BARRIERS & ISOLATION TM PRIME PLUG… · Can be set on Slickline, E-Line/tractor or coiled tubing...
Transcript of BARRIERS & ISOLATION TM PRIME PLUG… · Can be set on Slickline, E-Line/tractor or coiled tubing...
SPEC SHEET
BARRIERS & ISOLATION
Temporary well barrier during workover & well maintenance operations
Integrity testing of production strings and casing
Zonal isolation; water or gas shut off
High debris environment wells
APPLICATIONS
PrimePlugTM is a V0 qualified retrievable bridge plug with unique design and backup retrieval features that ensure it can be set and retrieved from high debris environment wells. The plug can be run with a Junk Catcher for increased debris management.
ISO 14310/API-11D1 - V0 certified
NACE MR0175, NORSOK M-710
Can be set on Slickline, E-Line/tractor or coiled tubing with standard setting tools
Retrieved with standard GS/DU pulling tools on Slickline, coiled tubing or E-Line tractor/stroker systems
Associated running tool ensure correct setting force and prevents pre-set
Plug and Junk Catcher set in one run
Two separate equalising options; visual indication of equalising when “pull up mode” option selected
Backup equalising and retrieval systems
Low force required tor etrieve plug
FEATURES
Increased operational flexibility for equalising with better control of differential pressures in wellbore
Improved efficiency and assurance in setting and retrieving
High sealing assurance
High reliability, cost effective
BENEFITS
Reference no. SS.BI.002
PRIMEPLUGTM
For further information, please contact:
www.altusintervention.com/expert
Differential pressure rating: up to 10,150 psi / 700 barTemperature rating: up to 3560F / 1800CDesign validation grade: ISO 14310/API-11D1 V3-V0H2S: up to 2% (higher levels available upon request)
* 4.5 PrimePlugTM HPHT ** 3.5”PrimePlugTM does not have alternative equalizing and retrieving option