    Anacostia Waterfront Initiative

    Martin Luther King, Jr. Memorial Library

    Sunday, August 24, 2014

  • 8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014

    2/20

    2

    Anacostia Waterfront

    FINAL REPORT JUNE 2005

    30-Year, $10 Billion Series Projects

    Created by March 2000 Memorandum ofUnderstanding Between the District and

    19 Other Federal and Regional Agencies

    5 Key Themes:

    o

    Restore:A clean and active river.o Connect:Eliminating barriers and

    gaining access.

    o Play:A great riverfront park system.

    o

    Celebrate:Cultural destinations ofdistinct character.

    o Live:Building strong waterfront

    neighborhoods.

    Creating a World-Class Waterfront

  • 8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014

    3/20

    3

    AWI Transportation Master Plan

    2014 Update

    Continuous Pedestrian and Bicycle Access AlongWaterfront

    Modal Shift to Public Transit

    Great Urban Boulevards with Mixed Uses,

    Landscaping and Great Civic Spaces

    Redesign Bridges in the Tradition of Great Civic

    Architecture

    Reduce Highway and Freeway Barriers Between

    Neighborhoods and Waterfront Parks

    Reconnect the City Street Grid to Waterfront

    Parks

    Support and Foster Economic Development

  • 8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014

    4/20

    4

    AWI Program Transportation Projects

  • 8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014

    5/20

    5

    Anacostia Riverwalk Trail

    Backbone of Anacostia

    Waterfront

    15 of 28 Planned Miles of

    Trail Open

    From Tidal Basin with

    Northeast and Southeast

    Borders with Maryland

    Seamless Pedestrian and

    Bicycle Travel Between

    Popular Destinations and

    16 Neighborhoods $33 Million of Anticipated

    $50 Million Invested to

    Date

  • 8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014

    6/20

    6

    Anacostia Riverwalk Trail

    Kenilworth Aquatic Gardens Segment

    Better Connect 16Communities, the River

    and Recreational Sites

    Increase Transit Station

    Accessibility

    Make Bicycle Commuting

    More Attractive

    Provide Link Between

    Benning Road andBladensburg Waterfront

    Park in Larger 70-mile

    Regional Trail Network

  • 8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014

    7/207

    11th Street Bridge Project

    Increase Mobility Via Separate

    Freeway and Local TrafficConnections

    Provide a Shared-Use Path forPedestrians and Bicyclists

    Replace Functionally Deficient,

    Structurally Obsolete Bridges

    Provide Additional Alternate

    Evacuation Route

    Include New Trail Connections,

    Improved Drainage and OtherEnvironmental Investments

  • 8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014

    8/208

    Frederick Douglass Memorial Bridge 63-years-old, End of Useful

    Life

    Replacement Due to:

    oAge and Condition,

    o Functional Limitations, and

    o

    Importance to theDistricts Transportation

    Network and Plans

    Deterioration Requires

    Repairs with Increasing

    Frequency, Cost and Traffic

    Impacts

  • 8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014

    9/209

    South Capitol Street Corridor Project

    Creating a GrandUrban Boulevard

  • 8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014

    10/2010

    Traffic Oval West of Bridge

    West

    Oval

    Potomac

    Avenue, SE

    New Frederick

    Douglass Memorial

    Bridge

    Half Street,

    SW

    Q Street, SW

    R Street, SW Potomac

    Avenue, SW

    South Capitol

    Street

    Nationals

    Ballpark

  • 8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014

    11/2011

    New Frederick Douglass

    Memorial Bridge

  • 8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014

    12/2012

    East Oval and I-295 Interchange

    East Oval

    Suitland

    Parkway

    South Capitol

    Street

    New Frederick

    Douglass MemorialBridge

    Anacostia

    Drive

    I-295

    Howard

    Road

    Joint Base

    Anacostia Bolling

    DC Water

    Pump House

    Poplar

    Point

  • 8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014

    13/2013

    South Capitol Street Trail Provide Bicycle/Pedestrian

    Access on South Capitol

    Street/Overlook AvenueCorridor

    Increase Multi-modal

    Connectivity for

    Communities, Military Basesand Recreational Destinations

    Provide Link south fromDistricts Anacostia

    Riverwalk Trail toMarylands Oxon Run Trail and

    Woodrow Wilson Bridge

    Connection with Virginia

  • 8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014

    14/2014

    Parkside Pedestrian Bridge

    Better Connect

    Neighborhoods on Each

    Side of DC 295

    Provide new access to

    Minnesota Avenue Metro

    Station.

    Make bridge safe, well-lit

    and disabilities-accessible

  • 8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014

    15/2015

    M Street SE/SW Transportation Study

    Completed in 2013

    Special Events Study completed in

    2014

    EA now underway by DDOT

  • 8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014

    16/2016

    Malcolm X/Interstate 295 Interchange

    New Access to Southbound

    I-295 from St. Elizabeths

    Campus

    Design to Start in 2013

  • 8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014

    17/20

    17

    Barney Circle Southeast Boulevard

    Transportation Study

    Transform Southeast Freewayinto a Boulevard Integrated with

    Neighborhoods Between 11th

    Street Bridge and Barney Circle

    Reconstruct Barney Circle to

    Accommodate Vehicle TurningMovements and Multi-modal

    Access

    Improve Pedestrian and Bicyclist

    Connections to Anacostia River

    Evaluate Design Options that

    Consider Multi-modal

    Transportation Uses

    John Philip

    Sousa Bridge

    Pennsylvania Avenue

    L Street SE

    Southeast Boulevard

    17

  • 8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014

    18/20

    18

    Pennsylvania-Potomac Avenue SE

    Pedestrian Safety Study

    Enhance Safety and Multi-modal Connections

    Direct Pedestrian Paths

    across Pennsylvania

    Avenue SE

    Reduce Pedestrian

    Crossings to Potomac

    Avenue Metro Station

    Improve Intersection

    Connection to AnacostiaWaterfront areas

    Improve Public Space

    Aesthetics

    Pennsylvania

    Avenue SE

    PotomacAvenue SE

    14th Street SE

    Potomac Avenue

    Metro Station

  • 8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014

    19/20

    19

    More Information

    For more information, visit

    www.anacostiawaterfront.org

    To receive project updates,

    ask questions or comment:

    o

    Sign up for the projectemail list

    o Email: [email protected]

    o

    Call: 202-741-8528

  • 8/11/2019 AWI Overview Presentation: DCPL - August 24, 2014

    20/20

    20

    QUESTIONS