BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
NORTH TO SOUTH DIRECTIONA1 Top and Bottom Rebar 16 6,220
QTY 1 Aktual Panjang (m) 261.2
5900
192 192
42 NOS
A2 Top and Bottom Rebar 16 6,224 QTY 1 Aktual Panjang (m) 12.4
5904
192 192
2 NOS
A3 Top and Bottom Rebar 16 6,241 QTY 1 Aktual Panjang (m) 12.5
-
Page 2 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
5921
192 192
2 NOS
A4 Top and Bottom Rebar 16 6,268 QTY 1 Aktual Panjang (m) 12.5
5948
192 192
2 NOS
-
Page 3 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
A5 Top and Bottom Rebar 16 6,307 QTY 1 Aktual Panjang (m) 12.6
5987
192 192
2 NOS
A6 Top and Bottom Rebar 16 6,357 QTY 1 Aktual Panjang (m) 12.7
6037
192 192
2 NOS
A7 Top and Bottom Rebar 16 6,419 QTY 1 Aktual Panjang (m) 12.8
6099
-
Page 4 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)192 192
2 NOS
A8 Top and Bottom Rebar 16 6,494 QTY 1 Aktual Panjang (m) 13.0
6174
192 192
2 NOS
-
Page 5 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
A9 Top and Bottom Rebar 16 6,580 QTY 1 Aktual Panjang (m) 13.2
6260
192 192
2 NOS
A10 Top and Bottom Rebar 16 6,680 QTY 1 Aktual Panjang (m) 13.4
6360
192 192
2 NOS
A11 Top and Bottom Rebar 16 6,792 QTY 1 Aktual Panjang (m) 13.6
6472
-
Page 6 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)192 192
2 NOS
A12 Top and Bottom Rebar 16 6,918 QTY 1 Aktual Panjang (m) 13.8
6598
192 192
2 NOS
-
Page 7 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
A13 Top and Bottom Rebar 16 7,059 QTY 1 Aktual Panjang (m) 14.1
6739
192 192
2 NOS
A14 Top and Bottom Rebar 16 7,215 QTY 1 Aktual Panjang (m) 14.4
6895
192 192
2 NOS
A15 Top and Bottom Rebar 16 7,388 QTY 1 Aktual Panjang (m) 14.8
7068
-
Page 8 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)192 192
2 NOS
A16 Top and Bottom Rebar 16 7,579 QTY 1 Aktual Panjang (m) 15.2
7259
192 192
2 NOS
-
Page 9 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
A17 Top and Bottom Rebar 16 7,789 QTY 1 Aktual Panjang (m) 15.6
7469
192 192
2 NOS
A18 Top and Bottom Rebar 16 8,021 QTY 1 Aktual Panjang (m) 16.0
7701
192 192
2 NOS
A19 Top and Bottom Rebar 16 8,276 QTY 1 Aktual Panjang (m) 16.6
7956
-
Page 10 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)192 192
2 NOS
A20 Top and Bottom Rebar 16 8,558 QTY 1 Aktual Panjang (m) 17.1
8238
192 192
2 NOS
-
Page 11 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
A21 Top and Bottom Rebar 16 8,871 QTY 1 Aktual Panjang (m) 17.7
8551
192 192
2 NOS
A22 Top and Bottom Rebar 16 9,221 QTY 1 Aktual Panjang (m) 18.4
8901
192 192
2 NOS
A23 Top and Bottom Rebar 16 9,616 QTY 1 Aktual Panjang (m) 19.2
9296
-
Page 12 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)192 192
2 NOS
A24 Top and Bottom Rebar 16 10,068 QTY 1 Aktual Panjang (m) 20.1
9748
192 192
2 NOS
-
Page 13 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
A25 Top and Bottom Rebar 16 10,600 QTY 1 Aktual Panjang (m) 21.2
10280
192 192
2 NOS
A26 Top and Bottom Rebar 16 11,250 QTY 1 Aktual Panjang (m) 22.5
10930
192 192
2 NOS
A27 Top and Bottom Rebar 16 11,936 QTY 1 Aktual Panjang (m) 23.9
11808
-
Page 14 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)192
2 NOS
A27 Top and Bottom Rebar 16 765 QTY 1 Aktual Panjang (m) 1.5
637
192
2 NOS
-
Page 15 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
WEST TO EAST DIRECTIONB1 Top and Bottom Rebar 16 7,220
QTY 1 Aktual Panjang (m) 693.1
6900
192 192
96 NOS
B2 Top and Bottom Rebar 16 3,172 QTY 1 Aktual Panjang (m) 12.7
2852
192 192
4 NOS
B3 Top and Bottom Rebar 16 2,735 QTY 1 Aktual Panjang (m) 10.9
-
Page 16 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)2415
192 192
4 NOS
B4 Top and Bottom Rebar 16 2,410 QTY 1 Aktual Panjang (m) 9.6
2090
192 192
4 NOS
-
Page 17 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
B5 Top and Bottom Rebar 16 2,144 QTY 1 Aktual Panjang (m) 8.6
1824
192 192
4 NOS
B6 Top and Bottom Rebar 16 1,918 QTY 1 Aktual Panjang (m) 7.7
1598
192 192
4 NOS
B7 Top and Bottom Rebar 16 1,720 QTY 1 Aktual Panjang (m) 6.9
1400
-
Page 18 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)192 192
4 NOS
B8 Top and Bottom Rebar 16 1,545 QTY 1 Aktual Panjang (m) 6.2
1225
192 192
4 NOS
-
Page 19 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
B9 Top and Bottom Rebar 16 1,389 QTY 1 Aktual Panjang (m) 5.6
1069
192 192
4 NOS
B10 Top and Bottom Rebar 16 1,248 QTY 1 Aktual Panjang (m) 5.0
928
192 192
4 NOS
B11 Top and Bottom Rebar 16 1,120 QTY 1 Aktual Panjang (m) 4.5
800
-
Page 20 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)192 192
4 NOS
B12 Top and Bottom Rebar 16 1,005 QTY 1 Aktual Panjang (m) 4.0
685
192 192
4 NOS
-
Page 21 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
B13 Top and Bottom Rebar 16 899 QTY 1 Aktual Panjang (m) 3.6
579
192 192
4 NOS
B14 Top and Bottom Rebar 16 804 QTY 1 Aktual Panjang (m) 3.2
484
192 192
4 NOS
B15 Top and Bottom Rebar 16 717 QTY 1 Aktual Panjang (m) 2.9
397
-
Page 22 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)192 192
4 NOS
B16 Top and Bottom Rebar 16 640 QTY 1 Aktual Panjang (m) 2.6
320
192 192
4 NOS
-
Page 23 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
B17 Top and Bottom Rebar 16 570 QTY 1 Aktual Panjang (m) 2.3
250
192 192
4 NOS
B18 Top and Bottom Rebar 16 506 QTY 1 Aktual Panjang (m) 2.0
186
192 192
4 NOS
B19 Support Rebar 13 946 QTY 1 Aktual Panjang (m) 40.7 D13-1000
250
-
Page 24 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)150 150
250 250 43 NOS `
B20 Main Rebar 16 1,376 QTY 1 Aktual Panjang (m) 56.4
192400
480 400
41 NOS
-
Page 25 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
C1 Dowel 22 500 QTY 1 Aktual Panjang (m) 13.0 D22-500
500
26 NOS
KEBUTUHAN TOTAL Pemakaian TOTAL (Kg) CARGILL APPROVAL
REBAR D13 = 4 50.07 REBAR D16 = 215.00 4,077.04 REBAR D22 = 2.00 71.70
4,127.11 TOTAL ACTUAL
PER mREBAR D13 = 41 42.44 REBAR D16 = 1,519.93 2,401.86
-
Page 26 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp AREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
REBAR D22 = 13.00 38.84 2,444.30
-
Page 27 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
NORTH TO SOUTH DIRECTION 42 1 42 12,000 1.00 5,780.00 42.00 Waste
`
2 1 2 12,000 1.00 5,776.00 2.00 Waste
`
2 1 2 12,000 1.00 5,759.00 2.00 Waste
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
-
Page 28 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
`
2 1 2 12,000 1.00 5,732.00 2.00 Waste
`
-
Page 29 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
2 1 2 12,000 1.00 5,693.00 2.00 Waste
`
2 1 2 12,000 1.00 5,643.00 2.00 Waste
`
2 1 2 12,000 1.00 5,581.00 2.00 Waste
`
-
Page 30 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
2 1 2 12,000 1.00 5,506.00 2.00 Waste
`
-
Page 31 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
2 1 2 12,000 1.00 5,420.00 2.00 Waste
`
2 1 2 12,000 1.00 5,320.00 2.00 Waste
`
2 1 2 12,000 1.00 5,208.00 2.00 Waste
`
-
Page 32 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
2 1 2 12,000 1.00 5,082.00 2.00 Waste
`
-
Page 33 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
2 1 2 12,000 1.00 4,941.00 2.00 Waste
`
2 1 2 12,000 1.00 4,785.00 2.00 Waste
`
2 1 2 12,000 1.00 4,612.00 2.00 Waste
`
-
Page 34 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
2 1 2 12,000 1.00 4,421.00 2.00 Waste
`
-
Page 35 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
2 1 2 12,000 1.00 4,211.00 2.00 Waste
`
2 1 2 12,000 1.00 3,979.00 2.00 Waste
`
2 1 2 12,000 1.00 3,724.00 2.00 Waste
`
-
Page 36 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
2 1 2 12,000 1.00 3,442.00 2.00 Waste
`
-
Page 37 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
2 1 2 12,000 1.00 3,129.00 2.00 Waste
`
2 1 2 12,000 1.00 2,779.00 2.00 Waste
`
2 1 2 12,000 1.00 2,384.00 2.00 Waste
`
-
Page 38 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
2 1 2 12,000 1.00 1,932.00 2.00 Waste
`
-
Page 39 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
2 1 2 12,000 1.00 1,400.00 2.00 Waste
`
2 1 2 12,000 1.00 750.00 2.00 Waste
`
2 1 2 12,000 1.00 64.00 2.00 Waste
`
-
Page 40 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
2 1 2 12,000 15.00 10,470.00 1.00 Waste
`
-
Page 41 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
WEST TO EAST DIRECTION 96 1 96 12,000 1.00 4,780.00 96.00 Waste
`
4 1 4 12,000 3.00 2,484.00 2.00 Waste
`
4 1 4 12,000 4.00 1,060.00 1.00 Waste
`
-
Page 42 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
4 1 4 12,000 4.00 2,360.00 1.00 Waste
`
-
Page 43 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
4 1 4 12,000 5.00 3,424.00 1.00 Waste
`
4 1 4 12,000 6.00 4,328.00 1.00 Waste
`
4 1 4 12,000 6.00 5,120.00 1.00 Waste
`
-
Page 44 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
4 1 4 12,000 7.00 5,820.00 1.00 Waste
`
-
Page 45 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
4 1 4 12,000 8.00 6,444.00 1.00 Waste
`
4 1 4 12,000 9.00 7,008.00 1.00 Waste
`
4 1 4 12,000 10.00 7,520.00 1.00 Waste
`
-
Page 46 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
4 1 4 12,000 11.00 7,980.00 1.00 Waste
`
-
Page 47 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
4 1 4 12,000 13.00 8,404.00 1.00 Waste
`
4 1 4 12,000 14.00 8,784.00 1.00 Waste
`
4 1 4 12,000 16.00 9,132.00 1.00 Waste
`
-
Page 48 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
4 1 4 12,000 18.00 9,440.00 1.00 Waste
`
-
Page 49 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
4 1 4 12,000 21.00 9,720.00 1.00 Waste
`
4 1 4 12,000 23.00 9,976.00 1.00 Waste
`
43 1 43 12,000 12.00 648.00 4.00 Waste
`
-
Page 50 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
41 1 41 12,000 8.00 992.00 6.00 Waste
`
-
Page 51 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
26 1 26 12,000 24.00 - 2.00 Waste
`
Cikande, ........................................................ 2015
Diajukan oleh,PT Wijaya Karya Industri Konstruksi
-
Page 52 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
-
Page 53 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp BREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
NORTH TO EAST DIRECTIONA1 Top and Bottom Rebar 16 11,936
QTY 1 Aktual Panjang (m) 978.8
11808
192
82 NOS
A1 Top and Bottom Rebar 16 11,936 QTY 1 Aktual Panjang (m) 978.8
12000
82 NOS
A1 Top and Bottom Rebar 16 2,500
-
Page 54 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp BREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
QTY 1 Aktual Panjang (m) 205.0
2372
192
82 NOS
-
Page 55 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp BREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
A2 Main Rebar 16 1,376 QTY 1 Aktual Panjang (m) 112.8
192400
480 400
82 NOS
EAST TO WEST DIRECTIONB1 Top and Bottom Rebar 16 6,220
QTY 1 Aktual Panjang (m) 2,077.5
5900
192 192
334 NOS
B2 Support Rebar 13 946
-
Page 56 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp BREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
QTY 1 Aktual Panjang (m) 142.8 D13-1000
250
150 150
250 250 151 NOS `
-
Page 57 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp BREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
C1 Dowel 22 500 QTY 1 Aktual Panjang (m) 13.0 D22-500
500
26 NOS
TOTAL NECESSARYPemakaian TOTAL (Kg) CARGILL APPROVAL
REBAR D13 = 13 162.74 REBAR D16 = 530.00 10,050.37 REBAR D22 = 2.00 71.70
10,284.81 TOTAL ACTUAL
PER mREBAR D13 = 143 149.02 REBAR D16 = 4,352.82 6,878.52
-
Page 58 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp BREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
REBAR D22 = 13.00 38.84 7,066.38
-
Page 59 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
NORTH TO EAST DIRECTION 82 1 82 12,000 1.00 64.00 82.00 Waste
`
82 1 82 12,000 1.00 64.00 82.00 Waste
`
82 1 82 12,000 4.00 2,000.00 21.00 Waste
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
-
Page 60 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
`
-
Page 61 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
82 1 82 12,000 8.00 992.00 11.00 Waste
`
EAST TO WEST DIRECTION 334 1 334 12,000 1.00 5,780.00 334.00 Waste
`
151 1 151 12,000 12.00 648.00 13.00 Waste
-
Page 62 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
`
-
Page 63 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
26 1 26 12,000 24.00 - 2.00 Waste
`
Cikande, ........................................................ 2015
Diajukan oleh,PT Wijaya Karya Industri Konstruksi
-
Page 64 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
-
Page 65 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp CREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
NORTH TO SOUTH DIRECTIONA1 Top and Bottom Rebar 16 11,968
QTY 1 Aktual Panjang (m) 981.4
11808
192
82 NOS
A1 Top and Bottom Rebar 16 4,892 QTY 1 Aktual Panjang (m) 401.1
4732
192
82 NOS
-
Page 66 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp CREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
A2 Main Rebar 16 1,376 QTY 1 Aktual Panjang (m) 112.8
192400
480 400
82 NOS
WEST TO EAST DIRECTIONB1 Top and Bottom Rebar 16 6,220
QTY 1 Aktual Panjang (m) 1,343.5
5900
192 192
216 NOS
B2 Support Rebar 13 946
-
Page 67 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp CREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
QTY 1 Aktual Panjang (m) 91.8 D13-1000
250
150 150
250 250 97 NOS `
-
Page 68 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp CREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
C1 Dowel 22 500 QTY 1 Aktual Panjang (m) 13.0 D22-500
500
26 NOS
TOTAL NECESSARYPemakaian TOTAL (Kg) CARGILL APPROVAL
REBAR D13 = 9 112.67 REBAR D16 = 350.00 6,637.04 REBAR D22 = 2.00 71.70
6,821.41 TOTAL ACTUAL
PER mREBAR D13 = 92 95.73 REBAR D16 = 2,838.87 4,486.12
-
Page 69 of 74
BAR BENDING SCHEDULE
Proyek : West Java SweetenerLokasi : Process BuildingStruktur : Ramp CREVISI : 0
NO DESKRIPSID PANJANG
(mm) (mm)
REBAR D22 = 13.00 38.84 4,581.85
-
Page 70 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
NORTH TO SOUTH DIRECTION 82 1 82 12,000 1.00 32.00 82.00 Waste
`
82 1 82 12,000 2.00 2,216.00 41.00 Waste
`
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
-
Page 71 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
82 1 82 12,000 8.00 992.00 11.00 Waste
`
WEST TO EAST DIRECTION 216 1 216 12,000 1.00 5,780.00 216.00 Waste
`
97 1 97 12,000 12.00 648.00 9.00 Waste
-
Page 72 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
`
-
Page 73 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
26 1 26 12,000 24.00 - 2.00 Waste
`
Cikande, ........................................................ 2015
Diajukan oleh,PT Wijaya Karya Industri Konstruksi
-
Page 74 of 74
BAR BENDING SCHEDULE
JMLH POT QTY JUMLAH LONJOR KET
(ea) (Pcs) (Pcs) (mm) (pcs) (mm) (pcs)
TOTAL KEBUTUHAN
PANJANG PABRIKAN
TOTAL POTONGAN PER
LONJOR
PANJANG SISA PER LONJOR
RAMP ARAMP BRAMP C