Bali Dream
Gde PutraPaean LeeLilith ShoemakerLoida Vasquez
Sustainability, Buildings, and the Built Environment
Spring 2014
Design Team
Gde Putra ~ Sketchup Artist Visionary
Lilith Shoemaker ~ Water & Waste Specialist
Loida Vasquez ~ Solar Energy Master
Paean Lee ~ Napkin Drawing Inspiration
Mission Environmental ~ Natural Building
Social ~ Vastu Principles
Financial ~ Cost Benefit
Self Sustaining
LEED (Leadership in Energy and Environmental Design)
Guidelines
Family of 4
Inner Walls
Entrance
Meditation Room
KitchenDining Room
Master Bedroom
Living Room
Children’s Bedroom
Office Space
Courtyard
Vastu Room Placements
$7000$2300$0$1000$3000$50$500$2200
Adobe Walls Clay Roof Tiles Stone Foundation Authentic Wood Windows Parquet Wood Flooring Bamboo Entrance Wood Solar Pavillion Man power
Building Materials
Total: $16050= $13.88 per ft2
Water Storage
Cistern
Pump
Pressure Tank PEX System(manifold)
50 gal Water TankSubmersible Pump
Septic
Garden Outlet
Toilet Outlet
KitchenShower & Sink
Laundry
kWh/m^2/day
Denpasar, Indonesia
Jan Feb Mar April May June
4.84 4.96 5.36 5.33 5.14 4.80
July Aug Sep Oct Nov Dev
4.74 5.27 5.88 6.10 5.57 5.18
Solar Irradiance
1. 1000 kWh per month needed2. Chose lowest productive month3. 4.84 kWh X 31 days = 150 kWh/month4. 1000 kWh/150 kWh (per panel) = 6.66 panels or
7 panels5. Increase to 8 panels for good measure
Solar Panel Array
If each panel outputs 250 watts, then… 250w X 8 panels = 2000 total watts If we choose a 24 V charge controller, then… 2000w/24V = 83.33 or 90 amps 100 amp charge controller needed
Charge Controller
1000 kWh/30 days = 33 kWh X 3 = 99 kWh
99 kWh = 99,000 wh99,000wh/24V = 4,125 AHWe need (4) 24V, 1100 AH forklift batteries
Battery Bank
3 day back-up
The maximum load at any given time is 3,500 watts
An inverter has a 95% efficiencyTherefore, 3,700 watts must be fed into
the inverter in order for a 3,500-w output because 3,500/.95 = 3,685-w
(2) 2,500 watt inverters = 5,000 watts
DC to AC Inverter
8 (250-w) solar panels @ $1.50/watt = $3,000 1 (100 A) charge controller = $300 4 (1,100 AH) forklift batteries = $ 14,000 2 (2,500-w) Inverters = $3,000 Accessories (cables) = $ 4,000 Total Estimated Cost = $24,300 (40yr payoff) Estimated Cost Grid-Tied = $10,000 (17yr
payoff)
Estimated Expense
Cost Analysis
Item Bali Dream Conventional
Building $16,050 $40,000
Solar $24,300 ($10,000)
$0
Water $3,000 (23,000) $0
Total $43,350 $40,000
Yearly Water $0 $120
Yearly Electricity $0 $600
ROI 5 years