BAKU DEEP WATER JACKETS FACTORY NAMED AFTER …BOS SHELF COMPANY PROFILE Name Type Description...
Transcript of BAKU DEEP WATER JACKETS FACTORY NAMED AFTER …BOS SHELF COMPANY PROFILE Name Type Description...
1
BAKU DEEP WATER JACKETSBAKU DEEP WATER JACKETSFACTORY NAMED AFTER FACTORY NAMED AFTER
HEYDAR ALIYEVHEYDAR ALIYEV
Operated by BOS SHELF LLC
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE
2
LOCATION
BAKU DEEP WATER JACKET FACTORYBAKU DEEP WATER JACKET FACTORYSalyan Highway, Baku, AZ1083 AzerbaidjanSalyan Highway, Baku, AZ1083 Azerbaidjan
KURYK
KASHAGAN FIELD
BAKU
BAKU INTERNATIONAL AIRPORT 35kmsBAKU INTERNATIONAL AIRPORT 35kms
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE
4
YARD TRACK RECORD
• BDJF yard has successfully delivered the following international standards units over the past10 years:
• This resulted in an average 500,000 man-hours per months for an average of 2,325 te ofsteel processed through the workshops.
• These works were performed while performing smaller project such as Kashagan Vesselsmaintenance and construction, TPG-500 structural works, Turkmenistan EWT project support,at the quay side. BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE
Name Type Description Weight(Tones) Man-hours 1st STEEL CUT DELIVERY
DATEDURATION(MONTHS)
CA-PDQ JACKET SINGLE BATTER JACKET 13,142 1,117,906 Mar-02 Dec-03 20CA-PDQ TOPSIDES INTEGRATED DRILLING TOPSIDES 14,777 5,997,686 Apr-02 Oct-04 29CA-CWP JACKET SINGLE BATTER JACKET 12,942 970,094 Nov-02 Aug-04 20WA-PDQ JACKET SINGLE BATTER JACKET 14,069 1,323,998 Jun-03 May-05 22WA-PDQ TOPSIDES INTEGRATED DRILLING TOPSIDES 15,046 6,106,868 Apr-03 Sep-05 28EA-PDQ JACKET SINGLE BATTER JACKET 16,387 1,536,185 Dec-03 Nov-05 22EA-PDQ TOPSIDES INTEGRATED DRILLING TOPSIDES 14,899 6,047,204 Feb-04 Aug-06 29DWG-DUQ JACKET DOUBLE BATTER JACKET 15,670 1,372,888 Nov-04 Sep-06 21DWG-DUQ TOPSIDES INTEGRATED DRILLING TOPSIDES 14,221 5,772,017 Feb-05 Jun-07 27DWG-PCWU JACKET DOUBLE BATTER JACKET 15,078 1,372,888 May-05 May-07 23COP-PDQ JACKET DOUBLE BATTER JACKET 18,100 2,185,000 Jul-10 Oct-12 27SD2-PR JACKET SINGLE BATTER JACKET 13,718 2,111,094 Jun-14 Aug-16 26SD2-QU JACKET SINGLE BATTER JACKET 12,675 1,417,359 May-15 Mar-17 22
Peak period Duration 63Average Monthly Throughput During Peak 2,325 502,785
5
YARD TIMELINE – MAJOR PROJECTS DELIVERY
2001 2002 2003 2004 2005 2006 2007
Skidway #1
Skidway #2
Skidway #3 SOCAR INTERNAL PROJECT
Skidway #4 SOCAR INTERNAL PROJECT
Skidway #5
Skidway #6
2008 2009 2010 2011
CA-PDQCA-PDQ CA-CWPCA-CWP DWG-DUQDWG-DUQ DWG-PCWUDWG-PCWUDADA GORGUDDADA GORGUD
ERSAI 1ERSAI 1
SHAH DENIZSHAH DENIZ
WA-DUQWA-DUQ DWG-DUQDWG-DUQ
EA-DUQEA-DUQCA-DUQCA-DUQ
SBM MOPUSBM MOPU
WA-PDQWA-PDQ EA-PDQEA-PDQ ISTIGLALISTIGLALJUMPER SPOOLJUMPER SPOOL
GEDABEKGEDABEK
CASTORO 12CASTORO 12 ERSAI 4ERSAI 4
ERSAI 2ERSAI 2
2012
COP COP
2013
HEYDAR ALIYEVHEYDAR ALIYEV
2014
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE
2015 2016
Export crossing supports - 75 nos off
Flowline crossing supports - 24 nos off
FTA Mudmat (NF1)
FTA Mudmat (NF2)
FTA Mudmat (WF1)
FTA Mudmat (WF2)
32in Single Export SSIV Foundation & Piles (Line 1)
32in Single Export SSIV Foundation & Piles (Line 2)
16in Single Condensate SSIV Foundation & Piles
12in Dual Infield Production SSIV Foundation & Piles (NF)
SD2 PR Jacket SD2 PR Jacket DADA GORGUDDADA GORGUD COPCOP HEYDAR ALIYEVHEYDAR ALIYEVPR JacketPR Jacket
Tower ErectionTower Erection
2017
SD2 QU JACKETSD2 QU JACKET
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE 6
Scope of Services – Single Stop foronshore/offshore Oil & Gas Support
• Topsides & Jacket Fabricator– Logistics services– Subsea Fabrication & Custom Coating – Vessels Upgrades – Onshore Plant & Process Pre-fabrication – Marine Base Facility
Logistics services
Prefabrication Areas
Erection Areas (6 Delivery lines)
7
KEY ATTRIBUTES FOR SUCCESS
TO FACILITATE SUCCESSFUL PERFORMANCE OF MAJOR PROJECTS, BOS SHELF CAN DEPLOY THE
FOLLOWING COMBINATION OF ATTRIBUTES:
HSES AS A MANAGEMENT PRIORITY.
QUALITY DRIVEN PRODUCTION METHODS.
THE MOST EXTENSIVE PRODUCTION FACILITY IN THE CASPIAN REGION, FULLY
REFURBISHED IN 2001.
INTERNATIONALLY ACKNOWLEDGED EXPERTISE & RESOURCES.
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE
9
BOS SHELF POLICIES
BOS Shelf has developed various polices inconjunction with ManagementCommitment.The BOS Shelf HSE Policies are defined byManagement, with regard to therequirements of the Health, Safety andEnvironment Management Systems.
HEALTH, SAFETY AND ENVIRONMENT POLICY
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE
10
BOS SHELF POLICIES
USE OF PLANT EQUIPMENT ANDTOOL POLICY
SUSTANCES ABUSE POLICY TRANSPORT POLICY
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE
11
HEALTH, SAFETY AND ENVIRONMENTALCERTIFICATION
BOS Shelf Management System is certified ISO18001:2007 and ISO 14001: 2004
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE
13
QUALITY POLICY
The BOS Shelf Quality Policy is defined
by ISO 9001-2008 and Management
commitment with regard to Customer
Satisfaction and the
requirements for Quality
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE
14
ISO CERTIFICATION
BOS SHELF Quality
Management System is
certified to ISO9001:2008
Welders are qualified by ABS
Europe.
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE
15
RMRS CERTIFIED SYSTEM
BOS SHELF Managementsystem is also certified by
RMRS.
RMRS is the referencebody for Caspian Works.
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE
17
GENERAL OVERVIEW OF PRODUCTIONFACILITY
Covered storage Area 11900 m11900 m22
5 Rolling lines 19600 m19600 m22
Fabrication Workshop 68500 m68500 m22
Outdoor Erection Area 583740 m583740 m22
Fitters Training School 2000 m2000 m22
Welders Training School 1296 m1296 m22
Erection Hall 21254m2m2
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE
Topsides Erection 73000 m2
18
PRODUCTION FACILITIES
KEY FIGURES
Yearly Production Capacity: 120 000 t by 2016
Monthly Rolling Capacity: 2 500t (Single Shift)
Annual Production Man-hours: 11 800 000 m/h
Annual Engineering Man-hours: 134 200 m/h
Maximum Indoor Lifting Capacity: 240t
Maximum Outdoor Lifting Capacity: to date 4,200 te
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE
20
LOGISTICS & WAREHOUSING
Direct Access from Garadagh Railway Station to the Warehouse.
Direct Access to Salyan Highway – Part of the Traceca Project.
Dedicated Customs Office within the Yard.
Over 120 000 m2 Storage Available with Segregation Capability.
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE
21
STEEL PREPARATION FACILITY
2 Blasting Machines
4 SAF Multihead Burning Tables
3 Computer Assisted Cutting Machine MEGATOME.
2 Automatic Saws for Beams
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE
22
ROLLING FACILITY
8 rolling machines with capacity up to 150mm thickness and up to 4000-4500
mm internal diameter
3000t vertical press for large cone forming
32 SAW welding booms and 40 Mobile Semi Automatic Welding Machines.
16 Overhead cranes up to 50t capacity.
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE
23
FABRICATION WORKSHOPS
14 Production bays.
Overhead Cranes up to 90t Capacity.
3 Computer Assisted Profiling Machines Muller up to RB 1200.
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE
FEATURES: Dedicated facility for the production of SubseaunitsDedicated Bay with test equipment for: FAT (Factory Acceptance Testing) SIT (Site Integrated Testing)
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE 24
SUBSEA WORKSHOPS No. 9
EQUIPMENT: Testing equipment: Facilities bay 2-3-4 for 300 peopleFacilities bay 1 for 60 peopleBay1: Exotic Pipe Shop 2 Automatic Rotating Inconel weld stations (Polysuade) 6 Automatic Stationary Inconel weld stations (Magnetic)10 Exotic weld stations Dedicated Mobile P.A.U.T Unit (NDT)Bay2:30 welding equipment’s manual(FCAW and SMAW)2 over head cranes 80 t/5t+80/5 tons Bay3:
30 welding equipment’s manual (TIG, FCAW and SMAW)2 over head cranes 80 t/5t+80/5 tons Bay4: 30 welding equipment’s manual (TIG, FCAW and SMAW)2 over head cranes 40 t/5t+40t/5 tons
WORKSHOP No. 11
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE 25
Total covered fabrication area 15000 m2
Overhead cranes capabilityBay one 36 m span1X12.5/50 Te 1X12.5/50 Te 1X20/90 Te
Bay Two 36m span1X12.5/50 Te 1X12.5/50 Te 1X20/90 Te
Welding equipment Two transforms 2500AMP each.No. 2X6 Rectifier Panels.No. 110 Welding Regulators.
Capability for 100 welders to work at the same time.
Production5000 of steel Te/year
26
ERECTION AREA
6 Skidways with a Bearing Capacity from 85 t/lm up to 350 t/lm.
25 Crawler & Mobile Cranes with up to 1350t lifting Capacity.
1500 m quay with 3 x 100 m reinforced offloading area (50t/m2)
Dedicated Push-Pull System capable of moving structure up to 30 000 T.
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE
27
PAINTING/BLASTING
Recoverable Blast medium Monthly Capacity of up to 12 000 m2. Adjacent Area for Expansion.
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE
Temperature Controlled.Environmentally & VOC Compliant Paints.T.S.A. Capability
EXISTING FACILITIES
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE 28
NEW PAINTING FACILITIES
FACILITIES Dedicated to blocks Consisting of three (3) separated areas:
• one (1) for grit blasting, • one (1) for priming, coating and curing• one (1) custom coating
Each bay shall be 25m width by 36m, 72m & 42m respectfully. The overall building size shall be 180m x 25m.
29
SEA ACCESS
No Tide.
Min. Water Depth to Open
Sea: 8.5m
Water depth in front of each
Skidway: 11.9m
Up to 14 Slots available in a
Sheltered harbour for Canal
Barges/Ships.
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE
31
Yard Organisation Chart
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE
Chairman
GeneralDirector
DeputyGeneral Director
ChiefOperating Officer
Supply ChainSnr Manager
Legal & ContractsSnr Manager
QHSESnr Manager
Base Manager
CommercialSnr Manager
HR Snr Manager
FinanceSnr Manager
EngineeringSnr Manager
OperationSnr Manager
WorkshopsManager
ErectionManager
Port & LogisticsBase Manager
PlanningManager
ProductionControl Manager
Assets &Maintenance
ManagerProject
Manager
32
HUMAN RESOURCES
A multi-national skilled team.
• Average 15 years experience in Offshore Industry.
• 7 nationalities represented.
An intensive training program.
• Over 95 000 training hours per year.
• Integrated Fitters and Welders Training Center
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE
EXTENSIVE TRAINING CAPACITY &PROGRAMS
FACILITIES
•Purpose built onsite training school than can support up to 100
personnel
•4 covered bays of 25m x 40m
•Integrated welfare facilities
•Dedicated tooling and equipment
COURSES UNDERTAKEN
•Offshore welding to support pipelay
•Manual welding to support onshore production
•Automatic welding to support onshore construction
•Metal fabrication
•Pipe fabrication
•Rigging
BOS SHELF COMPANY PROFILEBOS SHELF COMPANY PROFILE 33