BAM Clough Brochure270313single Pagesweb
-
Upload
amara-krishna-kishor -
Category
Documents
-
view
57 -
download
1
Transcript of BAM Clough Brochure270313single Pagesweb
Drawing on a worldwide talent pool of over 30,000
people, state of the art design and construction
methods and technologically advanced equipment,
BAM Clough present a low risk, high quality option for
client near shore marine challenges, ensuring every
project is delivered safely, on time and within budget,
and to the highest safety and quality standards.
BAM Clough leverages the worldwide resources of
each partner to design and construct marine facilities
for major resource projects. Resources includes PT
BAM Decorient in Indonesia for large-scale precast
concrete manufacture, Clough’s Sattahip Fabrication
Yard in Thailand for structural steel and module
fabrication and Delta Marine Consultants (part of Royal
BAM group) in the Netherlands for marine design
expertise.
With a reputation for design and construction excellence, BAM Clough is the market leader in near shore marine project delivery for energy and resource projects in Australasia
Industry Leader Assuring Project Delivery
BAM Clough is a strategic partnership between Royal
BAM Group from the Netherlands and Clough from
Australia. This successful working relationship has
been in existence for almost 50 years.
BAM Clough has its head office in Perth, WA and
operations in Australia, New Zealand, PNG and South
East Asia.
The BAM Clough partnership provides clients with
local and international technical expertise in marine
facility design and construction. As one of Europe’s
largest construction firms, BAM provides access to
a worldwide talent pool of experienced personnel
and specialist construction equipment while Clough
supplies extensive expertise in local project delivery,
experienced local talent and knowledge of the
Australian construction industry.
Established in 1964, BAM Clough combines access to worldwide resources, local project delivery expertise and an enduring commitment to excellence to deliver near shore marine facilities for major resource projects on time, within budget and to the highest safety and quality standards.
WoodsideMarine Structures Phase I(1983)
Parker PointIron Ore Wharf,WA (1964)
Barrow IslandSubmarine Pipeline,WA (1967)
project timeline
WoodsideMarine Structures, Phase II,WA (1985)
Cape Lambert Iron Ore Marine Facility, WA (1970)
Kaltim PrimaCoal Terminal, Indonesia (1991)
Port StanvacBerthing Dolphins & Jetty Extension, SA (1973)
WoodsideLNG Jetty – Train V Expansion, WA (2005)
Port BonythonWharf/ Gas Liquids Terminal, SA (1982)
WoodsidePluto LNG Jetty, WA (2007)
ExxonMobilPNG LNG Jetty, Papua New Guinea (2010)
ChevronWheatstone Product Loading Facility, WA (2012)
INPEX IchthysLNG Product Loading Jetty, NT (2012)
INPEX IchthysLNG Module Offloading Facility, NT (2012)
Harbourworks Clough
site offices
MOF Road, Burrup Peninsula
Dampier, WA 6713
Contact Greg Kember
Postal address:
Harbourworks Clough jv
PO Box 844
Karratha, WA 6714
Email: [email protected]
Head office address:
Harbourworks Clough jv
Level 5, 220 St. Georges Tce.
Perth, WA 6000
Head Office:
BAM CloughLevel 1558 Mounts Bay RoadPerth WA 6000T: +61 8 9281 9281F: +61 8 9281 9943E: [email protected]: www.bamclough.com