Bartholomew Culinary Water Tank
description
Transcript of Bartholomew Culinary Water Tank
BARTHOLOMEW CULINARY WATER
TANK
Backbone EngineeringClark Larsen, Kendrick Shepherd, and Brett Thomas
Background Information Bartholomew
Culinary Water Tank is located up Hobble Creek Canyon.
The current tank is a 1.4 million gallon steel tank.
Problem Statement
The current water tank was deemed structurally unsound.
A new tank needs to be designed.
Design Requirements
Determine optimal sizing for the tank.Based on the water users needs.
Determine new location of tank near the existing tank.
Design new tank to withstand avalanche and earthquake loads.
Overall Product
Geotechnical Design Not completed due to snow cover Neglect settlement and bearing capacity
Uphill excavation approximately 25 feetDownhill excavation approximately 15 feetPreconsolidation pressure greater than overburden
pressure Neglect heaving due to French
drain Alluvial deposits
Friction angle – 45°Unit weight – 125 pcf
Hydraulic Design Overflow Structure
Must allow more than the max inflow of (15,000 gpm) to flow out.
PipingChecked to ensure adequate head
VentingMust meet venting requirements according
to API 2000.
Structural Design Walls
Used vertical and horizontal prestressing.12 inch thick core wall and 2 inches of
shotcrete covering. Foundation
2 foot thick and 5 foot wide ring foundation.7 inch thick base slab in the middle.Temperature and shrinkage reinforcement.
Structural Design Domed roof
Circumferential and radial reinforcing.Horizontal prestressing around the rim of the
roof. Seismic
Designed according to ACI 350.3-01 and ACI 350.3R-01
Conservative estimates were made when necessary.
Construction/Cost Transition
Disrupt water flow as little as possible.
French drain Difficult construction
because of limited space.
3 – 3.75 million dollars
Conclusions The avalanche load caused excessive
reinforcing and concrete to be used. Possible different site location. Geotechnical analysis should be
completed for more accurate results.