SAPP Investment Conference: Windhoek – September 2005 M. J. Tumbare,Zambezi River Authority

description

Batoka Gorge Hydroelectric Project SAPP Investment Conference

Transcript of Batoka Gorge Hydroelectric Project

Page 1: Batoka Gorge Hydroelectric Project

SAPP Investment Conference: Windhoek – September 2005

M. J. Tumbare,Zambezi River Authority

Page 2: Batoka Gorge Hydroelectric Project

�Corporate Structure of ZRA�Major Functions of ZRA�Highlights of ZRA Activities and

Achievements.�Project Opportunities on Common

Zambezi River.�Batoka Hydro Electric Project.�Conclusion.

Page 3: Batoka Gorge Hydroelectric Project

� Council of Ministers of ZRA (the Council)� Board of Directors (the Board)� Chief Executive� Heads of Departments.

� Director – Projects and Dam Safety.� Director – Environment and Water

Resources Management.� Director – Finance/Corporate Secretary.

Page 4: Batoka Gorge Hydroelectric Project

.

Page 5: Batoka Gorge Hydroelectric Project

�Developed a Water Purchase Agreement with ZESA and ZESCO for hydropower generation .

�Developed a good track record for the maintenance & operation of the third largest person- made reservoir in the world.

�Experience in managing relationships between two governments in developing & sharing of water resources.

Page 6: Batoka Gorge Hydroelectric Project

�Carried out pre-feasibility studies for potential dam sites on the common Zambezi River.

�Developed a priority sequencing of the development of hydro-electric projects on the common Zambezi.

�Completed feasibility studies for the Batoka Hydro-electric project.

Page 7: Batoka Gorge Hydroelectric Project
Page 8: Batoka Gorge Hydroelectric Project

295Regulation Dam Katombora

2 0401 085Mupata Gorge

440390Victoria Falls South

1 4501 200Devils Gorge

2 5001 600Batoka Gorge

Estimated Project Costs. (Million US $)

Installed Capacity (MW)

SCHEME

Page 9: Batoka Gorge Hydroelectric Project

SCHEME RATIO: (O&M)/(INST.CAP) (US$/MW)

AVERAGE SPECIFIC GENERATION COSTS (USc/kWh)

Batoka Gorge 5 700 1.78

Devil’s Gorge 7 000 1.93

Victoria Falls South

6 400 2.10

Mupata Gorge 8 600 2.02

Page 10: Batoka Gorge Hydroelectric Project

� In 1992, ZRA Commissioned the Batoka Joint Venture Consultants (BJVC) to carry out a feasibility study for the Batoka HES.

� BJVC was a consortium comprising, Knight Piesold of UK, Lahmeyer International and Electrowatt of Germany.

� Their findings are that a Roller Compacted Concrete Gravity Arch dam with two underground power stations of 1 600 MW total installed capacity, is the optimal project sizing for the site.

Page 11: Batoka Gorge Hydroelectric Project

�Batoka Dam principal data:�Catchment Area – 508 000 km2

�Reservoir Surface Area – 25.6 km2

�Capacity – 1.680 X 109 m3

�Dam Type – RCC Gravity Arch Dam.�Height – 181 m.�Spillway Type – Crest Overflow with 12

Radial Gates.

Page 12: Batoka Gorge Hydroelectric Project

� Power Stations:� Two Underground Power Caverns (one North

and one South)� Installed Capacity – 1600 MW (2X 800MW)� Generation Efficiency – 86%.

� Other Infrastructure:� Transmission Lines � Access Roads and Housing.� Social Amenities.

� Total Project Costs – US$ 2 500 Million.

Page 13: Batoka Gorge Hydroelectric Project

� Other key activities carried out.� A comprehensive EIA and SIA carried out

(1993 &1998).� Project presented to financiers such as ADB

who have expressed an interest to finance the next phase of final engineering designs with Tender Documents.

� With the ZESA and ZESCO Power Station extensions at Kariba, the Batoka Project becomes more critical for the conjunctive operation of the two dams which increases firm capacity at Kariba.

Page 14: Batoka Gorge Hydroelectric Project

�The Project Development plan has been updated (2005).The Batoka project cycle is seven (7) years.

�ZRA has consulted with its key stakeholders including ZESA, ZESCO & SAPP.

�ZRA is developing a project strategy and SPV which ensures that this project can be financed.

Page 15: Batoka Gorge Hydroelectric Project

Batoka Project Partners and Structure

ZRA UtilitiesZESA/ZESCO

Investors

Batoka HydroElectric Company

Page 16: Batoka Gorge Hydroelectric Project

�The Batoka Hydro-Electric Company will be the SPV for the Project.

�ZRA has set up a Project Development Executive Team to manage the Project’s facilitation prior to the setting up of the SPV.

�Other Investors will be invited to take part in the project.

Page 17: Batoka Gorge Hydroelectric Project

� The Batoka project is one of the most attractive projects in the region.

� It is ideally suited for providing peaking power.

� It is strategically located close to the SAPP markets.

� A lot of ground work has already been done.� The commencement time for Batoka Project

is short.

Page 18: Batoka Gorge Hydroelectric Project

� Conjunctive operation of Batoka with existing system adds US$160.3 million annually in earnings in excess of that realised by non-conjunctive operation.

� CO2 emission savings amounting to 9 milliontonnes/year can be credited to the BatokaProject if constructed.

� Batoka Project has an EIRR of 10.2% (10-12%),a B/C ratio of 1.21 (>1.0) and an FIRR of 17%.

Page 19: Batoka Gorge Hydroelectric Project

� ZRA has consulted widely with its key stakeholders in Zimbabwe and Zambia.

� ZRA also has several other attractive projects to offer on the Zambezi.

� The Batoka project cycle is seven (7) years.� ZRA is there as a partner to make the

Zambezi water resources a key contributor to the regional hydropower needs.