Bay Area Bike Share: Project Schedule - SFMTA Share Open... · Bay Area Bike Share: Project...

10
Bay Area Bike Share: Project Schedule Date Event May 17, 2013 Name Announcement May 30, 2013 San Francisco Open House June 14, 2013 SFMTA Public Hearing: Station Approvals July 2013 Website Live July 2013 Membership Opens July-August 2013 Stations hit the streets August 2013 Bay Area Bike Share Launch! Spring 2014 Full Pilot Expansion (150 more bikes, 50 total stations)

Transcript of Bay Area Bike Share: Project Schedule - SFMTA Share Open... · Bay Area Bike Share: Project...

Page 1: Bay Area Bike Share: Project Schedule - SFMTA Share Open... · Bay Area Bike Share: Project Schedule Date Event May 17, 2013 Name Announcement May 30, 2013 San Francisco Open House

Bay Area Bike Share: Project Schedule

Date Event

May 17, 2013 Name Announcement

May 30, 2013 San Francisco Open House

June 14, 2013 SFMTA Public Hearing: Station Approvals

July 2013 Website Live

July 2013 Membership Opens

July-August 2013 Stations hit the streets

August 2013 Bay Area Bike Share Launch!

Spring 2014 Full Pilot Expansion (150 more bikes, 50 total stations)

Page 2: Bay Area Bike Share: Project Schedule - SFMTA Share Open... · Bay Area Bike Share: Project Schedule Date Event May 17, 2013 Name Announcement May 30, 2013 San Francisco Open House

Bicycle Sharing: A Regional Pilot100 Stations, 1000 Bikes

San Francisco

San Jose

Palo Alto

Redwood City

Mountain View

0 5 10MilesSan Francisco Bay Area

Regional Bicycle Sharing Pilot Participating City

CalTrain

Partner Agencies:

Bay Area Air Quality Management District (Lead)

San Francisco Municipal Transportation Agency

Valley Transportation Authority

SamTrans

City of Redwood City

County of San Mateo

Major Funding:Bay Area Climate Initiative Program (Metropolitan Transportation Commission)

Transportation Fund for Clean Air (BAAQMD)

Proposition K Local Transportation Sales Tax Funds (SFCTA)

Launching in August with:

70 Stations

700 Bikes

One membership

Page 3: Bay Area Bike Share: Project Schedule - SFMTA Share Open... · Bay Area Bike Share: Project Schedule Date Event May 17, 2013 Name Announcement May 30, 2013 San Francisco Open House

Bike Share Stats

Safety matters:1

bike during the same time period)2

Bike Share replaces trips by personal auto43% of Denver B-Cycle users surveyed said they replaced car trips with bike rides3 and 50% of Minneapolis NiceRide members reported choosing public transit or bike sharing over driving4

A quarter (26%) of Capital Bike Share survey respondents survey reduced their driving miles; 11% reduced driving by more than 1,000 miles5

year, or by 198 miles per member6

Bike Share encourages bicycling and active transportation71% of NiceRide Minneapolis members say they bike more since the system was introduced, and 63% say they get more exercise because of access to bike sharing7

8

Bicycling increased 70% in Paris since Velib’ was introduced in July 20079

10

Bike Share is the futureThere are currently 495 bike share programs operating worldwide that deploy over 500,000 total bikes!11

The world’s largest bike share program in Hangzhou, China, has approximately 60,000 bikes!12

Bike Share is good for businessMore than eight in ten Capital Bike Share survey respondents said they are either much more likely (37%) or somewhat more likely (48%) to patronize an establishment that is accessible by Capital Bikeshare13

Minneapolis NiceRide members spent an estimated $3,013,387 during their trips in 201114

Washington, DC CaBi members save around $819 in transportation costs annually15

89% of Velib’ users said it allowed them to move around Paris easily16

Sources:

Page 4: Bay Area Bike Share: Project Schedule - SFMTA Share Open... · Bay Area Bike Share: Project Schedule Date Event May 17, 2013 Name Announcement May 30, 2013 San Francisco Open House

Check out the Bike!

ShifterShimano Nexus 7-speed Internal Gear Hub

TiresWide for a smooth ride, puncture resistant and

Weight: 42.5 lbsHeavier than a normal bike because the frame and components are engineered for heavy urban usage

SaddleComfortable commuter design, seat height adjusts for people 4’10” to 6’5”

FendersFends off the rain and grime and keeps billowing clothing from catching in the spokes

HandlebarOne piece, integrated design with dual brake levers, bell, and 7-speed grip shift

Stem Safety Sticker

Front RackFits more than a basket with a versatile design that secures all of your goods with a clever bungee cord

Chain protector Protects the chain and your clothing

Dynamo HubPowers the front and rear lights and holds a charge for 2 minutes after you stop

Drum BrakesAre unaffected by rain or road grit

FrameDurable aluminum step-over design

Lights 1 white LED light in the front and 2 red LED lights in the rear turn on automatically when you pedal

Exact colors to be determined

Yield to pedestrians

Obey traffic signals & signs

Ride with traffic

Walk bikes on sidewalk

Page 5: Bay Area Bike Share: Project Schedule - SFMTA Share Open... · Bay Area Bike Share: Project Schedule Date Event May 17, 2013 Name Announcement May 30, 2013 San Francisco Open House

Station Elements

Battery powered

Solar charged

Secured by own weight

No excavation required

Modular

Map/sponsorship panel

Typical station site plan:

Proposed station renderings:

Solar Mast

Map Panel

Bike Dock

Page 6: Bay Area Bike Share: Project Schedule - SFMTA Share Open... · Bay Area Bike Share: Project Schedule Date Event May 17, 2013 Name Announcement May 30, 2013 San Francisco Open House

How it Works: Installation and Maintenance

system...that is rigorously maintained

...and continuously serviced

Stations take up to a few hours to install and can be unassembled just as quickly

Bike sharing station are monitored to ensure just the right

Users can request bicycle maintenance

Page 7: Bay Area Bike Share: Project Schedule - SFMTA Share Open... · Bay Area Bike Share: Project Schedule Date Event May 17, 2013 Name Announcement May 30, 2013 San Francisco Open House

How it Works: Membership and Costs

Membership Pricing (includes unlimited 0–30 minute trips)24 Hours: $7 - $10*

3 Days: $20 - $25*

1 Year (lump sum payment): $75 - $90*

1 Year (paid in installments): $90 - $100*

Additional fees apply to trips over 30 minutes0–30 minutes of each ride: INCLUDED

31–60 minutes of each ride: $2 - $6*

Each additional 30 minutes: $5 - 10*

Maximum daily charge: TBD

*Corporate membership information coming soon!

S1. JOIN 2. TAKE

3. RIDE 4. RETURN

Page 8: Bay Area Bike Share: Project Schedule - SFMTA Share Open... · Bay Area Bike Share: Project Schedule Date Event May 17, 2013 Name Announcement May 30, 2013 San Francisco Open House

San Francisco Bike Share Suitability Analysis

Suitability

Low

High

0 1 20.5 Miles

FULTON STFELL ST

GR

EA

T H

WY

GEARY BLVD

19T

H A

VE

SAN

BRUN

O AV

E

MONTEREY BLVD

OAKDALE AVE

LOMBARD ST

SAN

JOSE

AV

E

TH

IRD

ST

CESAR CHAVEZ ST

PORTOLA DR

MO

NT

GO

ME

RY ST

SLOAT BLVD

MARKET ST

POW

ELL ST

GEARY BLVD

BAY ST

NORIEGA ST

JUN

IPE

RO

SE

RR

A B

LVD

DIV

ISAD

ER

O ST

GENEVA AVE

MIS

SIO

N ST

MISSIO

N ST

SUN

SET

BLV

D

THE EM

BARCADERO

DO

LOR

ES

ST

VAN

NE

SS AVE

BROADWAY

Analysis of employment, business, transportation, population and other demographic data contributed to the following map:

Page 9: Bay Area Bike Share: Project Schedule - SFMTA Share Open... · Bay Area Bike Share: Project Schedule Date Event May 17, 2013 Name Announcement May 30, 2013 San Francisco Open House

Bike Share Station Placement: Opportunities and Constraints

Opportunities:

into the width of a typical parking lane

With careful planning and a focus on urban design, bike share stations can activate open spaces in the city’s downtown core

The bike lanes, sharrows, and cycletracks that cross the downtown core provide access to bike share station locations

Constraints

Bike Corrals and Parklets also offer alternative uses for the parking lane

UN Plaza in downton San Francisco is an active open space with excellent access to transit

provides easy access to multiple bike share stations

Page 10: Bay Area Bike Share: Project Schedule - SFMTA Share Open... · Bay Area Bike Share: Project Schedule Date Event May 17, 2013 Name Announcement May 30, 2013 San Francisco Open House

Division St

Oak St

03rd St

King

St

Mission St

Market St

Fell St

Columbus Ave

Miss

ion

St

Harrison St

07th St

Gra

nt Ave

Hyde St

Sacramento St

Leavenworth St

Clay St

Pacific Ave

Jackson St

Vallejo St

Jones St

Mason St

Bryant S

t

Bush St

Union St

Brannan St

Mcallister St

Pine St

Lombard St

08th St

Green St

Folso

m St

Ad

a Ct

Montgom

ery St

Post St

05th St

Washington St

Reno Pl

Kramer Pl

Harlan Pl

Filbert St

Francisco St

Howard St

Chestnut St

California St

Hallam St

Cyrus Pl

02nd St

Farg

o Pl

Berwick Pl

Larkin St

Julia St

Greenwich St

Stockton StRuss St

01st St

New Montgom

ery St

Sutter St

Annie St

Bay St

Broadway

Taylor St

Townse

nd St

Powell St

Ellis St

Ofarrell St

Turk St

Franklin St

Chesley St

13th St

Hayes St

Cosmo Pl

Marcy Pl

Grove St

Colin Pl

Clara St

Market St

Homer St

Boyd

St

Eaton Pl

Beach St

Langton St

Doric A

ly

Columbus Ave

Emma St

Gough St

Tehama St

Delancey St

11th St

Drum

m St

Gibb St

Brady St

Battery St

09th St

Pratt Pl

Miles St

Pfeiffer St

Vinton Ct

Leidesdorff St

Ad

ele Ct

James Pl

Kimb

all Pl

Leroy Pl

Jason Ct

Gold St

Wetm

ore St

Kohler Pl

Miller Pl

Fremont St

Sout

h Park

Wa

ll Pl

Polk St

Ter ryA

Fran co isBlvd

Front St

Kearny StN

apier Ln

Card Aly

Julius St

Anson Pl

Fella Pl

Derby St

Stark St

Vine Ter

Alta St

Fallon Pl

Pollard Pl

Marion Pl

New

ell St

Truett St

Moore Pl Sharp

Pl

Ewer Pl

Kent St

Black Pl Webb Pl

Quincy St

Bartol St

Channel St

Helen St

Sabin Pl

06th St

10th St

China Basin St

04th St

Mary St

Steuart St

Zoe StWinter Pl

12th St

Eddy St

Essex St

Burns P

l

Sherman St

Cyril M

agn inSt

Hangah St

Butte Pl

Commercial St

White St

Hickory St

Golden Gate Ave

Geary St

Wa

yne Pl

Kisslin

gSt

Da

rrell PlHalleck St

Edith St

Salm

on St

Florence St

Harriet St

Lily St

Cord

elia St

Minna St

Troy Aly

Welsh St

Antonio St

Kate St

Lucerne St

Gilbert St

Decatur St

Gordon St

Havens St

Rodgers St

Reed St

Mclea Ct

Jefferson St

Priest St

Joice St

Natoma St

Da

vis St

Wa

verly Pl

Jasper Pl

Fielding St

Lick Pl

Berry

St

Rizal S

t

Morris St

North Point St

Jessie

St

Isis S

t

Mission Bay South BlvdMission Bay North Blvd

Shipley S

t

Clementina St

Juniper St

Fern St

Hemlock St

Cedar St

Taber P

lElm St

Maiden Ln

Willow St

Olive St

Beale St Spear St

Bernard St

Water St

Fulton St

Mission Rock St

Macondray Ln

John St

Myrtle St

Glover St

Merlin St

Freelon St

Steve

nson St

Perry St

Main St

Grace St

Ritch St

Hawthorne St

Dore St

Rausch St

Norfolk St

Moss St

Stanford St

Stillm

an St

Bluxo

me St

I-80 E Off R

amp

I-80 W

OnRa

mp

I-80 W

Off R

amp

I-280 SouthboundI-280 N

orthbound

Sansom

e St

Long Brid

ge StOtis

St

I-80 W

estboun

d

Guy

Pl

I-80

E On Ra

mp

Trans

bayLo

op

The Embarcadero

Channel

Berry

St

2

15

15

23

17

15

19

19

19

23

27

19

23

19

19

11

15

15

19

15

19

25

19

15

19

23

15

15

19

19

15

19

23

´0 0.250.125 Miles

Proposed Bike Share Station

BART StationCaltrain StationBike Share Pilot Service Area

SFMTA Bicycle Route NetworkBike PathBike LaneBike Route

Bike Share Service Area

3119

19

*Stations are labeled by number of bike docks

*