Awareness Workshop on “Integrated Water Resources

36
Awareness Workshop on “Integrated Water Resources Management Applications developed under Hydrology Project-II” January 29, 2014 By Central Water Commission Hydrological Design Aids (Surface Water)

description

Awareness Workshop on “Integrated Water Resources Management Applications developed under Hydrology Project-II”. Hydrological Design Aids (Surface Water). January 29, 2014. By Central Water Commission. Objectives of HDA-SW. - PowerPoint PPT Presentation

Transcript of Awareness Workshop on “Integrated Water Resources

Page 1: Awareness Workshop on  “Integrated Water Resources

Awareness Workshopon

“Integrated Water ResourcesManagement Applications developed under

Hydrology Project-II”

January 29, 2014

By Central Water Commission

Hydrological Design Aids (Surface Water)

Page 2: Awareness Workshop on  “Integrated Water Resources

Objectives of HDA-SW

• Main objective of development of HDA (SW) is to standardize Hydrological Design Practices in the form of design aids for uniform use, all over the country, using state of the Art technology to the extent possible.

• Aims at consolidating various design practices/tools for different design parameters

Page 3: Awareness Workshop on  “Integrated Water Resources

Components of HDAAs required in hydrological study of any project, the HDA includes following three modules:

HDA-Y: Assessment of Water Resource Potential-Availability/Yield Assessment

HDA-F: Estimation of Design Flood HDA- S: Sedimentation rate estimation

Apart from various analytical tools, the project also includes preparation of reference manuals and design aids to produce the hydrology chapter of the DPR as per standard guidelines of MoWR

Page 4: Awareness Workshop on  “Integrated Water Resources

HDA Framework

Models

database

Design Aids/ Guidelines

Assess Hydrological Design parameters and produce DPR Hydrology Chapter

Page 5: Awareness Workshop on  “Integrated Water Resources

HDA Software–ArchitectureData Layer

Manages the physical storage and retrieval of data Relational tables Stored Procedures Triggers Indexes for faster data access DB configuration for faster data processing Storage of spatial and textual data Data Export DB backup & restore

Data type in HDA

Regular Series data Irregular series data Paired data Physical parameters Spatial data

Windows Forms (Code Behind)

Windows Forms (UI)

Page 6: Awareness Workshop on  “Integrated Water Resources

HDA Software–Architecture Business Layer

Maintains business rules and logic Business process logic Contains Global functionsProvides process and user input validations Maintains in-between processed data as temporary data file Error / Warning handling

Example Base flow separation - Constant Baseflow Method - Straight Line Method - Recession Baseflow MethodEffective Rainfall Hyteograph (ERH) Watershed Delineation using MapWindow

Windows Forms (Code Behind)

Windows Forms (UI)

Page 7: Awareness Workshop on  “Integrated Water Resources

HDA Software–Architecture Presentation Layer

Houses the user interface and related presentation codeOperation friendly user interfaces Validation of user inputs Ease of navigation Interactive graphs with data Standard buttons Standard messages Supporting operations help Standard icons for individual processes

Example User navigation buttons with icons Data in grid Interactive Unit Hydrograph Data modification facility Delineated Watershed in embedded MapWindow Reports

Windows Forms (Code Behind)

Windows Forms (UI)

• Lets proceed with the HDA software

Page 8: Awareness Workshop on  “Integrated Water Resources

HDA Software

Page 9: Awareness Workshop on  “Integrated Water Resources

HDA Software – Project Details

All the key information of the project should be entered in the dialog.

Some of the key input fields are:• River/Tributary name• State/District• Type and purpose of the project• Geographical information• Catchment area (entered manually or

by automatic delineation)

Page 10: Awareness Workshop on  “Integrated Water Resources

HDA – Watershed Delineation

Page 11: Awareness Workshop on  “Integrated Water Resources

HDA Software – Stations

All the key information of the station should be entered in the dialog.

Some of the key input fields are:• Station name• Catchment area• Geographical information• Parameter type• Units• Time frequency• Data type

Page 12: Awareness Workshop on  “Integrated Water Resources

HDA Software – Stations Data Entry

Page 13: Awareness Workshop on  “Integrated Water Resources

HDA Software – HDA-F( Design Flood)All Commonly used functionalities have been provided:

• Hydro meteorological Approach• Statistical Approach• Peak Flood Estimation

Page 14: Awareness Workshop on  “Integrated Water Resources

HDA Software – UH Gauged Catchment – ER Hyetograph

Effective Rainfall Hyetograph methods:

• Constant loss method• W index/Phi index method

Page 15: Awareness Workshop on  “Integrated Water Resources

HDA Software – UH Gauged Catchment – Unit Hydrograph

Effective Unit Hydrograph methods:• Nash method• Collin’s method• Clark’s method• Calibration process• S-curve transformation• Averaging of unit hydrograph• Project site UH

Page 16: Awareness Workshop on  “Integrated Water Resources

HDA Software – UH Ungauged Catchment – FER Method

Flood Estimation Report (FER) method:

• SUG parameters and UG Ordinates

• Smoothening of UG ordinates and graph

Page 17: Awareness Workshop on  “Integrated Water Resources

HDA Software – UH Ungauged Catchment – GIUH Method

Geomorphological Instantaneous Unit Hydrograph (GIUH) method:

• Click on menu item• Select outlet point from dropdown and

click “Calculate Morphological Parameters”

• Go to “GIUH” tab• Define/calculate velocity• Click “Generate GIUH”

Page 18: Awareness Workshop on  “Integrated Water Resources

HDA – Storm Analysis

Steps to perform:• Click on Storm Analysis from

HDA menu.• Add relevant shape files to the

opened ArcGIS environment.• Click on “Storm Analysis”.• Click on “Generate Isohyets”• Click on “Clipped Isohyets”• Click on “DAD Preparation”• Go to “Envelope Curve” tab.• Go to “PMP” tab.• Click on “Apply Correction

Factor”.• Storm is not Transposed• Storm is Transposed• Go to “Rainfall Distribution

Estimation” tab.

Page 19: Awareness Workshop on  “Integrated Water Resources
Page 20: Awareness Workshop on  “Integrated Water Resources

HDA Software – Peak Flood Estimation

Peak Flood Estimation methods:• Empirical formulae

• Dickens• Ryves• Inglis• Nawab Jung Bahadur• W. P. Creagers• Jarvi’s• Myer’s• Dredge and Burge’s• Pettis• Etc.

• Rational method• Calculate Tc• Rainfall Intensity – FER• Rainfall Intensity – Rambabu and

other• Rainfall Intensity – Raudkivi

equation• Rainfall intensity– User-defined• Rainfall intensity – Generate IDF• Calculate Peak Discharge

Page 21: Awareness Workshop on  “Integrated Water Resources
Page 22: Awareness Workshop on  “Integrated Water Resources
Page 23: Awareness Workshop on  “Integrated Water Resources

Data CorrectionData Validation

Zonal MapSedimentation Rate using Observed DataRegional ModelSWAT

Trap EfficiencySediment Quantum Calculation

Empirical Area Reduction MethodHEC-RAS

HDA-S Design AidHDA-S User Manual

Page 24: Awareness Workshop on  “Integrated Water Resources
Page 25: Awareness Workshop on  “Integrated Water Resources
Page 26: Awareness Workshop on  “Integrated Water Resources
Page 27: Awareness Workshop on  “Integrated Water Resources
Page 28: Awareness Workshop on  “Integrated Water Resources
Page 29: Awareness Workshop on  “Integrated Water Resources
Page 30: Awareness Workshop on  “Integrated Water Resources

REPORT

GENERATION

WRAP-HYD

Flow Flow Naturalization Naturalization

FNM

Basin Basin SimulationSimulationWRAP-SIM

Q

Snowmelt Simulation

Time Series Time Series Simulation Simulation

MWSWAT Model E REGM PROM

Rainfall – Runoff Rainfall – Runoff SimulationSimulation

Software Configuration : HDA-1

MWSWAT

WINSRM

ProcessedProcessed Data Data

TSM

InterfaceWith

eSWISArcGISHYMOSRIBASIMMIKE11MIKEBASIN

HDA-Y ( Water Availability )

Page 31: Awareness Workshop on  “Integrated Water Resources

Primary validation Screening and Graphical inspection

Fill-in missing data and Data Correction

Homogeneity Test

Stage -Discharge Relation

Data Compilation and Report Generation

Evapo-transpiration Estimation

Statistical Analysis

Data Validation

Secondary validation

Page 32: Awareness Workshop on  “Integrated Water Resources

The Regional Models four river systems for water availability are also being developed as part of TOR

North- Satluj River basinNorth East- Lohit and Barak basinsSouth- Godavari River BasinWest- West Coast ( Damanaganga and and Kannadipuzha) and Tapi River basinObjectiveDevelop relationships to enable computation of monthly yield series for Monsoon season for an ungauged sub-basin using data on climatic parameters, catchment Characteristic, Land use etc.

Status – Work of Tapi basin and Damanganga has been completed and work of Godavari basin is in progress

Regional study : HDA-Y

Page 33: Awareness Workshop on  “Integrated Water Resources
Page 34: Awareness Workshop on  “Integrated Water Resources

Empirical Relations

• Developed empirical equations for the formed clusters were both, month-wise and monsoon season relate the dependent variable discharge (Qsim) with the independent variables namely

Precipitation (PCPM), Temperature(TEMPM), Relief (RL), “% Crop Area (%CA), “% Forest

Area (%FA) and Unit Area of the sub basin (UA).Qsim= 0.739×(PCPM) + 19.686×(TEMPM) +

0.041×(UA) - 0.089×(RL) + 1.28×(%CA) -1085.98

Correlation coefficient (R) : 0.94

Page 35: Awareness Workshop on  “Integrated Water Resources

Concluding

This project will help in consolidating various design practices/tools for different design parameters

Will infuse standardization in the process of hydrological design parameters estimation and preparation of Hydrology chapter of DPR

Will help in reducing time period for assessment of parameters and their appraisal

Creating data basesTraining to State Engineers

Page 36: Awareness Workshop on  “Integrated Water Resources