An application filed by Petitioner/ OREDA under Sec. 2 of the Electricity Act, 2003
for the non-compliance of OERC (Renewable and Co-
and its Compliance) Regulations, 2010 framed under
181 of the Electricity Act, 2003.
neration Purchase Obligation
61, 66, 86 (1) (e) and
AND
The Chief Executive, OREDA, 5-59, Mancheswar I ustrial Estate, Bhubaneswar-'-751010.
Petitioner
1. The Chairman-cum-Managing Director, GRIDCO, Ja h, Bhubaneswar-751022
2. Department of Energy, Govt. of Odisha
3. Office of the Chief Engineer (Project)- Cum-Chief cal Inspector (generation),
PO\.'JE'rHouse Square, Unit V, Odisha, Bhubaneswar-7 001
4. M::lnaging Director, Green Energy Development Cor n of Odisha Limited, OHPC
Corporate Office, OSPH & W Corporate Building, Jan th, Bhoinagar, Bhubaneswar-
751022
The Senior General Manager (PS), SLDC, Mancheswar ailway Colony, Bhubaneswar.
The CEO, CESlJ,2I1d Floor,mCOTowers, Bhubaneswar 751022
The Managing Director, WESCO, At/P.O. Burla, Dist. S mbalpur-768017
The Managing Director, SOUTHCO At/P.O. Courtpeta,
-:-he Managing Director, NESCO,At/P.O. Januganj, D'
/\artiSteel Ltd, Plot No. 1111B/41, Sector l1,C.D.A. B
N~C.Cement, Bargarh, Cement Nagar, At/Po Bardol Di
':H;.ti()r~ Ispat and Power Pvt. Ltd., HIG-32, BDA Col , Gangadhar Meher Marg,
mpur-760004
13.J,,:ydev Vihar, Bhubaneswar-13
I~dhunik Metaliks Ltd, 3rd floor, Annex. buildBhubaneswa~751022
IPICOL House, Janpath,
1
'~....~,.;.....:... .: .
I
31.
, 32.
33.34.
3~.
36.
37.
38.
39.
40.
41.
42.
•
14. Aryan Ispat& Power Pvt.Ltd., DGM (E & I) ViI/-B aloi, Tehsil- Rengali, Dist-
Sambalpur-768201
15. Bhaskar Ste~I&'rerro Alloy ltd. KK-44, Civil Twonship, url<ela, Odisha-769004
16. Bhusan Powel¢~ Steel, N-3/28, Navapalll, IRC Village, B ubaneswar-751015
17. BhusanSteel &Strips ltd. Post Kuspanga, Dist- Dhenka 1-759121
18. Silt Sewa Ballarpur Industries Ltd, 64 Forest Park, Bh neswar,Odisha-751009"
19. M!S Bindal Sponge Ltd, Sunakhani, Talcher-759100
20. Birla Tyres, 112A, Surya Nagar, Bhubaneswar~75l003
21. Deepak Steel &, Power ltd, Ispat Bhawan, Barbil, Keojha 758035
22. Yazdani Steel & Power ltd. (Formerly Dinabandhu el & Power ltd.) Yazdani
Steel & Power l td Nagar, Po- Arunodaya Market, Cutta 2
23. Easterrn Steel8~ Power Ltd. Lahandabud, Jharsuguda, Pi
24. FACOR, D.P. Nagar, P.O. Randia-756135, Dist. Bhadrak,
25. IHCO, Musadia, Paradeep, Jagatsinghpur-754142
27.
28.
!r-llFA.Ltd, Bomikhal, D.?CI "?:"Irh, Bhuo<1nesW;'lr.-1()
J. K. Paper, Plot No.1, Near Swosti Plaza, N 1, Nayapalli,
j.j,~dpl Stainless Ltd, Kalinga Nagar Industrial Campi
ubaneswar-751013
Front of MESCO, Post-
Danagari, Duburi-755026 Dist- Jajpur, Odisha
29. Jlndal.Steel f~ Power, Village- Nisha, SH-63, Chhendi
759130
30. IDCOl Kalinga Iron Works Ltd. Regd. Office & Works, P.O. Matkambeda-758036,
Road, Angul, Odisha-
Barbil, Keonjhar, Odisha
Maheswari lspat Ltd., 85, Surya Nagar, Bhubaneswar, 75
Maithan tspat Ltd. G.M. Co-ordination, HIG-17,B
Bhubaneswa~751013
MSP Metaliks {P) Ltd. Marakuta, Jharsuguda, Odisha-768
National Alluminium Company (Angul), NAlCO
Bhubaneswa~75l061
National Alluminium Company (Damanjodi), NAlCO Bhawan, Pll, Nayapalli,Bhubaneswar~751061
Jayadev Vihar,
wan, PIl, Nayapalli,
Nava Bharat Ventures Ltd.Kharagprasad Village, Dhenka
Narbheram Power & Steel Pvt. Ltd. (SCAW) 79, Surya N
Neelachallspat Nigam Ltd (NINl), Kalinga Nagar IndustriaBhubaneswar- 751003
Complex, Duburi-755026,Jajpur road
oel Cement, Rajgangpur (Odisha) Cement Works, Raj 770017 Odisha
Orissa Sponge Iron Ltd., Cattarjee International Centre, Jawahar Lal Nehru Road,Calcutta-7000?1
Orissa sponge Iron and Steel, Vill- lamloi, P:O. Garvene,
Paradeep Phosphate ltd, Bayan Bhawan, PT Jawaharlal N751001
ngpur, Odisha-7700l7
u Marg, Bhubaneswar-
2
I
43.
44.
45.- 46.
47.
48.49.
50.51.
52.
53.
54.
55.
56.
House Cuttack Road,
I
pattnaik Steels & Alloys Ltd., A/22, First Floor, Fa, '
8hubaneswa~751006Rana Sponge Ltd.HIG-31, Gangadharmeher marg, Bhuba swarRathi Steel 8.t Power Ltd, B-I07, Madhav Nil Apartment, Lewis Road,
Bhubaneswai:Ji4, - -Rourkela SteelPlant, Rourkela-769011, Odisha
Scan Steel ltd. Main Road, Rajgangpur, Sundargarh, -770017
Shri Mahavir i;erro Alloys Pvt. Ltd, Main Road Rajgangp ,Odisha-770031
5hY3i1~ Metalicl<s & Energy Ltd. (Formerly Shyam DRI Power Ltd.), A-17/10, Surya
Nagar, Bhubaneswar-751003SivlC Power Generation Pvt Ltd, 47, Madhusudan Nagar Bhubaneswar-751001
Sri Ganesh Metalicks 'Ltd. A-I, Znd Floor, Cammer I Complex, Civil TownshiP, '
Rourkela, Odi,sha-769004da Housing Board Colony,Tata Sponge lion Ltd. Gavatree Nivas, HfG, C-124, Bara
Bhuba n-eswar-75100:3Vedanta Allumtnurn Ltd., (Bhukhamunda, Jharsuguda) st Floor, City Mart Complex,
BaramundaBhubaneswar -751003
Vedanta Alluminum Ltd, (Langigarh, Kalahandi)
Baramunda ,ihubaneswar, -751003
Viraj steel & Energy, Gurupali, Sambalpur, Odisha
Visa Steel Ltd. Nagar Industrial Complex, At/Post, Jak
Floor, City, Mart Complex,
Respondents
Name & Address of.the Petitioner:
The Chief .Executive, OREDA, 5-59, Mancheswar Industrial Estate, Bhubaneswar-751010
I
I
1. 'Nature of Complaint:
Non-compliance to OERC (Renewable and Co-generat n Purchase Obligation and its
Compliance) Rf'gulations, 2010
2. Documents on which the petitioner is relying upon:
i. OERC (Renewable and Co-generation Purchase Obligation and its Compliance)
Regulations, 2010 framed under Section 61, 86 (1) (e) and 181 of the
Electricity Act, 2003. (Annexure I)
, ! . ' ii, OPTCL;_etter No 747(3) dated 28.92011 co
Odish~~~.(Annexure II)unicating the list of CGPs in
3
iii. Letter No 3938 dated 19.12.20111 of EObligated Entities in the State. (Annexure III)
I communicating the list of
I
lv, Letters of Chief Engineer (project)- cum- Chief Electrical Inspector•• (Generation) enlisted below communicating the etails ~f self-cons·umption by
obligated entities
a) E. O. P.- 2151 1111757 (WE) IDated.03.09.b) E.D. P.- 215/11/ 1591 -,WE)/ Dated 27.08.
2 (Annexure IV)3 (Annexure V) &
, c) E. D. P.- 215/ 11/ 1495 (WE)I Dated 28.07.2 4 (Annexure VI)
3. Commission's previous order/direction to OREDA,if a ,in the matter:
i. Letter No. 1046 dated 13.06.2011 (Annexu VII)ii. tetterNo. 4593 dated 24.12.2012 (Ann VIII)iii. Letter No. 1083 Dated 01.08.2014 (Annex IX)
4. Communlcation from OREDA to the Hon'ble Commission Regarding RPOCompliance
.,i. Letter No.1 dated 01.01.2013 (Annexureii. Letter No. 2875 dated 05.09.2013 (AnnexureHi. letter No. 1232 dated 21.08.2014 (Annex XII)
5. Communication of OREDAto All obligated entities
I i. Letter No. 743 dated 29.02.2012 (Anneii. Letter No. 2922 dated 22.08.2012Hi. Letter No. 1126 dated 26.03.2013iv. letter No. 300 dated 18.03.2014 (Annex
XIII)re XIV)
6. Is it a continuation of violation/ non-compliance?
Yes
7. A brief background
I
Section 86 of the Electricity Act 2003 which defi es the various functions of the
State Cornmlsslon at 86 1 (e) mandates the sta commissions to promote Co-
generation and generation of electricity from bl fnewa e sources 0 energy by
pr?viding suitable measures for connectivity with id and sale of electricity to any
4
person and alsospeclfv, for purchase of electricity from . ch sources a percentage of
l '
draft. After conducting a public hearing in case No 5 of 2010 OERe finalized the
Renewable and Cogeneration Purchase Obligation an its compliance Regulation -
2010 in its order dated 30.9.2010. The same was blished in the extraordinary
...a draft Renewable and
gulation-2010 in line with
Forum of Regulators (FOR)
ng a pre-publication of the
the totalconsumption of in the area of the distribution ee.
,8. Actions by the ,OERe:
••In compliance to the above mandate the OERCprep
Cogeneration Purchase Obligation and its Compliance
the draft Renewable PurchaseObligation circulated by t
and invited views of all stakeholders on the same by
I
Salient features of the Regulation:
i) The Regulation defined Obligated Entities as Distribution Licensees (or any
• entity procuring power on their behalf) and any other person consuming
electricity generated from conventional ve generating plant having
capacity of 5 MW and above for his 0 use and lor procure from
conventional generation through open access
ii} The regulation also specified the quantum of
"Every Obligated Entity shall purchase not Ie than 5% of its total annual
consumption of energy from co-generation d renewable energy sources
from 2011-12 on words with 0.5 percentage every year thereafter, till
2015-16 or as reviewed by the Commission e
Hi) The regulation further specified the qua equivalent
quantity of Renewable Energy Certificates (R ) to be purchased from solar
Iand non-solar sources and also the
consumed/purchased from cogeneration s
which has been tabulated below:
antum of· power to be
each year till 2015-16
5
· .· .
Quantum of Obligation as Specified by OERe
Minimum .quantum of purchase in percentage ( in terms f energy consumption in state inKWH)
Renewable
•
- Solar Non Solar
2010-11 1.00'
2011-1.2 0.10 1.20
2012 -13 0.15 1.40
2013 -14 O.?O 1.60
2014 -15 0.25 1.80
2015-16 O.3() 2.00I
7.00
-
4.70
4.50
5.00
5.50
6.00
6.50
iv) The regulation inter-alia also dealt with the manner of connectivity with the
of State Agencv ,Compliance Audit, ete.
licensee's system, manner of obtaining Renewable En
v) The Regulation also specified the effect of default as u
certificate, designation
"'f the obligated entity does not fUlfillthe RPOas in these.requlotions during
any year and also does not purchase the certificates, the mission may direst the
.1 obligated entit» to deposit in to a separate fund, to be ted and maintained by
such obligated entity, such amount as the commission m determine on the basis of
shortfall in units of RPO and the forbearance price decided by the Central
ICommission" .
The Effect of default further provided that
"the obligated,~ntity shaHbe in breach of its license can
amount directed by the commission within 15 days
direction"
It further provided that
"where any obligated entity fails to comply with the a
required perce-itaqe of power from renewable
I 6
I
if it fails to deposit the
communication of such
ation to purchase the
s or the renewable
I
••Commission designated
as State Agency for
for registration and
energy certificates, it shall be liablefor penalty as may decided by the commission
under section ~42 of the Act.;;
9. Designation of State Agency
I
••As per regulation 6 (1) of the aforesaid Regulations,
Odisha Renewable energy Development Agency (0
accreditation and recommending the Renewable Energy
to undertake functions under the said Regulations whic also formed a part of the
above gazette, notification.
10. Actions byOREDA
- After being deS;ignatedas the State AgencY,OREDA followrng initiatives: .;
a) It firmed up the list of obligated entities in the stat based on the information
received from GRIDCO,OPTCLand EIC( Elect)-cum-P. I
b) On 13-14 July 2011 letters were issued to all obI ted entities making them
aware of their obligations and requesting them to h the status of fulfillment
of their obligations in a pre-designed format (Annexure I Series).·. ,
c) In order to make the Obligated Entities further awa of the RCPORegulation
2010 and their respective roles and responsibilities wi regard to compliance of
the same; OREDAon za'" 'October 2011 organized a rkshops at Bhubaneswar
The lists of participants of the Workshops are annexed Annexure XVIII. '
I
d) Following the workshop for better and wider informa n of all obligated entities
OREDA posted the RCPOand Its Compliance Regul and other details on its
website and intimated the same through' Public N issued in 5 local News
Papers during February 2012. Photocopy of the publish d item in the Newspaper
is attached as Annexure XIX.
e) OREDA had also requested all the obligated entities de letter ,no. 743 dated
29.02.2012 (Annexure XIII) to designate a senior office of their organization as
nodal officer:(RCPO) and provide their contact details in prescribed format.
7
:.-.-.
f) In view of various developments in between OREDA rganized another workshop
at Bhubaneswar on 11. 09. 2012. The list of pa
annexed as-Annexure XXI.
ants of the Workshops is
, g) . As per the cornmunleation of OERC,OREDA su itted quarterly cornpllanes
report base'Cjon the self declaration for power consu ption by different obligated
entities.
I
h) Basedon the-annual consumption figures reported by EIC(Elect)-cllm.PCEIOREDA
calculated the quantum of solar, non-solar and neration obligations of
different obligated entities and computed the us of fulfillment of their
'\);:,
obligation based on the monthly reports provided
entities as-well' as the monthly trade reports' pro
The trade report from power exchange annexed as An
the respective obligated
by the power exchange.
i) OREDA also intimated the above status indicating
quantum of default in each category and the co
deposited by each entity in to a separate ace
regulation to the OERCseeking necessary direction in
intimations are enclosed in Annexure X,XI & XII.
entity-wise
amount to be
out under the
matter. Copies of such
11. Status of compliance
a) The status of compliance by different obligated
furnished bv OREDAto OERCand also pubJished in
under
No. of Fullycompliant entities compliant "n.:ln •••,
ities as per the reports
website of OREDAare as
entities for the yearFY Total No. of obligated
2011-12 'SO
No. of non- compliantentities
14 36
2012-13 50 17 33
2013-14 : 50 , 15 35
8
I
, ';
It may be mentioned that though adequate solar and non-solar RECswere
available in the power hange (table below) the obligated entitiesdid not care to
take any initiatives to pu ase the same and fulfill their respective obligations.
9
. .~
.F,urther more except
· FY. ,..... .~- '.. .~~
.rotal No of RECs available inthe power exchange
, ••
,~' .~,", "",",,",. ~-'.-"".
· 2011-12t._ . .:., ._.",.
Not Available 1053819
i Solar, . No-solar
I · 2012-13J.. 1 73826. 14646
2013-14 108830 207018
. created a separate
iFFCOno other Obligated Entity has reported to have
nt as per the OERCRCPORegulation 7 (I) and deposited
Iy, calculated on the basis of quantum of shortfall of
respective obligation ultiplied by the forbearance price of the respective REC.
The letter of IFFCOin is regard is enclosed as Annexure XXIII.
I Hindalco Industries l had filed a Writ Petition(C) No. 5243 of 2012 challenging
the RCPO~egulatio Notification dated 30.09.2010 issued by the Odisha
Electricity Regulatory Commission whereby the commission has directed the
captive generation pIa ts to mandatorily purchase renewable energy certificates.
Meanwhile 'the case is still pending at High Court of Odisha. The Hon'ble
Commission in letter n . law/HC-06/2012/4255 dated 18.10.2012 clarified OREDA
that lithe interim 0 er has its application to M/s. Hindalco Industries only.
(Petitioner in the writ application) and has no application to any other industry
(Annexure XXIV)." . ' ..~.'
,:. ,
It may be further
in Sou-Motu Case
oned here that in view of OERC'sOrder dated 13.02.2012
111 of 2011 (Annexure XXV) allowing fulfillment of
n through solar and non-solar sources and the subsequent
INo 54 & 59 of 2012 (Annexure XXVI & XXVII respectively)
stating that "The Commission by the impugned order, in order to remove
difficulties faced by e obligated entities, has clarified that the obligation in
I
I
can be met from solar arid non-solar sources but the
ase obligation has to. be met mandatorily. by the
obligated entities an' consuming electricity only from co-generation sources
10
•. f::-~I. !
•e
shall not relieve any•••
ted entity. When such relaxation has been made, the-followed in respect of consumers meeting electricity
captive co-generation power plant in excess of the
" Which has been contested by the OERe in the apex
court (Civilll.ppeal No 5466 and 5467 of 2013) while the two of the obligated
entities named Emam Paper Mills Ltd and Vedanta Aluminum Ltd. appellant in
the ATE in case No & 59 of 2012 had refrained from fulfilling their obligations
like NALCOhave approached the Hon'ble commission inaltogether while
Case ;~v. 21/2013 to i. them to ue :.imliarly !>ituattcidS Ernaml Paper Mii1sdu' . '.
and Vedanta Alurnin Ltd. and have stopped purchasing RECs. Though the
Hon'ble commission s given an order in case No. 21/2013 dated 21.11.2013
(Annexure XXVIII) s ng that the order of the ATE is applicable only to the
mi Paper Mills Ltd and Vedanta Aluminum Ltd) NALCOapplicant entities (
again resorted to file review petition on the same which has also been heard by
the Hon'ble Commissi in Case No. 09/2014 dated 15.09.2014 was adjourned
(Annexure XXIX) beca the the Counsel for NALCOsubmitted that the latest
judgment of Hon'ble inAppeal No. 53/2012 dated 02.12.2013 in Lloyd Metals
(Annexure XXX) is beyond their knowledge as the Hon'ble
to know whether their claim is justified in view of the
In view of the
above case.
mentioned facts it can be very clearly 'concluded that
have taken some initiatives to partially fulfill their
obligations none of t e other obligated entities have taken any effective step to
fulfill their-robligatio which exhibits is clear contravention and absolute
its compliance Regulation -2010 brought by this
noble intention of promoting cogeneration and
from renewable energy in Odisha in the greater interest
idisregard
Hon'ble
generation 'of
addressing issues like he energy crunch, climate change etc.
:.PRAYER
pleased to •• ••
•
•
In view of the aforernenti ned facts and invoking all the provisions under Effect of
Default the pl11:itionerhum Iyprays that the Hon'ble Commission may graciously be
1) inst all defaulting obligated entities at para 11 and punish
I of the direction of Hon'ble Commission under Section
142 of Electricity Act 2 and levy penalty for an amount Rs.l,oo,ooo.oo to each
of them.
.' I 2) direct the defaulting igated entities as per Annexure - IX to create a separate
accountand deposit e fund in the account as mentioned at Annexure-IX and
give adequate control
from the Power Exchange the required number of
nt of the shortfall in the fulfilment of the obligations, out
of the amount in the nd on behalf of the obligated entities.
. ~.... .....,' ;, .. d
Chief Executive, OREDAof the account so as to operate
the Fund and
3) appoint the complian auditor at the earliest as per the provision of Regulation
(8) of OERe(RCPOan its Compliance) Regulations,201o.
4) action against respondent obligated entities for non-I
the provision of OERC(RCPO)Regulation, zoio.
S) pass such other 0 lorders as this' Hon'ble Commission may deem fit and
proper andfor this a of kindness the Applicant Company shall as in duty boundI ever pray.
6) by the Petitioner is for a public purpose the Commission
may kindly refund fees paid as per Para 5 of Notification dt. 31. 08. 2009.
Place: 8~tt~w'.eac ·/f>·;)O/f1
~For Odisha Renewable Energy Development Agency
Chief Executive
Date:PETITIONER
11
-
BEFORE"THE ISHA ELECTRICITYREGULATORY COMMISSIONiyamal< Bhawan, Unit - VIII, Bhubaneswar
IN THE MATTER OF:
CaseNo. --' 2014
- .. .An application filed Petitioner / OREDAunder Sec. 142 of the Electricity Act, 2003for the non-cornplian eof OERC(Renewable and Co-generation Purchase Obligationand its Compliance) ulations, 2010 framed under Section 61, 66, 86 (1) (e) and181 of the Electricity 2003.
-" "I
IN THE MAnER OF
AND
The Chief Executive, EDA,S-59, Mancheswar Industrial Estate, Bhubaneswar-751010.
I
....•...•..Petitioner
-Vrs.-
ging Director, GRIDCO,Janpath, Bhubaneswar and others
00~l~~~\\~"
0396511-:2t,f57~IMl
I, Mr.w;l1joM 13, lr~,"OREDA; having registered 0
751010 do hereby solemnly
......... Respondents
2 0 OCT 2014"56 years, working as Chief Executive,Mancheswar Industrial Estate, Bhubaneswar-
rm and state as follows: -
..~...-'., "
1. That I am the Chiefon its behalf.
utive, OREDAandl am duly authorized to swear this affidavit
2. The statements made nthe petitioner are based on information and I believe themto be true.
PLACE: 13,.,uh fJt IIJ e S
DATE: z.o ·10· lotlJ.
"I
12
DEPONENT