BAM Clough Brochure270313single Pagesweb

6
delivering near shore marine projects since 1964

Transcript of BAM Clough Brochure270313single Pagesweb

deliveringnear shore marine projects

since 1964

Drawing on a worldwide talent pool of over 30,000

people, state of the art design and construction

methods and technologically advanced equipment,

BAM Clough present a low risk, high quality option for

client near shore marine challenges, ensuring every

project is delivered safely, on time and within budget,

and to the highest safety and quality standards.

BAM Clough leverages the worldwide resources of

each partner to design and construct marine facilities

for major resource projects. Resources includes PT

BAM Decorient in Indonesia for large-scale precast

concrete manufacture, Clough’s Sattahip Fabrication

Yard in Thailand for structural steel and module

fabrication and Delta Marine Consultants (part of Royal

BAM group) in the Netherlands for marine design

expertise.

With a reputation for design and construction excellence, BAM Clough is the market leader in near shore marine project delivery for energy and resource projects in Australasia

Industry Leader Assuring Project Delivery

BAM Clough is a strategic partnership between Royal

BAM Group from the Netherlands and Clough from

Australia. This successful working relationship has

been in existence for almost 50 years.

BAM Clough has its head office in Perth, WA and

operations in Australia, New Zealand, PNG and South

East Asia.

The BAM Clough partnership provides clients with

local and international technical expertise in marine

facility design and construction. As one of Europe’s

largest construction firms, BAM provides access to

a worldwide talent pool of experienced personnel

and specialist construction equipment while Clough

supplies extensive expertise in local project delivery,

experienced local talent and knowledge of the

Australian construction industry.

Established in 1964, BAM Clough combines access to worldwide resources, local project delivery expertise and an enduring commitment to excellence to deliver near shore marine facilities for major resource projects on time, within budget and to the highest safety and quality standards.

WoodsideMarine Structures Phase I(1983)

Parker PointIron Ore Wharf,WA (1964)

Barrow IslandSubmarine Pipeline,WA (1967)

project timeline

WoodsideMarine Structures, Phase II,WA (1985)

Cape Lambert Iron Ore Marine Facility, WA (1970)

Kaltim PrimaCoal Terminal, Indonesia (1991)

Port StanvacBerthing Dolphins & Jetty Extension, SA (1973)

WoodsideLNG Jetty – Train V Expansion, WA (2005)

Port BonythonWharf/ Gas Liquids Terminal, SA (1982)

WoodsidePluto LNG Jetty, WA (2007)

ExxonMobilPNG LNG Jetty, Papua New Guinea (2010)

ChevronWheatstone Product Loading Facility, WA (2012)

INPEX IchthysLNG Product Loading Jetty, NT (2012)

INPEX IchthysLNG Module Offloading Facility, NT (2012)

Harbourworks Clough

site offices

MOF Road, Burrup Peninsula

Dampier, WA 6713

Contact Greg Kember

Postal address:

Harbourworks Clough jv

PO Box 844

Karratha, WA 6714

Email: [email protected]

Head office address:

Harbourworks Clough jv

Level 5, 220 St. Georges Tce.

Perth, WA 6000

Head Office:

BAM CloughLevel 1558 Mounts Bay RoadPerth WA 6000T: +61 8 9281 9281F: +61 8 9281 9943E: [email protected]: www.bamclough.com