Baseline Schedule

4
Engineering & Construction - Malaysia TL OFFSHORE SDN BHD Baseline Schedule Chronology

description

Baseline

Transcript of Baseline Schedule

Offshore Construction and Subsea Services Subsea Services

Engineering & Construction - MalaysiaTL OFFSHORE SDN BHD Baseline Schedule Chronology Confidential / DraftAGENDA2SSB Commercial Meeting #08INTRODUCTIONDELAY COMPENSATION SCHEME (DCS)HRF START DATEMOBILIZATION DATEFUEL COMPENSATIONCOST PLUS ISSUE (AUT / SURVEY / RIGGING)OTHERSConfidential / DraftBASELINE SCHEDULE CHRONOLOGY3SSB Commercial Meeting #08No.DateReferenceRemarks1.12th Feb 2014CONTRACTORs Letter L0015Submission of Baseline Schedule Rev. 01CONTRACTOR requested for start date on 15th March 2014Proposed layrate for 20 F23R-A/F14DR-A is 80 joints per day2.27th Feb 2014CONTRACTORs Letter L0029Overall duration maintains as per previous submission with re-sequencing of activityProposed layrate for 20 F23R-A/F14DR-A is maintained 80 joints per day3.5th March 2014COMPANYs Letter F015COMPANY take note on the for work to commence on 15th March 2014COMPANY stated that based on CONTRACT installation norm computation, the duration for 20 F23R-A/F14DR-A is 38.95 days4.11th March 2014COMPANYs Letter F017COMPANY advised CONTRACTOR to use 38.95 days as a Base Duration for installation of 20 F23R-A/F14DR-A 5.18th March 2014CONTRACTORs Letter L0057CONTRACTOR submitted technical clarification and justification for the proposed layrate of 80 joints per day6.20th March 2014COMPANYs Letter F027COMPANY agreed on the disruption due to changes of pipeline wall thickness, pipeline outer diameter changes, installation of buckle triggers and zero radius layConfidential / DraftBASELINE SCHEDULE CHRONOLOGY4SSB Commercial Meeting #08No.DateReferenceRemarks7.6th May 2014CONTRACTORs Letter L0109CONTRACTOR submitted schedule rev. 03C which was revised due to additional constraint of F23 shutdown windowProposed layrate for 20 F23R-A/F14DR-A is maintained 80 joints per day8.15th May 2014COMPANYs Letter F050F23 shutdown is not additional constraint as informed during kick-off meeting, schedule discussion and weekly progress meeting. 9.27th May 2014COMPANYs Letter F054COMPANY agreed that the duration for installation of 20 F23R-A/F14DR-A pipeline to be increase from 38.95 days to 47 days.

Confidential / Draft