Bangor Waterfront Park
Shadley Associates, P.C.
Waterfront Park
March 17, 2010
Prepared By:
City of Bangor
&
Shadley Associates, P.C.
Bangor Waterfront Park
Shadley Associates, P.C.
Presentation Agenda
• Summary of Waterfront Master Plan
and completed work
• Waterfront Park Master Plan
• Phase I Work
• Next Steps
Bangor Waterfront Park
Shadley Associates, P.C.
Waterfront Master Plan
And
Completed Work
Bangor Waterfront Park
Shadley Associates, P.C.
Bangor Waterfront Park
Shadley Associates, P.C.Built Work
Railroad Street
Improvements, 2004
Water’s Edge Improvements,
2005
Front Street Improvements,
2003
Open Space Improvements,
2003
Phase I Park Improvements, 2009 -
2010
Coal Tar Remediation, 2009
Bangor Waterfront Park
Shadley Associates, P.C.
Bangor Waterfront Park
Shadley Associates, P.C.
Bangor Waterfront Park
Shadley Associates, P.C.
Bangor Waterfront Park
Shadley Associates, P.C.
Waterfront Park
Waterfront Park Area
Bangor Waterfront Park
Shadley Associates, P.C.
Summary of Program Elements:• Open green space• Jogging and walking trails• Bike trails • Strong connections with other
destinations• Spaces for events, performances and
open-air markets (supported by utilities)
• Cross-country skiing• Ice skating• Parking• Playground: Tot Lot and Water Play• Picnic Spaces• Noteworthy Design / Visually Distinct• Lighting and Planting
Park Program
14 Acre Linear Park
Bangor Waterfront Park
Shadley Associates, P.C.
Connections with the Surrounding
Community
Bangor Waterfront Park
Shadley Associates, P.C. Final Park Master Plan
Bangor Waterfront Park
Shadley Associates, P.C.
Phase I Park Under Construction,
2009 - 2010
Railroad Street Parking Lot with drainage
chambers, lights
Waterfront Parking Lot with drainage
chambers, lights and access drive
Multiuse trails and grading for
amphitheater
Compass Rose
Trail connection to Dutton Street with
lights
Fencing and planting along RR Right of
Way
Bangor Waterfront Park
Shadley Associates, P.C.
Stormwater Treatment as approved by the DEP
Bangor Waterfront Park
Shadley Associates, P.C.
Waterfront Park Existing ConditionsLooking north from hotel December 2008
Bangor Waterfront Park
Shadley Associates, P.C. May 2009
Bangor Waterfront Park
Shadley Associates, P.C.
Subsurface drainage
improvements
June 2009
Bangor Waterfront Park
Shadley Associates, P.C.
July 2009 Subsurface Treatment
Chambers
Bangor Waterfront Park
Shadley Associates, P.C.
Extensive earthwork operations
August 2009
Bangor Waterfront Park
Shadley Associates, P.C.September – October 2009: Paving & Curbing
Bangor Waterfront Park
Shadley Associates, P.C.Coal Tar Remediation, Fall 2009
Area to be loamed and seeded, and later planted
Bangor Waterfront Park
Shadley Associates, P.C.
Construction work to be completed this Spring:
- Dutton Street end: paving, lights, rain gardens
- Amphitheater grading and multi-use trails
- Finish paving, including Compass Rose
- Planting, seeding and rain gardens
- Car top boat access
Bangor Waterfront Park
Shadley Associates, P.C.
Car top boat access
Boat Access on Master Plan - Future
Boat Access on Current Construction Phase
8
’
Bangor Waterfront Park
Shadley Associates, P.C.
Work Remaining to
Complete the Park Master Plan
Bangor Waterfront Park
Shadley Associates, P.C.
Bangor Waterfront Park
Shadley Associates, P.C.
Area 1 – East of Waterfront Parking
Lot:
• New Building
• Wet and Dry Playgrounds
• Shoreline Walkway and
Restoration
THIS AREA HAS 90% COMPLETE
DRAWINGS AND SPECIFICATIONS
Bangor Waterfront Park
Shadley Associates, P.C.
New Building:
• Public Restrooms
• Equipment Room to both replace
existing building and to house the
sprayground equipment
Restrooms
Equipment
Bangor Waterfront Park
Shadley Associates, P.C.Dry Playground
Bangor Waterfront Park
Shadley Associates, P.C.Wet Playground
Bangor Waterfront Park
Shadley Associates, P.C.Wet Playground Recirculating Equipment
Bangor Waterfront Park
Shadley Associates, P.C.
Bangor Waterfront Park
Shadley Associates, P.C.
Area 2 – Waterfront Lot to South of
Amphitheater:
• Green Space for Passive
Recreation
• Finished Amphitheater
• Shade Shelters, Walkways, Rain
Gardens, Planting
THIS AREA HAS BEEN DEVELOPED TO
THE MASTER PLAN LEVEL
Bangor Waterfront Park
Shadley Associates, P.C.
Bangor Waterfront Park
Shadley Associates, P.C.
Area 3 – South of Amphitheater to Pike
Industries:
• Great Lawn
• Butterfly Garden
• Walkway to Dutton Street
THIS AREA HAS BEEN DEVELOPED TO
THE MASTER PLAN LEVEL
Bangor Waterfront Park
Shadley Associates, P.C.
Area 1:
• Construction Cost Estimate:
$1,770,700
Area 2:
• Construction Cost Estimate:
$1,350,000
Area 3:
• Construction Cost Estimate:
$675,000
Total Estimated Construction Cost: $3,795,700
Plus Fees, Expenses and Permit Amendment Applications
Bangor Waterfront Park
Shadley Associates, P.C.