B780 DALRY A737 GLASGOW - AYR RAILWAY · 01 KAB MLJ ELCMay 13 KEY PLAN - NTS SHEET 1 SHEET 2...

7
B780 C93 BLAIRLAND HOUSING ESTATE A737 A737 GLASGOW - AYR RAILWAY DALRY 2500 2600 2700 2800 2900 3000 3100 3200 3300 3400 3500 3600 3700 3800 0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300 2400 AUCHENGREE ROAD IN ASSOCIATION WITH REV DRAWING TITLE SCALE @ A3 DRAWING NO ENGINEER CHECKED BY: APPROVED BY: DATE: DATE: DATE DESIGN BY: DATE: DRAWN BY: DATE: BY CHKD REVISIONS AMENDMENTS REV CLIENT PROJECT TITLE APP'D This map is based upon Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty's stationery Office (c) Crown copyright 2011. Any unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. Scottish Executive Licence number : 100046668 2012. DRAWING STATUS MLJ Nov 12 KAB Nov 12 Nov 12 ELC Nov 12 MLJ Report 03 Figure 16.1 1:15000 Water Features Location Plan Water Features Survey KEY SURVEY AREA - 850m RADIUS FROM ROAD EXTENT PROPOSED ROAD EXTENT - POTENTIAL GROUNDWATER ABSTRACTION/DRAIN AREA NATURAL WATERCOURSE, i.e. RIVER, ISSUES MAN MADE DITCH/DRAIN W D W1 W2 W1 W3 W4 W5 W6 W9 W12 W14 W13 W17 W16 W11 WF1 WF2 FC1 FC3 OT1 AB3 W10 W7 W15 W18 W20 PSD1 OT2 AB2 AB1 WF3 WF4 FC2 FC4 W8 D1 D3 D5 D6 D7 D8 D9 D10 D11 D12 D13 D16 D17 D18 D20 D19 PSD2 WF6 AB5 D2 D4 D14 D15 W19 W21 WF5 WF7 D21 NOTES 1. THIS DRAWING TO BE READ IN CONJUNCTION WITH THE COMPLETED SEPA WAT-FORM-10: WATER FEATURES SURVEY IDENTIFICATION FORM. 2. THIS DRAWING SHOWS KNOWN WATER FEATURES ONLY. OTHER WATER FEATURES, NOT IDENTIFIED ON THE DRAWING, MAY ALSO BE PRESENT IN THE AREA OF INTEREST. 3. DRAWING BASED ON ROAD ALIGNMENT MODEL X_R_Stage 3 Design Rev 06. WF - WATER FEATURE, i.e. POND, WETLAND FC - FLOW CONTROL STRUCTURE, i.e. WEIR AB - ABSTRACTION PSD - POINT SOURCE DISCHARGE OT - OTHER May 13 KAB MLJ AB4 removed, road alignment model updated. 01 ELC A737 Dalry Bypass Environmental Statement June 13 KAB MLJ Flood compensatory storage area added. 02 ELC W17 July 13 KAB MLJ Drawing title and labels revised. 03 ELC

Transcript of B780 DALRY A737 GLASGOW - AYR RAILWAY · 01 KAB MLJ ELCMay 13 KEY PLAN - NTS SHEET 1 SHEET 2...

Page 1: B780 DALRY A737 GLASGOW - AYR RAILWAY · 01 KAB MLJ ELCMay 13 KEY PLAN - NTS SHEET 1 SHEET 2 Drainage layout revised. Road model updated. A737 Dalry Bypass Environmental Statement

B

7

8

0

C

9

3

BLAIRLAND

HOUSING

ESTATE

A

7

3

7

A

7

3

7

GLA

SG

OW

- A

YR

RA

ILW

AY

DALRY

2

5

0

0

2

6

0

0

2700

2800

2

9

0

0

3

0

0

0

3

1

0

0

3

2

0

0

3

3

0

0

3

4

0

0

3

5

0

0

3

6

0

0

3

7

0

0

3

8

0

0

0

1

0

0

2

0

0

3

0

0

4

0

0

5

0

0

6

0

0

7

0

0

8

0

0

9

0

0

1000

1100

1200

1300

1400

1500

1600

1700

1800

1900

2000

2100

22

00

2300

2400

A

U

C

H

E

N

G

R

E

E

R

O

A

D

IN ASSOCIATION WITH

REV

DRAWING TITLE

SCALE @ A3 DRAWING NO

ENGINEER

CHECKED BY:

APPROVED BY:

DATE:

DATE:DATE

DESIGN BY:

DATE:

DRAWN BY:

DATE:BY CHKDREVISIONS

AMENDMENTS

REV

CLIENT PROJECT TITLE

APP'D

This map is based upon Ordnance Survey material with the permission of OrdnanceSurvey on behalf of the Controller of Her Majesty's stationery Office (c) Crowncopyright 2011. Any unauthorised reproduction infringes Crown copyright and

may lead to prosecution or civil proceedings. Scottish Executive Licence number :100046668 2012.

DRAWING STATUS

MLJ

Nov 12

KAB

Nov 12Nov 12

ELC

Nov 12

MLJ

Report

03Figure 16.1

1:15000

Water Features Location Plan

Water Features Survey

KEY

SURVEY AREA - 850m RADIUS FROM

ROAD EXTENT

PROPOSED ROAD EXTENT -

POTENTIAL GROUNDWATER

ABSTRACTION/DRAIN AREA

NATURAL WATERCOURSE, i.e.

RIVER, ISSUES

MAN MADE DITCH/DRAIN

W

D

W1

W2

W1

W3

W4

W5

W6

W9

W12

W14

W13

W17

W16

W11

WF1

WF2

FC1

FC3

OT1

AB3

W10

W7

W15

W18

W20

PSD1

OT2

AB2

AB1

WF3

WF4

FC2

FC4

W8

D1

D3

D5

D6

D7

D8

D9

D10

D11

D12

D13

D16

D17

D18

D20

D19

PSD2

WF6

AB5

D2

D4

D14

D15

W19

W21

WF5

WF7

D21

NOTES

1. THIS DRAWING TO BE READ IN

CONJUNCTION WITH THE COMPLETED

SEPA WAT-FORM-10: WATER

FEATURES SURVEY IDENTIFICATION

FORM.

2. THIS DRAWING SHOWS KNOWN

WATER FEATURES ONLY. OTHER

WATER FEATURES, NOT IDENTIFIED

ON THE DRAWING, MAY ALSO BE

PRESENT IN THE AREA OF INTEREST.

3. DRAWING BASED ON ROAD

ALIGNMENT MODEL X_R_Stage 3 Design

Rev 06.

WF - WATER FEATURE, i.e. POND,

WETLAND

FC - FLOW CONTROL STRUCTURE, i.e.

WEIR

AB - ABSTRACTION

PSD - POINT SOURCE DISCHARGE

OT - OTHER

May 13KAB MLJAB4 removed, road alignment model updated.01 ELC

A737 Dalry Bypass

Environmental Statement

June 13KAB MLJFlood compensatory storage area added.02 ELC

W17

July 13KAB MLJDrawing title and labels revised.03 ELC

Page 2: B780 DALRY A737 GLASGOW - AYR RAILWAY · 01 KAB MLJ ELCMay 13 KEY PLAN - NTS SHEET 1 SHEET 2 Drainage layout revised. Road model updated. A737 Dalry Bypass Environmental Statement

200

0

50

100

150

0

5

0

1

0

0

1

5

0

2

0

0

2

5

0

3

0

0

3

5

0

4

0

0

5

0

1

0

0

150

200

2

5

0

300

35

0

2

5

0

0

2

6

0

0

2700

2800

2

9

0

0

3

0

0

0

3

1

0

0

3

2

0

0

3

3

0

0

3

4

0

0

3

5

0

0

3

6

0

0

3

7

0

0

3

8

0

0

0

1

0

0

2

0

0

3

0

0

4

0

0

5

0

0

6

0

0

7

0

0

8

0

0

9

0

0

1000

1100

1200

1300

1400

1500

1600

1700

1800

1900

2000

2100

22

00

2300

2400

FOR FULL CATCHMENT

EXTENT REFER TO INSET

FOR FULL CATCHMENT EXTENT

REFER TO INSET

B

7

8

0

BLAIRLAND

HOUSING

ESTATE

A

7

3

7

A

7

3

7

GLA

SG

OW

- A

YR

RA

ILW

AY

DALRY

C

9

3

A

U

C

H

E

N

G

R

E

E

R

O

A

D

IN ASSOCIATION WITH

REV

DRAWING TITLE

SCALE @ A3 DRAWING NO

ENGINEER

CHECKED BY:

APPROVED BY:

DATE:

DATE:DATE

DESIGN BY:

DATE:

DRAWN BY:

DATE:BY CHKDREVISIONS

AMENDMENTS

REV

CLIENT PROJECT TITLE

APP'D

This map is based upon Ordnance Survey material with the permission of OrdnanceSurvey on behalf of the Controller of Her Majesty's stationery Office (c) Crowncopyright 2011. Any unauthorised reproduction infringes Crown copyright and

may lead to prosecution or civil proceedings. Scottish Executive Licence number :100046668 2012.

DRAWING STATUS

MLJ

Nov 12

KAB

Nov 12Nov 12

ELC

Nov 12

MLJ

Report

03Figure 16.2

1:15000

Boundaries (Indicative)

Existing Watercourse Catchment

KEY

RIVER GARNOCK (W6)

CAAF WATER (W2)

UNNAMED TRIBUTARY OF

RIVER GARNOCK (W8)

RIVER GARNOCK (W6) VIA

UNNAMED TRIBUTARIES

UNNAMED TRIBUTARY OF

RIVER GARNOCK (W15)

COALHEUGHGLEN BURN (W17)

UNNAMED TRIBUTARY OF

COALHEUGHGLEN BURN (W18)

BOMBO BURN (W9)

(FULL EXTENT NOT SHOWN)

CAAF WATER CATCHMENT

RIVER GARNOCK CATCHMENT

(NOT TO SCALE)

(NOT TO SCALE)

NOTES

1. DRAWING BASED ON ROAD

ALIGNMENT MODEL X_R_Stage 3

Design Rev 06.

May 13KAB MLJ

W8 catchment boundary revised, road alignment model updated.

01 ELC

A737 Dalry Bypass

Environmental Statement

June 13KAB MLJFlood compensatory storage area added.02 ELC

July 13KAB MLJDrawing title and labels revised.03 ELC

Page 3: B780 DALRY A737 GLASGOW - AYR RAILWAY · 01 KAB MLJ ELCMay 13 KEY PLAN - NTS SHEET 1 SHEET 2 Drainage layout revised. Road model updated. A737 Dalry Bypass Environmental Statement

EXISTING DRAINAGE

TIE-IN

VIADUCT DRAINAGE

(NETWORK 2) DISCHARGE

TO SWALE VIA CASCADE

NEW CONNECTION TO

DRAINAGE DITCH AT EXISTING

OUTFALL LOCATION

EXISTING DRAINAGE

TIE-IN

BRIDGE DECK DRAINAGE

(TIE IN TO NETWORK 9)

TIE-IN TO EXISTING

DRAINAGE

DRAINAGE

NETWORK 1

DRAINAGE

NETWORK 1a

DRAINAGE

NETWORK 4

DRAINAGE

NETWORK 9

DRAINAGE

NETWORK 8

DRAINAGE

NETWORK 6

SWALE

(NETWORK 5)

PSD1

DISCHARGE FROM

SB1 TO CAAF WATER

PSD2

DISCHARGE FROM SB2 TO

UNNAMED TRIBUTARY OF

RIVER GARNOCK

PSD3

DISCHARGE FROM SB3

TO UNNAMED

TRIBUTARY OF RIVER

GARNOCK

SB2 ACCESS

TRACK/EARTHWORKS

DRAINAGE DISCHARGE TO

RIVER GARNOCK

SB1

EC3

EC1

EC2

SB2

D1

SB3

0

1

0

0

2

0

0

3

0

0

4

0

0

5

0

0

6

0

0

7

0

0

8

0

0

9

0

0

1000

1100

1200

1300

1400

1500

1600

1700

1800

1900

2000

2100

22

00

SWALES TO TIE-IN

TO EXISTING

DRAINAGE DITCHES

BLAIRLAND

HOUSING

ESTATE

A

7

3

7

GLA

SG

OW

- A

YR

RA

ILW

AY

FLOOD COMPENSATORY

STORAGE

(UNDER VIADUCT)

DRAINAGE

NETWORK 9a

C

A

A

F

W

A

T

E

R

R

I

V

E

R

G

A

R

N

O

C

K

NC1

EXISTING DRAINAGE

TIE-IN

DRAINAGE NETWORK 2

(VIADUCT DRAINAGE)

C

9

3

IN ASSOCIATION WITH

REV

DRAWING TITLE

SCALE @ A3 DRAWING NO

ENGINEER

CHECKED BY:

APPROVED BY:

DATE:

DATE:DATE

DESIGN BY:

DATE:

DRAWN BY:

DATE:BY CHKDREVISIONS

AMENDMENTS

REV

CLIENT PROJECT TITLE

APP'D

This map is based upon Ordnance Survey material with the permission of OrdnanceSurvey on behalf of the Controller of Her Majesty's stationery Office (c) Crowncopyright 2011. Any unauthorised reproduction infringes Crown copyright and

may lead to prosecution or civil proceedings. Scottish Executive Licence number :100046668 2012.

DRAWING STATUS

MLJ

Nov 12

KAB

Nov 12Nov 12

ELC

Nov 12

MLJ

Report

03Figure 16.3a

1:7500

General Arrangement (Sheet 1 of 2)

Road Surface Drainage Layout

KEY

ROAD DRAINAGE - FILTER TRENCH

ROAD DRAINAGE - CARRIER PIPE

SWALE

EARTHWORKS DRAINAGE

EXISTING WATERCOURSE

EXISTING CULVERT

NEW CULVERT

WATERCOURSE DIVERSION

SUDS BASIN/FLOOD

COMPENSATORY STORAGE

POINT SOURCE DISCHARGE

(SUDS OUTFALL)

PSD1

EC1

NC1

D1

SB1

NOTES

1. DRAWING BASED ON ROAD

ALIGNMENT MODEL X_R_Stage 3 Design

Rev 06.

May 13KAB MLJDrainage layout revised. Road model updated.01 ELC

KEY PLAN - NTS

SHEET 1

SHEET 2

A737 Dalry Bypass

Environmental Statement

June 13KAB MLJDrainage layout revised. Flood compensatory storage area added.02 ELC

July 13KAB MLJDrawing title and labels revised.03 ELC

Page 4: B780 DALRY A737 GLASGOW - AYR RAILWAY · 01 KAB MLJ ELCMay 13 KEY PLAN - NTS SHEET 1 SHEET 2 Drainage layout revised. Road model updated. A737 Dalry Bypass Environmental Statement

EXISTING DRAINAGE

TIE-IN

EXISTING DRAINAGE

DITCH TIE-IN

NETWORK 8

DRAINAGE

NETWORK 6

SWALE

(NETWORK 5)

DRAINAGE

NETWORK 3

DRAINAGE

NETWORK 7

DRAINAGE

NETWORK 3

PSD3

DISCHARGE FROM SB3

TO UNNAMED

TRIBUTARY OF RIVER

GARNOCK

PSD4

DISCHARGE FROM SB4 TO

COALHEUGHGLEN BURN

PSD5

DISCHARGE FROM SB5 TO

UNNAMED TRIBUTARY OF

COALHEUGHGLEN BURN

DRAINAGE

NETWORK 6

SB3

SB4

SB5

NC3

NC2

NC4

D2

EC5

EC6

EC7

D2

0

5

0

1

0

0

150

200

250

2

5

0

0

2

6

0

0

2700

2800

2

9

0

0

3

0

0

0

3

1

0

0

3

2

0

0

3

3

0

0

3

4

0

0

3

5

0

0

3

6

0

0

3

7

0

0

3

8

0

0

1600

1700

1800

1900

2000

2100

22

00

2300

2400

SWALES TO TIE-IN

TO EXISTING

DRAINAGE DITCHES

GLA

SG

OW

- A

YR

RA

ILW

AY

A

7

3

7

EC4

CATTLE UNDERPASS

DRAINAGE

EXISTING DRAINAGE

TIE-IN

NC5

CATTLE

UNDERPASS

C

O

A

L

H

E

U

G

H

G

L

E

N

B

U

R

N

EXISTING CULVERT

TO BE EXTENDED

CYCLE TRACK DRAINAGE

DISCHARGE TO

COALHEUGHGLEN BURN

C

9

3

A

U

C

H

E

N

G

R

E

E

R

O

A

D

IN ASSOCIATION WITH

REV

DRAWING TITLE

SCALE @ A3 DRAWING NO

ENGINEER

CHECKED BY:

APPROVED BY:

DATE:

DATE:DATE

DESIGN BY:

DATE:

DRAWN BY:

DATE:BY CHKDREVISIONS

AMENDMENTS

REV

CLIENT PROJECT TITLE

APP'D

This map is based upon Ordnance Survey material with the permission of OrdnanceSurvey on behalf of the Controller of Her Majesty's stationery Office (c) Crowncopyright 2011. Any unauthorised reproduction infringes Crown copyright and

may lead to prosecution or civil proceedings. Scottish Executive Licence number :100046668 2012.

DRAWING STATUS

MLJ

Nov 12

KAB

Nov 12Nov 12

ELC

Nov 12

MLJ

Report

03Figure 16.3b

1:7500

General Arrangement (Sheet 2 of 2)

Road Surface Drainage Layout

KEY

ROAD DRAINAGE - FILTER TRENCH

ROAD DRAINAGE - CARRIER PIPE

SWALE

EARTHWORKS DRAINAGE

EXISTING WATERCOURSE

EXISTING CULVERT

NEW CULVERT

WATERCOURSE DIVERSION

SUDS BASIN/FLOOD

COMPENSATORY STORAGE

POINT SOURCE DISCHARGE

(SUDS OUTFALL)

PSD1

EC1

NC1

D1

SB1

NOTES

1. DRAWING BASED ON ROAD

ALIGNMENT MODEL X_R_Stage 3 Design

Rev 06.

May 13KAB MLJ01 ELC

KEY PLAN - NTS

SHEET 1

SHEET 2

Drainage layout revised. Road model updated.

A737 Dalry Bypass

Environmental Statement

June 13KAB MLJDrainage layout revised. Flood compensatory storage area added.02 ELC

July 13KAB MLJDrawing title and labels revised.03 ELC

Page 5: B780 DALRY A737 GLASGOW - AYR RAILWAY · 01 KAB MLJ ELCMay 13 KEY PLAN - NTS SHEET 1 SHEET 2 Drainage layout revised. Road model updated. A737 Dalry Bypass Environmental Statement

0

1

0

0

2

0

0

3

0

0

4

0

0

5

0

0

6

0

0

7

0

0

8

0

0

9

0

0

1000

1100

1200

1300

1400

1500

1600

1700

1800

1900

BLAIRLAND

HOUSING

ESTATE

GLA

SG

OW

- A

YR

RA

ILW

AY

SPOIL

HEAP

1897-2001

FIREBRICK

WORKS

1958-1991

SPOIL

HEAP

1897-1989

BLAIR

IRONWORKS

1858-1897

M

IN

E

R

A

L

R

A

IL

W

A

Y

1

8

9

6

-1

9

5

8

BLAIR

FOUNDRY

1911-1958

CARSEHEAD

BRICKWORKS

1970-2001

AQ

UE

DU

CT

1911-1

970

2BH0042BH003

2BH005

2BH006

2BH002

2BH008

2BH007

2BH009

2BH015

2BH048

2BH031

2BH051

P

P

RHP

BTEX

PAH

All clear

P

S04

P

P

P

P

P

P

Not sampled?

C

9

3

BLAIRLAND

HOUSING

ESTATE

A

7

3

7

B

7

8

0

D

A

L

R

Y

IN ASSOCIATION WITH

REV

DRAWING TITLE

SCALE @ A3 DRAWING NO

ENGINEER

CHECKED BY:

APPROVED BY:

DATE:

DATE:DATE

DESIGN BY:

DATE:

DRAWN BY:

DATE:BY CHKDREVISIONS

AMENDMENTS

REV

CLIENT PROJECT TITLE

APP'D

This map is based upon Ordnance Survey material with the permission of OrdnanceSurvey on behalf of the Controller of Her Majesty's stationery Office (c) Crowncopyright 2011. Any unauthorised reproduction infringes Crown copyright and

may lead to prosecution or civil proceedings. Scottish Executive Licence number :100046668 2012.

DRAWING STATUS

JH

May 13

KAB

May 13May 13

ELC

May 13

JH

Report

02Figure 16.4a

1:7500

(Sheet 1 of 2)

Groundwater and Surfacewater Quality

NOTES

1. DRAWING BASED ON ROAD

ALIGNMENT MODEL X_R_Stage 3 Design

Rev 06.

KEY PLAN - NTS

SHEET 1

SHEET 2

A737 Dalry Bypass

Environmental Statement

KEY

SURFACE WATER SAMPLE POINT

GROUNDWATER ABSTRACTION

SAMPLE POINT

S

G

OLD MINE ADIT 'DAY LEVEL'

SAMPLE POINT

M

CONTAMINANTS > WATER

ENVIRONMENT ASSESSMENT

CRITERIA

TPH

MANGANESE

ALUMINIUM

IRON

ABOVE ASSESSMENT CRITERIA

FORMER INDUSTRIAL SITE

FORMER COLLIERY SITE

FORMER QUARRY SITE

DISMANTLED RAILWAY

CONTAMINATION POINT SOURCE

BOREHOLE

BH

June 13KAB JHFlood compensatory storage area and SUDS basins added.01 ELC

July 13KAB MLJDrawing title revised and labels added.02 ELC

Page 6: B780 DALRY A737 GLASGOW - AYR RAILWAY · 01 KAB MLJ ELCMay 13 KEY PLAN - NTS SHEET 1 SHEET 2 Drainage layout revised. Road model updated. A737 Dalry Bypass Environmental Statement

0

5

0

1

0

0

150

200

250

2

5

0

0

2

6

0

0

2700

2800

2

9

0

0

3

0

0

0

3

1

0

0

3

2

0

0

3

3

0

0

3

4

0

0

3

5

0

0

3

6

0

0

3

7

0

0

3

8

0

0

1600

1700

1800

1900

2000

2100

22

00

2300

2400

GLA

SG

OW

- A

YR

RA

ILW

AY

DISUSED

QUARRY

1850-1897

DISUSED

QUARRY

1858-1897

SPOIL

HEAP

1897-2001

BLAIR

IRONWORKS

1858-1897

BLAIR

FOUNDRY

1911-1958

CARSEHEAD

BRICKWORKS

1970-2001

DISUSED

QUARRY

1857-1897

2BH017

P

Not sampled?

2BH073

P

C

9

3

A

7

3

7

GLA

SG

OW

- A

YR

RA

ILW

AY

A

U

C

H

E

N

G

R

E

E

R

O

A

D

B

7

8

0

D

A

L

R

Y

IN ASSOCIATION WITH

REV

DRAWING TITLE

SCALE @ A3 DRAWING NO

ENGINEER

CHECKED BY:

APPROVED BY:

DATE:

DATE:DATE

DESIGN BY:

DATE:

DRAWN BY:

DATE:BY CHKDREVISIONS

AMENDMENTS

REV

CLIENT PROJECT TITLE

APP'D

This map is based upon Ordnance Survey material with the permission of OrdnanceSurvey on behalf of the Controller of Her Majesty's stationery Office (c) Crowncopyright 2011. Any unauthorised reproduction infringes Crown copyright and

may lead to prosecution or civil proceedings. Scottish Executive Licence number :100046668 2012.

DRAWING STATUS

KEY PLAN - NTS

SHEET 1

SHEET 2

A737 Dalry Bypass

Environmental Statement

JH

May 13

KAB

May 13May 13

ELC

May 13

JH

Report

02Figure 16.4b

1:7500

(Sheet 2 of 2)

Groundwater and Surfacewater Quality

NOTES

1. DRAWING BASED ON ROAD

ALIGNMENT MODEL X_R_Stage 3 Design

Rev 06.

KEY

SURFACE WATER SAMPLE POINT

GROUNDWATER ABSTRACTION

SAMPLE POINT

S

G

OLD MINE ADIT 'DAY LEVEL'

SAMPLE POINT

M

CONTAMINANTS > WATER

ENVIRONMENT ASSESSMENT

CRITERIA

TPH

MANGANESE

ALUMINIUM

IRON

ABOVE ASSESSMENT CRITERIA

FORMER INDUSTRIAL SITE

FORMER COLLIERY SITE

FORMER QUARRY SITE

DISMANTLED RAILWAY

CONTAMINATION POINT SOURCE

BOREHOLE

BH

June 13KAB JHSUDS basins added.01 ELC

July 13KAB MLJDrawing title revised and labels added.02 ELC

Page 7: B780 DALRY A737 GLASGOW - AYR RAILWAY · 01 KAB MLJ ELCMay 13 KEY PLAN - NTS SHEET 1 SHEET 2 Drainage layout revised. Road model updated. A737 Dalry Bypass Environmental Statement

0

5

0

1

0

0

1

5

0

2

0

0

0

5

0

1

0

0

150

200

250

2

5

0

0

2

6

0

0

2700

2800

2

9

0

0

3

0

0

0

3

1

0

0

3

2

0

0

3

3

0

0

3

4

0

0

3

5

0

0

3

6

0

0

3

7

0

0

0

1

0

0

2

0

0

3

0

0

4

0

0

5

0

0

6

0

0

7

0

0

8

0

0

9

0

0

1000

1100

1200

1300

1400

1500

1600

1700

1800

1900

2000

2100

22

00

2300

2400

APPROXIMATE LOCATION

OF SEPTIC TANK.

BLAIRLAND FARM

APPROXIMATE LOCATION

OF SEPTIC TANK.

HILLEND FARM

APPROXIMATE

DIRECTION OF

OUTFLOW APPROXIMATE

DIRECTION OF

OUTFLOW

APPROXIMATE LOCATIONS

OF SEPTIC TANK.

STOOPSHILL FARM

APPROXIMATE

DIRECTION OF

OUTFLOW

APPROXIMATE LOCATION

OF SEPTIC TANK.

DIRECTION OF OUTFLOW

UNKNOWN. CARSEHEAD

APPROXIMATE ROUTE

OF FOUL DRAINAGE

TO SEPTIC TANK

APPROXIMATE LOCATION

OF SEPTIC TANK

HIGHFIELD FARM

APPROXIMATE

DIRECTION OF OUTFLOW

APPROXIMATE DIRECTION

OF OUTFLOW

APPROXIMATE

LOCATION OF SEPTIC

TANK

BIRKENTOP COTTAGE

APPROXIMATE LOCATION OF

SEPTIC TANK

EASTER HIGHFIELD

FARM/EASTER HIGHFIELD

LODGE

APPROXIMATE LOCATION

OF SEPTIC TANKS

SEPTIC TANK DISCHARGE.

GARDEN COTTAGE, BLAIR ESTATE

SEPTIC TANK DISCHARGE.

NORTH LODGE, BLAIR ESTATE

SEPTIC TANK DISCHARGE.

CRAIGHEAD FARM

SEPTIC TANK DISCHARGE.

18 KILWINNING ROAD

SEPTIC TANK DISCHARGE.

NETHER CRUNCHIE

SEPTIC TANK DISCHARGE.

KERSLOCHMUIR

SEPTIC TANK DISCHARGE.

1 BELLSTONE COTTAGE

SEPTIC TANK

DISCHARGE.

HIGHFIELD FARM AND

BYRE CONVERSION

SEPTIC TANK

DISCHARGE.

EASTER HIGHFIELD

CARAVAN (2NO.)

SEPTIC TANK

DISCHARGE.

THE BUNGALOW,

LITTLE ACRE

SEPTIC TANK DISCHARGE.

IAIONA, BELLA VISTA, NEWACRE

TRADE DISCHARGE.

FRESHWATER STREAM/RIVER.

MONKCASTLE MINE

FRESHWATER STREAM/RIVER.

DOUGLAS FIREBRICK WORKS

TRADE DISCHARGE.

FRESHWATER STREAM/RIVER.

DOUGLAS FIREBRICK WORKS

FRESHWATER STREAM/RIVER.

DOUGLAS FIREBRICK WORKS

FRESHWATER STREAM/RIVER.

DOUGLAS FIREBRICK WORKS

FRESHWATER STREAM/RIVER.

GARNOCK VALLEY SEWER

COMBINED SEWER OVERFLOW

FRESHWATER STREAM/RIVER.

PRIVATE HOUSING DEVELOPMENt

FRESHWATER STREAM/RIVER.

COMBINED SEWER OUTFALL

FRESHWATER STREAM/RIVER.

COMBINED SEWER OUTFALL

FRESHWATER STREAM/RIVER.

COMBINED SEWER OVERFLOW

TRADE DISCHARGE .

FRESHWATER STREAM/RIVER.

CARSEHEAD FOUNDARY

SEPTIC TANK DISCHARGE.

FRESHWATER STREAM/RIVER.

CARSEHEAD SEPTIC TANK

ONTO LAND.

CARSEHEAD FARM

ONTO LAND.

JIMMARY LODGE

SEPTIC TANK DISCHARGE.

FRESHWATER STREAM/RIVER.

COALHEUGHGLEN FARMHOUSE

APPROXIMATE

DIRECTION OF

OUTFLOW

ASSUMED DIRECTION

OF OUTFLOW

APPROXIMATE LOCATION OF

SEPTIC TANKS AND DIRECTION

OF OUTFALL

PASTUREHILL COTTAGES

B

7

8

0

BLAIRLAND

HOUSING

ESTATE

A

7

3

7

A

7

3

7

GLASG

OW

- AYR RAILWAY

DALRY

C

9

3

A

U

C

H

E

N

G

R

E

E

R

O

A

D

KEY

WATERCOURSE, i.e. RIVER,

ISSUES, MANMADE DITCH/DRAIN

IN ASSOCIATION WITH

REV

DRAWING TITLE

SCALE @ A3 DRAWING NO

ENGINEER

CHECKED BY:

APPROVED BY:

DATE:

DATE:DATE

DESIGN BY:

DATE:

DRAWN BY:

DATE:BY CHKDREVISIONS

AMENDMENTS

REV

CLIENT PROJECT TITLE

APP'D

This map is based upon Ordnance Survey material with the permission of OrdnanceSurvey on behalf of the Controller of Her Majesty's stationery Office (c) Crowncopyright 2011. Any unauthorised reproduction infringes Crown copyright and

may lead to prosecution or civil proceedings. Scottish Executive Licence number :100046668 2012.

DRAWING STATUS

MLJ

Nov 12

KAB

Nov 12Nov 12

ELC

Nov 12

MLJ

Report

03Figure 16.5

1:12500

Location Plan

Existing Wastewater Discharge Points

INFORMATION OBTAINED FROM

SEPA

(REGISTERED SEPTIC TANK

DISCHARGES)

INFORMATION OBTAINED

THROUGH CONSULTATION

WITH LAND OWNER/OCCUPIER

(APPROXIMATE SEPTIC TANK

LOCATIONS AND DISCHARGE

ROUTES)

INFORMATION DERIVED FROM

ENVIROCHECK REPORT, JUNE

2012

(DISCHARGE POINTS

POSITIONAL ACCURACY 100m)

NOTES

1. DRAWING BASED ON ROAD

ALIGNMENT MODEL X_R_Stage 3 Design

Rev 06.

May 13KAB MLJ

Septic tank outfalls relocated, road alignment model updated.

01 ELC

A737 Dalry Bypass

Environmental Statement

June 13KAB MLJFlood compensatory storage area added.02 ELC

July 13KAB MLJDrawing title and labels revised.03 ELC