift meeting.

Page 9: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Run Plan and DAQ Time Estimation

• Assume ~1000 events / mm2 (is it enough?)• 10 x 45 x 1000 = 450000 events per a strip• 450k events / 10 (30) Hz = 750 (250) min per a strip• Random trigger run ~ 5 min, taken once per an hour• 12~13 (4~5) hours to scan one strip.• Perform multiple (2~3) layers scan.• Configuration change ~ 2 hours (?)

Need to take data with MIP position scan andRandom trigger (pedestal and MPPC gain by dark noise)With each type of scintillator.

Red numbers … estimation with the SCT

Page 10: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Data Monitoring & Analysis

• We will perform “on-the-fly” analysis during data taking.• Need always to watch gain (by pedestal run), light yield, and position dependence for all the strips on bea

mline.• Better to plot the temperature, too.• The analysis will run on Linux PC.

Page 11: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Startup jobs• DAQ system and Electronics (1 staff+1 student)

– Operation of CAMAC, SCT, temperature monitoring system and movable stage.– Manage trigger logic and electronics.

• Beamline devices (1+3)– Maintain trigger, veto, SciFi, SCT hardware– Installation (need to make support frames), cabling, alignment, HV, s

etting threshold and timing.• Detector + movable stage (1+1~2)

– Assemble scintillator-strip module, alignment, connection, cabling.– Check signal by beta-ray source– Detector and movable stage installation on beamline– Install temprature monitoring sensors at the same time.

• Analysis codes (0~1 + 0~1)– Discuss data format with DAQ team– Prepare root macro for “on-the-fly” analysis

Page 12: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Shift plan

• 3 shifts per a day (0~8, 8~16, 16~24), 2~3 persons (at least 1 staff + students) in one shift.• Official language is English during the beam test ! To share all the information, DO NOT use Japanese as possible as you can !• Contact me anytime (Satoru : 080-3500-8846) if you have any trouble during your shift.

Page 13: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Stuffs to borrow from KEK

• Movable stage and PC for control (from KEK ATLAS group)• CAMAC and NIM crates, modules

– Conicidence registers– Discriminators– Gate generators– Delay modules– NIM amps– Linear fan-out– Visual scaler– Clock generator

• Electric parts• Beta-ray source• And more …

Page 14: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Stuffs to borrow from Kobe

• Keithley source meter

• Temperature monitoring system

• ATLAS ASD system x 1

• SciFi tracker (and signal cables if possible)

• CAMAC ADC (HOSHIN C009) x 1

Page 15: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Stuffs to borrow from Shinshu• ATLAS ASD system x 1• Detector frames, flat cable, layer structure• Kuraray strip scintillators (2mm, 3mm thick)• Reflector film, white PET film• Flat cable-ASD interface (hand-made)• Many small stuffs (connectors, cables, tools, multimeters, black sheets, ground cables, t

apes, clamps, テプラ … )

• CAMAC ADC HOSHIN C009 x 2• NIM-TTL converter• Trigger / Veto counters• Analysis PC (ilccal01)

Page 16: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Stuffs to borrow from Tsukuba

• ATLAS SCT system• DAQ PC (Windows) … does it have enough disk space?• CAMAC Crate Controller• CAMAC ADC HOSHIN C009 x 2• Trigger support frames• Oscilloscope• Soldering tools (available at KEK?)• Many small stuffs• Hamamatsu PMT amp (C5594) and power supply• And more …

Page 17: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Shipping of the equipments(from Shinshu and Kobe to KEK)

• Please ship equipments to Miyamoto-san at KEK with sign of “GLDCAL beamtest equipments”.

• Make sure that stuffs will arrive on time (by Nov-12~13).

〒 305-0801 茨城県つくば市大穂 1-1高エネルギー加速器研究機構 素粒子原子核研究所宮本 彰也 教授

Page 18: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Radiation training / accommodation

• Make registration as KEK rad-worker ASAP via the KEK web site! ( http://www.kek.jp/uskek/ )

• In addition to the rad training at KEK, beamline lecture will be needed.

I will ask KEK person to give a lecture on Oct-16 (Fri).• For accommodation, you have to make the KEK dorm re

servation by yourselves!• Unfortunately dormitory is already full for some dates (No

v-13,14,19,20..), but you can join to waiting list.• After the reservation, let me know which date you couldn’

t take the room, then I will try to find another accomodation for those days.

• Let me know if you have any questions.

Page 19: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Is there anything missing?

Page 20: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Backup info.

Page 21: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

The KEK new test beam line

North

Gate

Fuji experimenthall

Bus-stop to arrivefrom Tsukuba station

Bus-stop to departto station

Mt. Tsukuba

See http://www.kek.jp/intra-e/accessfor travel info to KEK.(buses are available from NaritaAirport to Tsukuba station,and station to KEK.)

Page 22: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

KEK new test beam line(http://fujibeam.kek.jp but in Japanese.)

ExperimentalStage (7 x 4 m)

• Electron beam line in Fuji experiment hall, 3rd floor in basement.• Make use of bremss photons from KEKB ring• p = 0.5 – 3.4 GeV/c, p/p = 0.4 %• Rate ~ 100 Hz @ 3 GeV• Beam spot size = +- 1cm

KEKB tunnel

Page 23: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Beam area

catwalkStair

Fuji exp-hall3rd floor

in basement

EV

Countingroom

Page 24: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Equipments• CAMAC crate & module (ADC, coinc. reg.)• NIM crate & module• VME crate & module• DAQ PC with CAMAC & VME interfaces• Bias voltage source• Movable stage and controller• SciFi tracker, cables• Trigger counter• ATLAS SCT• ATLAS ASD and Cables• Temperature monitoring system• Drivers, testers, cutters, black-sheets, tapes, etc…

Page 25: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Beam test setup (if the SCT doesn’t work)

e-

TriggerCounters

Veto counter Veto counter

Movablestage

SciFitracker

Stripscintillators

• Analog signal from trigger and veto counters will be useful to reject shower events.• X-Y tracking by SciFi detector (by 1mm scintillating fibers).• Since there is only 1 X-Y tracker available, the tracker should be as close as possible to the strip scintillators.• Strips will be mounted in the frame used at the DESY BT.• Target strips will be placed on 1st layer, latter layers may be used for offline MIP selection.

TriggerCounter

Page 26: Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Memo (just not to forget)

• Beamline alignment• Log book ?• Noise rejection• Need to find a place and tools in KEK for solderin

g, machining, drilling and so on.• Daily-meeting schedule ? And where ?• Light shielding frame• Connecting DAQ & analysis PC to KEK network