Edgewood Circle Sinkhole
Group Members: Kaitlyn Benson, Tyler Gardner, Ryan Tillman, and Matt Tsui
Introduction
Orchard Park at Edgewood Circle Current Issues
Water inputs all leading to sinkhole Ponding for extended time
Design
Basin #170ft X 36ft
Basin #250 ft X 50 ft
Sinkhole
Upstream
Downstream
Calculations & Results
2 year-24 hour Storm Event Saxton + Southgate Watersheds (Piped Flow): 12.95 cfs
Orchard Park Watershed: 23.43cfs Possible 3.4 million gallons total Reduction of 1 million gallons
25% decrease Upstream basins empties in 16 hours
Downstream basin- 7.25 hours
Cost & Education
Net Total Cost= $5,640.39
Basin Excavation Cost Riprap Vegetation Education Sign
Local School List: State College Area High School Our Lady of Victory Our Children Center Nittany Valley Charter School Centre Learning Community School
State College Friends School
Thank You!