Edgewood Circle Sinkhole
Group Members: Kaitlyn Benson, Tyler Gardner, Ryan Tillman, and Matt Tsui
Introduction
•Orchard Park at Edgewood Circle•Current Issues
• Water inputs all leading to sinkhole• Ponding for extended time
Design
Basin #170ft X 36ft
Basin #250 ft X 50 ft
Sinkhole
Upstream
Downstream
Calculations & Results
2 year-24 hour Storm Event•Saxton + Southgate Watersheds (Piped Flow): 12.95 cfs•Orchard Park Watershed: 23.43cfs•Possible 3.4 million gallons total•Reduction of ≈1 million gallons
• 25% decrease
•Upstream basins empties in 16 hours• Downstream basin- 7.25 hours
Cost & Education
Net Total Cost= $5,640.39
•Basin Excavation Cost•Riprap•Vegetation•Education Sign
Local School List:•State College Area High School•Our Lady of Victory•Our Children Center•Nittany Valley Charter School•Centre Learning Community School•State College Friends School
Thank You!