BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,,...

35
Start Is the loading and/or unloading facility located in the Beaumont/Port Arthur, Dallas/Ft. Worth, El Paso, or Houston/Galveston areas as defined in §115.10? Yes 1 21 §115.211(1) §115.219(d) End 30 TAC Chapter 115, Subchapter C, Division 1: Loading and Unloading of VOC does not apply. Yes §115.211(2) No Is the loading and/or unloading facility located in one of the covered attainment counties as defined in §115.10? No Below is a fl flowchart t describing 30 TAC Chap. 115, Su Subchap. C, Division 1. It t will likely not t be accessible using a screen reader. For th the te text t of f th the sta tatu tute te/rule, please go to to 30 TAC Chapte ter 115, Su Subchapte ter C, Division 1: : Loading and Unloading of f VO VOC (1 of f 35 35) Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015 layered These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

Transcript of BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,,...

Page 1: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

Start

Is the loading and/or

unloading facility located

in the Beaumont/Port Arthur,

Dallas/Ft. Worth, El Paso, or

Houston/Galveston areas

as defined in §115.10?

Yes 1

21

§115.211(1)§115.219(d)

End

30 TAC Chapter 115,

Subchapter C, Division 1:

Loading and Unloading of VOC

does not apply.

Yes

§115.211(2)

No

Is the loading

and/or unloading facility

located in one of the covered

attainment counties as

defined in §115.10?

No

BBeellooww iiss aa flfloowwcchhaarrt t ddeessccrriibbiinngg 3300 TTAACC CChhaapp.. 111155,, SuSubbcchhaapp.. CC,, DDiivviissiioonn 11.. IIt t wwiillll lliikkeellyy nnoot t bbee aacccceessssiibbllee uussiinngg aa ssccrreeeenn rreeaaddeerr.. FFoorr ththee tetexxt t oof f ththee sstatatututete//rruullee,, pplleeaassee ggoo toto

3300 TTAACC CChhaappteterr 111155,, SuSubbcchhaappteterr CC,, DDiivviissiioonn 11: : LLooaaddiinngg aanndd UUnnllooaaddiinngg oof f VOVOCC((11 oof f 3535))

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015 layeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

Page 2: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

30 TAC Chapter 115, Loading and Unloading of VOC

(2 of 35)

End

Is the facility

a motor vehicle fuel dispensing

facility?

§115.217(a)(4)

§115.217(a)(3)

4

Is the facility

only transferring liquefied petroleum gas?

2

Yes

3

Is the facility

land based and loading

VOC with a TVP less than 0.5

psia under actual storage

conditions? §115.217(a)(1)

5

Does the plant,

excluding gasoline bulk plants,

as defined by its TCEQ air quality account number, load less than 20,000 gallons (75,708 liters) of VOC, with a TVP

greater than or equal to 0.5 psia, into transport vessels per day (averaged over

30-day period)?

§115.217(a)(2)(A)

No

1

No

Yes

Yes

YesNo

No

30 TAC Chapter 115,

Subchapter C, Division 1:

Loading and Unloading of VOC

does not apply.

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 3: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

Comply with the following:Standard

§115.217(a)(1)§115.214(a)(1)(B)

§115.214(a)(1)(D)§115.214(a)(1)(D)(i)

Monitoring/Testing

§115.214(a)(1)(A)

§115.214(a)(1)(A)(i)

§115.215, (4)Recordkeeping

§115.216

§115.216(2)

§115.216(3)(B)

Comply with the following:Standard

§115.217(a)(3)

§115.214(a)(1)(B)

§115.214(a)(1)(D)

§115.214(a)(1)(D)(i) Monitoring/Testing

§115.214(a)(1)(A)

§115.214(a)(1)(A)(i)Recordkeeping

§115.216

§115.216(3)(A)

§115.216(3)(A)(i)

§115.216(3)(A)(ii)§115.216(3)(A)(iii)

§115.216(3)(B)

End

2 3

Comply with the following:

Standard§115.217(a)(2)(A)

[G]§115.212(a)(7)

§115.214(a)(1)(B) §115.214(a)(1)(D)

§115.214(a)(1)(D)(i)Monitoring/Testing

§115.214(a)(1)(A)

§115.214(a)(1)(A)(i)§115.215, (4)

Recordkeeping

§115.216

§115.216(2)§115.216(3)(B), (3)(D)

4

§115.212(a)(2)

Is the facility

unloading?

No

YesComply with the following:

Standard

§115.212(a)(2)

30 TAC Chapter 115, Loading and Unloading of VOC

(3 of 35)

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 4: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

5

Is the

facility unloading

only?

§115.212(a)(2)

Comply with the following:Standard

§115.212(a)(3)

§115.212(a)(2)

§115.212(a)(3)(B)

[G]§115.212(a)(3)(C), (a)(3)(D)

§115.214(a)(1)(B), (a)(1)(C)

Monitoring/Testing

§115.212(a)(3)(B)

§115.214(a)(1)(A)

§115.214(a)(1)(A)(i)-(iii)

Recordkeeping

§115.216

§115.216(3)(A), (3)(A)(i), (3)(A)(iii)

End

6

Are all liquid

and vapor lines equipped with

fittings which make vapor-tight connections

that close automatically when

disconnected?

Comply with the following:

Standard

§115.212(a)(3)(A)

§115.212(a)(3)(A)(ii)

Comply with the following:

Standard

§115.212(a)(3)(A)

§115.212(a)(3)(A)(i)

§115.212(a)(3)(A)(i)

Yes 13

Is the loading

and unloading facility a

marine terminal?

§115.212(a)(6)

Yes

No

No

Yes No

30 TAC Chapter 115, Loading and Unloading of VOC

(4 of 35)

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 5: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

6

11

§115.211(2)

9

§115.212(a)(4)

Is the VOC

transferring facility a gasoline terminal?

Is the VOC

transferring facility a gasoline

bulk plant?

§115.213(a)

Are

alternative methods

used for demonstrating and

documenting continuous compliance with the

applicable control requirements

or exemption

criteria?

18

7

YesNo

Yes

No

No

Yes

30 TAC Chapter 115, Loading and Unloading of VOC

(5 of 35)

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 6: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

Comply with the following:

Standard

§115.212(a)(1)

§115.212(a)(3)(B)

[G]§115.212(a)(3)(C), (a)(3)(E)

§115.214(a)(1)(B), (a)(1)(C)

Monitoring/Testing§115.212(a)(3)(B)

§115.214(a)(1)(A)

§115.214(a)(1)(A)(i)-(iii)

§115.215, (1), [G](2), (4), (9), (10)

Recordkeeping

§115.216, (2), (3)(A), (3)(A)(i)

§115.216(3)(A)(ii), (3)(A)(iii)

§115.216(3)(B)

Are all liquid and

vapor lines equipped with

fittings which make vapor-tight connections

that close automatically

when disconnected?

Comply with the following:

Standard

§115.212(a)(3)(A)

§115.212(a)(3)(A)(ii)

Comply with the following:

Standard

§115.212(a)(3)(A)

§115.212(a)(3)(A)(i)

8

§115.212(a)(3)(A)(i)

7

Yes No

30 TAC Chapter 115, Loading and Unloading of VOC

(6 of 35)

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 7: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

Does the loading

and/or unloading facility

control VOC emissions from transfer

operations with a vapor

balance system?

Does the

loading and/or

unloading facility control VOC

emissions from transfer operations with a vapor control system with

a control efficiency of at

least 90%?

Yes

Comply with the following:

Standard§115.212(a)(1)(A)

No

Comply with the following:

Standard

§115.212(a)(1)(B)

End

§115.212(a)(1)(A)

Yes

§115.212(a)(1)(B)

No

Comply with the following:

Standard

§115.212(a)(1)(C)

8

37

§115.212(a)(2)

Is the facility

unloading?

No

YesComply with the following:

Standard

§115.212(a)(2), (a)(3)(D)

30 TAC Chapter 115, Loading and Unloading of VOC

(7 of 35)

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 8: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

9

Comply with the following:Standard

§115.211(1)

§115.212(a)(3)(B), [G](a)(3)(C), (a)(3)(E)

§115.212(a)(4)(A), (a)(4)(B)

§115.214(a)(1)(B), (a)(1)(C)

Monitoring/Testing

§115.212(a)(3)(B), [G](a)(3)(C)

§115.214(a)(1)(A), (a)(1)(A)(i)-(iii)

§115.214(a)(2)

§115.215, (1), [G](2), (4), (5)

§115.215(6), (9), (10)

Recordkeeping

§115.216, (2), (3)(A), (3)(A)(i)

§115.216(3)(A)(ii), (3)(A)(iii)§115.216(3)(B), [G](3)(E)

§115.212(a)(3)(A)(i)

No

§115.213(a)

Are all liquid and

vapor lines equipped with fitting

which make vapor-tight connections

that close automatically when

disconnected?

Are alternative methods

used for demonstrating and documenting continuous compliance with the

applicable control requirements

or exemption criteria?

10

Comply with the following:

Standard

§115.212(a)(3)(A)

§115.212(a)(3)(A)(i)

Comply with the following:

Standard

§115.212(a)(3)(A)

§115.212(a)(3)(A)(ii)

Comply with the following:

Standard

§115.213(a)[G]§115.910

Monitoring/Testing

§115.213(a)

Recordkeeping§115.213(a)

No Yes

End

Yes

30 TAC Chapter 115, Loading and Unloading of VOC

(8 of 35)

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 9: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

Comply with the following:

Standard

§115.212(a)(4)(D)

Monitoring/Testing

§115.212(a)(4)(D)

Is the gasoline

terminal choosing to

comply with §115.212(a)(4)(D) instead of complying with

§115.212(a)(4)(C)?

Comply with the following:

Standard

§115.212(a)(4)(C)Monitoring/Testing

§115.212(a)(4)(C)

§115.212(a)(4)(D)

10

Yes

§115.212(a)(2)

Is the facility unloading?

No

YesComply with the following:

Standard

§115.212(a)(2), (a)(3)(D)

No

37

30 TAC Chapter 115, Loading and Unloading of VOC

(9 of 35)

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 10: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

11

Is the

facility a gasoline

bulk plant that loads less

than 4,000 gallons (15,142 liter)

of gasoline into transport vessels per

day averaged over any

consecutive 30-day period?

No

Comply with the following:

Standard

§115.217(a)(2)(B)

[G]§115.212(a)(7)

§115.214(a)(1)(B)

§115.214(a)(1)(D)

§115.214(a)(1)(D)(i)

Monitoring/Testing

§115.214(a)(1)(A)

§115.214(a)(1)(A)(i)§115.214(a)(1)(B)

Recordkeeping

§115.216§115.216(3)(D)

Yes

§115.217(a)(2)(B)

§115.213(a)

No

Are alternative

methods used for demonstrating and documenting

continuous compliance with the

applicable control requirements

or exemption

criteria?

12

Comply with the following:

Standard

§115.213(a)

[G]§115.910

Monitoring/Testing

§115.213(a)

Recordkeeping

§115.213(a)

Yes

End

§115.212(a)(2)

Is the facility

unloading?

No

Yes

Comply with the following:

Standard

§115.212(a)(2)

30 TAC Chapter 115, Loading and Unloading of VOC

(10 of 35)

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 11: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

Comply with the following:

Standard

§115.212(a)(5)(A)

§115.212(a)(3)(B)[G]§115.212(a)(3)(C), (a)(3)(E)

[G]§115.212(a)(5)(B)

§115.214(a)(1)(B), (a)(1)(C)Monitoring/Testing

§115.212(a)(3)(B)§115.214(a)(1)(A), (a)(1)(A)(i)-(iii)

§115.215, (1), [G](2), (4), (9), (10)Recordkeeping

§115.216, (2), (3)(A), (3)(A)(i)

§115.216(3)(A)(ii), (3)(A)(iii)

§115.212(a)(3)(A)(i)

Are all liquid and

vapor lines equipped with

fittings which make vapor-tight connections

that close automatically when

disconnected?

Comply with the following:

Standard

§115.212(a)(3)(A)

§115.212(a)(3)(A)(i)

Comply with the following:Standard

§115.212(a)(3)(A)

§115.212(a)(3)(A)(ii)

12

Is the gasoline

bulk plant equipped with

a vapor control system between the

storage tank and the transport vessel

with a control efficiency of

at least 90%?

No

§115.212(a)(5)(A)

End

§115.212(a)(2)

Yes

Is the facility

unloading?

No

Comply with the following:

Standard

§115.212(a)(2), (a)(3)(D)

Yes

No

Yes

37

30 TAC Chapter 115, Loading and Unloading of VOC

(11 of 35)

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 12: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

13

§115.217(a)(5)(A)(i)

Is the marine terminal located

in the Houston/Galvestonarea as defined in

§115.10?

14

No

Yes

Is the marine

terminal claiming one of the

exemptions available under §115.217(a)(5)(B)?

15

Comply with the following:

Standard

§115.217(a)(5)(B)

§115.217(a)(5)(B)

§115.214(a)(3)(C), (a)(3)(G)

§115.214(a)(3)(G)(i)

Monitoring/Testing

§115.214(a)(3)(B), (a)(3)(B)(i)

Recordkeeping

§115.216

§115.216(2)

End

NoYes

30 TAC Chapter 115,

Subchapter C, Division 1:

Loading and Unloading of VOC does not apply.

30 TAC Chapter 115, Loading and Unloading of VOC

(12 of 35)

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 13: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

Does

the facility have uncontrolled VOC emissions

less than 100 tons

per year?

Comply with the following:

Standard§115.217(a)(5)(B)(ii)

Monitoring/Testing

§115.215, (1), [G](2)

Yes

No

Yes

Is the

facility unloading marine

vessels?

Comply with the following:

Standard

§115.217(a)(5)(B)(i)

14

§115.217(a)(5)(B)(ii)

§115.217(a)(5)(B)(iv)

Yes

Does the

facility load VOC

with a flash point of 150°F or

greater into marine

vessels?

No

Comply with the following:

Standard

§115.212(a)(6)(D)

§115.217(a)(5)(B)(iv)

Monitoring/Testing

§115.215, (8)

§115.217(a)(5)(B)(i)

End

No

Does the

facility load VOC with a

vapor pressure less than

0.5 psia?

§115.217(a)(5)(B)(iii)

Comply with the following:

Standard

§115.212(a)(6)(D)

§115.217(a)(5)(B)(iii)

Monitoring/Testing§115.215, (4)

Yes

No

30 TAC Chapter 115, Loading and Unloading of VOC

(13 of 35)

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 14: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

15

§115.212(a)(6)(A)

Comply with the following:

Standard

§115.212(a)(6)(A)

§115.212(a)(6)(B)

[G]§115.212(a)(6)(C)

§115.212(a)(6)(D)

[G]115.214(a)(3)(A)

§115.214(a)(3)(C)-(E)

Monitoring/Testing

[G]§115.214(a)(3)(A)

§115.214(a)(3)(B), (a)(3)(B)(i)

§115.214(a)(3)(B)(ii), (a)(3)(B)(iii)

§115.214(a)(3)(D)

§115.215, (1), [G](2), (4)-(5), (7)-(10)

Recordkeeping

[G]§115.214(a)(3)(A)

§115.214(a)(3)(D)

§115.216, (2)

[G]§115.216(4)

Is the marine

terminal equipped with

a vapor control system with

a control efficiency of

at least 90%?

§115.213(a)

No

16

Yes

Yes

End

No

Are alternative methods

used for demonstrating and documenting continuous compliance with the

applicable control requirements

or exemption criteria?

37

30 TAC Chapter 115, Loading and Unloading of VOC

(14 of 35)

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 15: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

Yes

No

Comply with the following:

Standard

§115.213(d)§115.213(d)(3), [G](d)(5)

§115.214(a)(3)(C)

§115.214(a)(3)(G), (a)(3)(G)(ii)

Monitoring/Testing

§115.214(a)(3)(B), (a)(3)(B)(i)

§115.215, (1), [G](2), (4)

§115.215(5), (9), (10)

Recordkeeping

§115.213(d)(1)

§115.216, (2), [G](4)

Reporting

§115.213(d)(1)-(3)

Is the marine

terminal loading VOC

with a true vapor pressure

greater than or equal

to 11 psia?

17

§115.213(d)

§115.213(d)(4)

No

16

Is the marine

terminal electing to comply

with §115.213(d)?

Comply with the following:Standard

§115.213(a)

§115.910

Monitoring/Testing

§115.213(a)Recordkeeping

§115.213(a)

Yes

End

Is a flare or

vapor combustor considered to be a flare used as part of the

alternate control

requirements?

§115.215(3)No

Comply with the following:

Standard

§60.18

Monitoring/Testing

[G]§115.215(3)

Yes

End

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

30 TAC Chapter 115, Loading and Unloading of VOC (15 of 35)

Page 16: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

30 TAC Chapter 115, Loading and Unloading of VOC

(16 of 35)

Yes

Comply with the following:

Standard

§115.213(d)(4), (d)(4)(A)Yes

17

§115.213(d)(4)(A)

Does the

marine terminal

control VOC emissions from

transfer operations by using a

pressurized loading

system?

Comply with the following:

Standard

§115.213(d)(4), (d)(4)(B)

No

§115.213(d)(4)

Comply with the following:Standard

§115.213(d)(4), (d)(4)(C)

Does the

loading and/or unloading

facility control VOC emissions from transfer operations with a vapor

control system with a control

efficiency of at least 90%?

EndNo

Comply with the following:

Standard

§115.212(a)(6)(B)-(D)

[G]§115.214(a)(3)(A)Monitoring/Testing

[G]§115.214(a)(3)(A)

§115.214(a)(3)(B)(ii), (a)(3)(B)(iii)

§115.214(a)(3)(D), (a)(3)(E)

§115.215(7), (8)

Recordkeeping

[G]§115.214(a)(3)(A), (D)

37

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 17: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

18

Comply with the following:

Standard

§115.213(a)

§115.213(b)

[G]§115.910

Monitoring/Testing

§115.213(a)

Recordkeeping

§115.213(a)

Comply with the following:

Standard

§115.213(b)

§115.212(a)(3)(B), (a)(3)(E)

§115.213(b)(1), (b)(4), [G](b)(6)

§115.214(a)(1)(B)

§115.214(a)(1)(D), (a)(1)(D)(ii)

Monitoring/Testing

§115.212(a)(3)(B)

§115.213(b), (b)(1)

§115.214(a)(1)(A), (a)(1)(A)(i)

§115.215, (1), [G](2), (4), (9), (10)

Recordkeeping

§115.213(b)(1)

§115.216, (2), (3)(A), (3)(A)(i)

§115.216(3)(A)(ii), (3)(A)(iii), (3)(B)

Reporting

§115.213(b)(1)-(4)

Is the

loading/unloading facility

electing to comply with

§115.213(b)?

19

End

NoYes

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

30 TAC Chapter 115, Loading and Unloading of VOC (17 of 35)

Page 18: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

Is the

loading/unloading

facility loading VOC with a true vapor pressure greater than or

equal to 11 psia?

§115.213(b)(5)

No

Yes

End

Is a flare or

vapor combustor

considered to be a flare used as part of

the alternate control

requirements?

§115.215(3)

Comply with the following:

Standard

§60.18

Monitoring/Testing

[G]§115.215(3)

Yes

19

§115.212(a)(2)

Is the facility unloading?

No

Comply with the following:

Standard

§115.212(a)(2), (a)(3)(D)

20

Comply with the following:

Standard

§115.214(a)(1)(C)

Monitoring/Testing

§115.214(a)(1)(A)(ii)

§115.214(a)(1)(A)(iii)

Yes

No

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

30 TAC Chapter 115, Loading and Unloading of VOC (18 of 35)

Page 19: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

Yes

Comply with the following:

Standard

§115.213(b)(5), (b)(5)(A)

Yes

§115.213(b)(5)(A)

Does the loading

and/or unloading facility control

VOC emissions from transfer operations

by using a pressurized

loading system?

Comply with the following:

Standard

§115.213(b)(5), (b)(5)(B)

§115.213(b)(5)(B)

Comply with the following:

Standard

§115.213(b)(5), (b)(5)(C)

No

Does the

loading and/or

unloading facility control VOC

emissions from transfer operations with

a vapor control system with a

control efficiency of at

least 90%?

End

20

§115.212(a)(3)(A)(i)

Are all liquid

and vapor lines equipped

with fittings which make vapor-

tight connections that close

automatically when

disconnected?

Comply with the following:

Standard

§115.212(a)(3)(A)

§115.212(a)(3)(A)(i)

Comply with the following:

Standard

§115.212(a)(3)(A)§115.212(a)(3)(A)(ii)

No Yes

No

37

30 TAC Chapter 115, Loading and Unloading of VOC

(19 of 35)

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 20: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

22

Is the facility

a motor vehicle fuel dispensing

facility?

§115.217(b)(5)

Is the loading

and unloading facility a marine

terminal?

Yes

§115.217(b)(6)

21

End

No

No

Is the facility

located in a county other

than Aransas, Bexar, Calhoun, Gregg, Matagorda, Nueces, San Patricio, Travis

or Victoria, and transferring only non-gasoline

VOC?

Yes

§115.217(b)(1)No

23

Is the

facility loading and/or

unloading crude oil, condensate or

liquefied petroleum

gas?

§115.217(b)(4)

Yes

Yes

No

30 TAC Chapter 115,

Subchapter C, Division 1:

Loading and Unloading of VOC

does not apply.

30 TAC Chapter 115, Loading and Unloading of VOC

(20 of 35)

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 21: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

§115.217(b)(3)(A)

Is the facility loading or unloading

VOC with a TVP less than 1.5 psia

under actual storage

conditions?

§115.217(b)(2)

22

Does the

plant, excluding

gasoline bulk plants, as defined by

its air quality account number, load less than 20,000 gallons per day (75,708 liters) of VOC, with a TVP

greater than or equal to 1.5 psia, into transport

vessels per day (averaged over 30-day

period)?

Yes

No

No

25

24

Yes

26

27

Is the owner or operator only

unloading?

§115.212(b)(2)

Yes

No

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

30 TAC Chapter 115, Loading and Unloading of VOC (21 of 35)

Page 22: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

Comply with the following:

Standard§115.217(b)(2)

§115.214(b)(1)(B)

§115.214(b)(1)(D)

§115.214(b)(1)(D)(i)

Monitoring/Testing§115.214(b)(1)(A)

§115.214(b)(1)(A)(i)

§115.215, (4)

Recordkeeping

§115.216, (2)

§115.216(3)(B)

Comply with the following:

Standard§115.217(b)(3)(A)

§115.214(b)(1)(B)

§115.214(b)(1)(D)

§115.214(b)(1)(D)(i)

Monitoring/Testing§115.214(b)(1)(A)

§115.214(b)(1)(A)(i)

§115.215, (4)

Recordkeeping

§115.216, (2)

§115.216(3)(B), (3)(D)

Comply with the following:

Standard§115.217(b)(4)

§115.214(b)(1)(B)

§115.214(b)(1)(D)

§115.214(b)(1)(D)(i)

Monitoring/Testing§115.214(b)(1)(A)

§115.214(b)(1)(A)(i)

Recordkeeping

§115.216, (3)(A)

§115.216(3)(A)(ii)

§115.216(3)(B)

End

23 2524

§115.212(b)(2)

Is the facility

unloading?

No

Yes

Comply with the following:

Standard

§115.212(b)(2)

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

30 TAC Chapter 115, Loading and Unloading of VOC (22 of 35)

Page 23: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

26

Comply with the following:

Standard

§115.212(b)(3)§115.212(b)(2)

§115.212(b)(3)(B)

[G]§115.212(b)(3)(C), (b)(3)(D)§115.214(b)(1)(B), (b)(1)(C)

Monitoring/Testing§115.212(b)(3)(B), [G](b)(3)(C)

§115.214(b)(1)(A)§115.214(b)(1)(A)(i)-(iii)

Recordkeeping

§115.216

§115.216(3)(A), (3)(A)(i), (3)(A)(iii)

End

No

§115.212(b)(3)(A)(i)

Comply with the following:

Standard

§115.212(b)(3)(A)

§115.212(b)(3)(A)(ii)

Yes

Are all

liquid and vapor

lines equipped with

fittings which make vapor-tight

connections that close

automatically when

disconnected?

Comply with the following:

Standard

§115.212(b)(3)(A)

§115.212(b)(3)(A)(i)

30 TAC Chapter 115, Loading and Unloading of VOC

(23 of 35)

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 24: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

28

Is the loading

and unloading facility a

gasoline terminal?

§115.212(b)(4) 30Is the

loading and

unloading facility a

gasoline bulk

plant?

Yes

§115.212(b)(5)

No

Yes

Are

alternative methods

used for demonstrating and

documenting continuous compliance with the

applicable control requirements

or exemption

criteria?

No

34

§115.213(a)

27

32

No Yes

30 TAC Chapter 115, Loading and Unloading of VOC

(24 of 35)

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 25: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

28

Is the facility a

gasoline bulk plant that loads

less than 4,000 gallons (15,142 liter) of

gasoline into transport vessels per day

averaged over any consecutive

30-day period?

Comply with the following:

Standard

§115.217(b)(3)(B)

§115.214(b)(1)(B)

§115.214(b)(1)(D)

§115.214(b)(1)(D)(i)

Monitoring/Testing

§115.214(b)(1)(A)

§115.214(b)(1)(A)(i)Recordkeeping

§115.216

§115.216(3)(D)§115.217(b)(3)(B)

No

Yes

Are

alternative methods

used for demonstrating and

documenting continuous compliance with the

applicable control requirements or exemption

criteria?

29

Comply with the following:

Standard

§115.213(a)

[G]§115.910

Monitoring/Testing

§115.213(a)

Recordkeeping

§115.213(a)

§115.213(a)

§115.212(b)(2)

End

Is the facility

unloading?

No

Comply with the following:

Standard

§115.212(b)(2)

Yes

No

Yes

30 TAC Chapter 115, Loading and Unloading of VOC

(25 of 35)

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 26: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

Comply with the following:

Standard

§115.212(b)(5)(A)

§115.212(b)(3)(B) [G]§115.212(b)(3)(C), (b)(3)(E)

[G]§115.212(b)(5)(B)

§115.214(b)(1)(B), (b)(1)(C)Monitoring/Testing

§115.212(b)(3)(B), [G](b)(3)(C)§115.214(b)(1)(A), (b)(1)(A)(i)-(iii)

§115.215, (1), [G](2), (4), (9), (10)

Recordkeeping

§115.216, (2), (3)(A), (3)(A)(i)

§115.216(3)(A)(ii), (3)(A)(iii)

§115.212(b)(3)(A)(i)

Is the gasoline

bulk plant equipped with a

vapor control system which maintains a

control efficiency of

at least 90%?

29

Are all liquid and

vapor lines equipped with

fittings which make vapor-tight connections

that close automatically

when disconnected?

Comply with the following:

Standard

§115.212(b)(3)(A)

§115.212(b)(3)(A)(ii)

Comply with the following:

Standard

§115.212(b)(3)(A)

§115.212(b)(3)(A)(i)

Yes

§115.212(b)(5)(A)

No End

§115.212(b)(2)

Is the facility

unloading?

No

Comply with the following:

Standard

§115.212(b)(2), (b)(3)(D)

Yes

37

Yes

No

30 TAC Chapter 115, Loading and Unloading of VOC

(26 of 35)

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 27: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

Comply with the following:

Standard§115.211(2)

§115.212(b)(3)(B)[G]§115.212(b)(3)(C), (b)(3)(E)

§115.212(b)(4)(A), (b)(4)(B)§115.214(b)(1)(B), (b)(1)(C)

Monitoring/Testing

§115.212(b)(3)(B), [G](b)(3)(C)

§115.214(b)(1)(A), (b)(1)(A)(i)-(iii)

§115.214(b)(2)

§115.215, (1), [G](2), (4), (5)§115.215(6), (9), (10)

§115.213(a) Recordkeeping

§115.216, (2), (3)(A), (3)(A)(i)

§115.216(3)(A)(ii), (3)(A)(iii)

§115.216(3)(B)

[G]§115.216(3)(E)

30

No

Yes

31

Yes

Are alternative

methods used for

demonstrating and documenting

continuous compliance with the

applicable control requirements

or exemption

criteria?

Comply with the following:

Standard

§115.213(a)[G]§115.910

Monitoring/Testing

§115.213(a)

Recordkeeping

§115.213(a)

Are all

liquid and vapor

lines equipped withfittings which make vapor-tight

connections that close

automatically when disconnected?

Comply with the following:

Standard

§115.212(b)(3)(A)

§115.212(b)(3)(A)(ii)

Comply with the following:

Standard

§115.212(b)(3)(A)

§115.212(b)(3)(A)(i)

No

§115.212(a)(3)(A)(i)

End

30 TAC Chapter 115, Loading and Unloading of VOC

(27 of 35)

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 28: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

Comply with the following:

Standard

§115.212(b)(4)(D)

Monitoring/Testing

§115.212(b)(4)(D)

Is the gasoline

terminal choosing to

comply with §115.212(b)(4)(D)

instead of complying with

§115.212(b)(4)(C)?

Comply with the following:

Standard

§115.212(b)(4)(C)

Monitoring/Testing

§115.212(b)(4)(C)

31

No

Yes

§115.212(b)(2)

§115.212(b)(4)(D)

37

Is the facility unloading?

No

YesComply with the following:

Standard

§115.212(b)(2), (b)(3)(D)

30 TAC Chapter 115, Loading and Unloading of VOC

(28 of 35)

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 29: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

No

32

§115.212(b)(3)(A)(i)

Comply with the following:

Standard

§115.212(b)(3)(A)

§115.212(b)(3)(A)(ii)

Yes

Are all

liquid and vapor

lines equipped with

fittings which make vapor-tight

connections that close automatically when

disconnected?

Comply with the following:

Standard

§115.212(b)(3)(A)

§115.212(b)(3)(A)(i)

§115.212(b)(2)

33

Is the facility

unloading?

No Comply with the following:

Standard

§115.212(b)(2), (b)(3)(D)

Comply with the following:

Standard§115.212(b)(1)

§115.212(b)

§115.212(b)(3)(B)

[G]§115.212(b)(3)(C), (b)(3)(E)

§115.214(b)(1)(B), (b)(1)(C)Monitoring/Testing

§115.212(b)(3)(B), [G](b)(3)(C)

§115.214(b)(1)(A), (b)(1)(A)(i)-(iii)§115.215, (1), [G](2), (4), (9), (10)

Recordkeeping§115.216, (2), (3)(A), (3)(A)(i)

§115.216(3)(A)(ii), (3)(A)(iii)

§115.216(3)(B)

Yes

30 TAC Chapter 115, Loading and Unloading of VOC

(29 of 35)

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 30: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

Does the

loading and/or

unloading facility

control VOC emissions from

transfer operations with

a vapor balance

system?

No

Comply with the following:

Standard

§115.212(b)(1)(B)

Comply with the following:

Standard

§115.212(b)(1)(C)

§115.212(b)(1)(B)

End

33

Is the loading and

unloading facility equipped with a vapor control system which

maintains a control efficiency

of at least 90%?

No

Comply with the following:Standard

§115.212(b)(1)(A)

§115.212(b)(1)(A)

Yes

Yes

37

30 TAC Chapter 115, Loading and Unloading of VOC

(30 of 35)

December 22, 2016 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 31: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

34

No

Comply with the following:

Standard

§115.213(a)

[G]§115.910

Monitoring/Testing

§115.213(a)

Recordkeeping

§115.213(a)

Is the loading

and unloading facility

electing to comply with

§115.213(c)?

Yes

§115.213(c)

Each VOC loading operation using

this control option shall meet the requirements of subsection

§115.213(b)(1)-(5), except that 1.5 psia shall be substituted for 0.5 psia in

these paragraphs, as per

§115.213(c)(A).

Comply with the following:

Standard[G]§115.213(c)

§115.212(b)(3)(B), [G](b)(3)(C), (b)(3)(E)

§115.213(b)(1), (b)(4)

§115.214(b)(1)(B), (b)(1)(D)

§115.214(b)(1)(D)(ii)

Monitoring/Testing

§115.212(b)(3)(B), [G](b)(3)(C)

§115.213(b)(1)

§115.214(b)(1)(A), (b)(1)(A)(i)

§115.215, (1), [G](2), (4), (9), (10)

Recordkeeping

§115.213(b)(1)

§115.216, (2), (3)(A), (3)(A)(i)

§115.216(3)(A)(ii), (3)(A)(iii), (3)(B)

Reporting

§115.213(b)(1)-(4)

35

End

30 TAC Chapter 115, Loading and Unloading of VOC

(31 of 35)

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 32: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

36

Is the loading

and unloading facility loading VOC with a true vapor

pressure greater than or

equal to 11 psia?

§115.213(b)(5)

Comply with the following:Standard

§115.214(b)(1)(C)

Monitoring/Testing§115.214(b)(1)(A)(ii)

§115.214(b)(1)(A)(iii)

No

End

Is a flare or vapor

combustor considered to be a flare

used as part of the alternate control

requirements?

§115.215(3)

No

Comply with the following:

Standard

§60.18

Monitoring/Testing

[G]§115.215(3)

Yes

35

§115.212(b)(2)

Is the facility

unloading?

No

Comply with the following:Standard

§115.212(b)(2), (b)(3)(D)Yes

Yes

30 TAC Chapter 115, Loading and Unloading of VOC

(32 of 35)

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 33: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

Yes

Comply with the following:

Standard

§115.213(b)(5), (b)(5)(A)

36

§115.213(b)(5)(A)

Does

the loading

and unloading facility

control VOC emissions from transfer

operations by using a

pressurized loading

system?

Comply with the following:

Standard

§115.213(b)(5), (b)(5)(B)

No

§115.213(b)(5)(B)

Comply with the following:

Standard

§115.213(b)(5), (b)(5)(C)

Does the

loading and/or

unloading facility control VOC

emissions from transfer operations with a

vapor control system with a

control efficiency of

at least 90%?

37

EndNo

§115.212(b)(3)(A)(i)

Comply with the following:

Standard

§115.212(b)(3)(A)

§115.212(b)(3)(A)(ii)

Are all

liquid and vapor

lines equipped withfittings which make vapor-tight

connections that close

automatically when

disconnected?

Comply with the following:

Standard

§115.212(b)(3)(A)§115.212(b)(3)(A)(i)

Yes

NoYes

30 TAC Chapter 115, Loading and Unloading of VOC

(33 of 35)

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 34: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

37

Is the vapor

control system equipped

with a direct flame

incinerator?

Is the vapor

control system

equipped with a chiller

or catalytic

incinerator?

Is the vapor

control system

equipped with a carbon

adsorption

system?

No

Yes

Comply with the following:

Monitoring/Testing§115.216(1)

§115.216(1)(A), (1)(A)(i)Recordkeeping

§115.216(1)

§115.216(1)(A), (1)(A)(i)

Comply with the following:

Monitoring/Testing

§115.216(1)

§115.216(1)(A), (1)(A)(ii)

Recordkeeping

§115.216(1)

§115.216(1)(A), (1)(A)(ii)

Comply with the following:

Monitoring/Testing

§115.216(1)

§115.216(1)(A), (1)(A)(iii)

Recordkeeping

§115.216(1)

§115.216(1)(A), (1)(A)(iii)

No

§115.216(1)(A)(i)

Yes

§115.216(1)(A)(ii)

§115.216(1)(A)(iii)

End

No

38

Yes

30 TAC Chapter 115, Loading and Unloading of VOC

(34 of 35)

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***

Page 35: BBellooww iiss a flfloowwchharrt t ddescrriibbiinngg 30 TTAACC CChhapp.. 115,, SuSubbchhapp.. CC,, DDiivviisiioonn 1… · 2019/3/25  · 115.211(1) 115.219(d) End 30 TAC Chapter

38

Is the vapor control system

equipped with a vapor combustor that is not considered

a flare?

Yes

Comply with the following:

Monitoring/Testing§115.216(1)

§115.216(1)(A), (1)(A)(iv)Recordkeeping

§115.216(1)

§115.216(1)(A), (1)(A)(iv)

No

Comply with the following:

Standard

§60.18

Monitoring/Testing

[G]§115.215(3)

§115.216(1)

§115.216(1)(B)Recordkeeping

§115.216(1)

§115.216(1)(B)

Is the vapor

control system equipped

with a flare, or a vapor combustor

that is considered

a flare?

§115.215(3)

Yes

§115.216(1)(B)

Comply with the following:

Recordkeeping

§115.216(1)

§115.216(1)(C)

End

No

30 TAC Chapter 115, Loading and Unloading of VOC

(35 of 35)

Last modified: March 25, 2019 From 30 TAC Chapter 115, Effective 6/25/2015These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change. ***