Balance Table Process / Line Analysis Tool The Balance Table uses time measurement data to reflect the current or proposed condition of a process or series of processes.

Transcript of Balance Table Process / Line Analysis Tool The Balance Table uses time measurement data to reflect...

Page 1: Balance Table Process / Line Analysis Tool The Balance Table uses time measurement data to reflect the current or proposed condition of a process or series.

Balance Table Process / Line Analysis Tool

The Balance Table uses time measurement data to reflect the current or proposed condition of a

process or series of processes.

Page 2: Balance Table Process / Line Analysis Tool The Balance Table uses time measurement data to reflect the current or proposed condition of a process or series.

Company NameBalance Table - Current Condition

0

20

40

60

80

100

120

140

160

180

Ob

se

rve

d C

yc

le T

ime

(s

ec

)

1 2 3 4 5

Process Numbers

Page 3: Balance Table Process / Line Analysis Tool The Balance Table uses time measurement data to reflect the current or proposed condition of a process or series.

0

20

40

60

80

100

120

140

160

180

Ob

se

rve

d C

yc

le T

ime

(s

ec

)

1 2 3 4 5

Process Numbers

Takt TimeTarget Cycle Time

Company NameBalance Table - Current Condition

159”151”

Page 4: Balance Table Process / Line Analysis Tool The Balance Table uses time measurement data to reflect the current or proposed condition of a process or series.

0

20

40

60

80

100

120

140

160

180

Ob

se

rve

d C

yc

le T

ime

(s

ec

)

1 2 3 4 5

Process Numbers

140

Standard Time

130

152

120115

Takt TimeTarget Cycle Time

Company NameBalance Table - Current Condition

159”151”

Page 5: Balance Table Process / Line Analysis Tool The Balance Table uses time measurement data to reflect the current or proposed condition of a process or series.

0

20

40

60

80

100

120

140

160

180

Ob

se

rve

d C

yc

le T

ime

(s

ec

)

1 2 3 4 5

Process Numbers

140130

120 115

Highest Time

Standard Time

Lowest time

Takt TimeTarget Cycle Time

Company NameBalance Table - Current Condition

159”151”

152

Page 6: Balance Table Process / Line Analysis Tool The Balance Table uses time measurement data to reflect the current or proposed condition of a process or series.

0

20

40

60

80

100

120

140

160

180

Ob

se

rve

d C

yc

le T

ime

(s

ec

)

1 2 3 4 5

Process Numbers

140

VA= 66%

NVA= 34%

130120 115

NVA= 35%

VA= 42%

VA= 85%

VA= 47%

VA= 65%

NVA= 53% NVA=

15%

NVA= 58%

Highest Time

Standard Time

Lowest time

Takt TimeTarget Cycle Time

Company NameBalance Table - Current Condition

159”151”

152

Page 7: Balance Table Process / Line Analysis Tool The Balance Table uses time measurement data to reflect the current or proposed condition of a process or series.

0

20

40

60

80

100

120

140

160

180

Ob

se

rve

d C

yc

le T

ime

(s

ec

)

1 2 3 4 5

Process Numbers

Bottleneck

140

VA= 66%

NVA= 34%

130120 115

NVA= 35%

VA= 42%

VA= 85%

VA= 47%

VA= 65%

NVA= 53% NVA=

15%

NVA= 58%

Highest Time

Standard Time

Lowest time

Process Instability

Takt TimeTarget Cycle Time

Company NameBalance Table - Current Condition

159”151”

152

By plotting theHighest observed cycle time,

Lowest observed cycle time andRepresentative (Standard) observed

cycle time a good analysis of the line or process can be made.

•Bottlenecks can be identified.

•High Fluctuation will indicate process instability / abnormal conditions (the need for problem solving).

EXAMPLE:Total Cycle Time= Required # Takt Time of processes

657 4.1 (Actual # of 159” processes required)

C.I. Target= Reduce # of processes to 4 •Continuous Improvement strategies can be developed i.e. 1. - Reduce waste 2. - Rebalance work elements from process # 5 (Targeted Process) into processes 2 and 4. 3. Accumulate all wait time into process # 5.

•Continuous Improvement Target can be determined.