Bad News Bots E2 Project Design Review 5 - 2/28/2008 Ryan Bove Kara Collins * Peter Courtney Kyle...

8
Bad News Bots E2 Project Design Review 5 - 2/28/2008 Ryan Bove Kara Collins * Peter Courtney Kyle O’Reilly Benjamin Rowland
  • date post

    21-Dec-2015
  • Category

    Documents

  • view

    218
  • download

    0

Transcript of Bad News Bots E2 Project Design Review 5 - 2/28/2008 Ryan Bove Kara Collins * Peter Courtney Kyle...

Page 1: Bad News Bots E2 Project Design Review 5 - 2/28/2008 Ryan Bove Kara Collins * Peter Courtney Kyle O’Reilly Benjamin Rowland.

Bad News Bots E2

Project Design Review 5 - 2/28/2008

Ryan Bove

Kara Collins

* Peter Courtney

Kyle O’Reilly

Benjamin Rowland

Page 2: Bad News Bots E2 Project Design Review 5 - 2/28/2008 Ryan Bove Kara Collins * Peter Courtney Kyle O’Reilly Benjamin Rowland.

Previous Week’s Action Items E2

Website• Website Maintenance and updates (Ben, Kara)

Continued Work on Trade Studies • Robot Turning (Peter)• Optimization of control parameters governing autonomous motion (Ryan)• Motor Selection (Ben)• Bumper Sensor (Kyle)• Scanning Servo Usage (Kara)

Page 3: Bad News Bots E2 Project Design Review 5 - 2/28/2008 Ryan Bove Kara Collins * Peter Courtney Kyle O’Reilly Benjamin Rowland.

Will be used to determine spring

rating for the bumper

http://www.acroname.com/robotics/parts/SharpGP2D12-15.pdf

Bumper Sensor Study E2

Page 4: Bad News Bots E2 Project Design Review 5 - 2/28/2008 Ryan Bove Kara Collins * Peter Courtney Kyle O’Reilly Benjamin Rowland.

Will be used to determine base width and motor speeds for turning

* 2 Exact motors at the same voltage may not run at the same speed

Robot Turning Study E2

Page 5: Bad News Bots E2 Project Design Review 5 - 2/28/2008 Ryan Bove Kara Collins * Peter Courtney Kyle O’Reilly Benjamin Rowland.

Current Status E2

• On Schedule (no immediate showstoppers)• Basic Field Design and Robot Design set

Page 6: Bad News Bots E2 Project Design Review 5 - 2/28/2008 Ryan Bove Kara Collins * Peter Courtney Kyle O’Reilly Benjamin Rowland.

• All Sensors in Hand (except Compass)

Current Status E2

*Sharp GP2D12 Infra-Red Range Sensor ($11.99)

*R/C Servo, HS-311 ($16.95)

Phidgets Force Sensor ($10.99) x2

Dinsmore 1490 Digital Compass ($14.95)

• Trade Studies Completed

Page 7: Bad News Bots E2 Project Design Review 5 - 2/28/2008 Ryan Bove Kara Collins * Peter Courtney Kyle O’Reilly Benjamin Rowland.

Next Week’s Action Items E2

• Use Trade Studies to move project along

• Use Ben’s study to select and purchase motors

• Use other studies to begin to interface sensors with microprocessor

• Continue to update and maintain the webpage

Page 8: Bad News Bots E2 Project Design Review 5 - 2/28/2008 Ryan Bove Kara Collins * Peter Courtney Kyle O’Reilly Benjamin Rowland.

Questions/Comments

Bad News Bots E2