    2/28

    Introduction

    Rain Water Harve RWH means storing Rain

    artificial / manmade reser

    OR

    In natural reservoirs suchit as and when we need it

    In short RWH is storing Rabove ground or bellow gsource of water

    stingater in

    oir ( tank )

    as Pond, aquifer and usingas a source of water

    in water either in tankound and using it as a

  • 8/9/2019 Awareness and Procedure for Rwh

    3/28

    Following are the object1) To use it as a source

    (i) Drinking purpose

    (ii) Non potable purp

    gardening , car washi(iii) To store it and us

    agriculture purpose.

    2) To recharge open welreplenish the water us

    ves of R.W.Hof water

    se such as flushing,

    g ect.e it for Horticulture and

    l & bore well so as tod during entire year

  • 8/9/2019 Awareness and Procedure for Rwh

    4/28

    3) To store it in pond, lake f/ aquifer or for to use it af

    4) To control salt water intru

    well along coastal area.

    5) To recharge subsoil / aquilevel flooding is reduced ocities.

    6) To improve quality of wat

    r either recharge of subsoiler monsoon

    ion in pond,lake,well,bore

    er in cities so that localr arrested particularly in

    r.

  • 8/9/2019 Awareness and Procedure for Rwh

    5/28

    Potential Of Rain Wat Assuming annual average Rain

    Each 1000 sqm of land will yiel

    or 10,00,000 liters of water.( o

    1000 cu.m is sufficient for 20 p

    1000 cum is sufficient of aboutflushing purpose at 40 lpcd

    Assuming Cost of water supplieloosing at Rs 20 per sqm of lanevery year.

    e

    rfall as a 1000mm (1m)

    1000 cum

    e million liter )

    rsons for entire year at 135 lpcd

    70 person for entire year for

    d as 20 per cum We will beor 20000per 1000 sqm of land

  • 8/9/2019 Awareness and Procedure for Rwh

    6/28

    Importance of Rain Wa In a city normally tap and or b

    water.

    Very few people are considerin

    Since Rain water has huge potewater as a 1st source of water a

    er Harvestingre well water is a source of

    Rain water as a source of water

    ntial we should consider Rainnd then go for other sources.

  • 8/9/2019 Awareness and Procedure for Rwh

    7/28

    Quantification of

    Rain Water Harvestin

    (i) Roof top (Terrace )of Building / (ii) Open portion of plot

    Roof top area can be calculated fro

    of Roof top Rain water is possible

    If we know Rate of Infiltration then

    Ifintake capacity of bore wellis kn

    quantity of water used for recharge

    R.W.U.I. = Rain water Useddurin

    Total Rain fallduring y

    Buildings and

    bldgdrawing Hence quantification

    recharge quantity can be calculated

    w to us then we can calculate

    of bore well

    year

    ar

  • 8/9/2019 Awareness and Procedure for Rwh

    8/28

    Procedure for Roof top

    collection Calculate the Available roof top

    Annual average Rainfall & No o

    Daily requirement of water forGardening, Car washing etc.

    Position of Rain Water down ta

    (Terrace ) Rainwater

    or terrace area

    Rainy days

    on potable use such as flushing ,

    e pipes.

  • 8/9/2019 Awareness and Procedure for Rwh

    9/28

    Use of Rainwater

    for NonP

    otableP

    urp

    (1) Jamanabai Narsi school at Juh

    Roof Top area = 8,00 sqm

    Daily requirement = 40,000 liter

    Rain water Storage tank capacit

    This storage capacity is sufficien

    sufficient for 2 day flushing w

    Total Rainwater available for use

    = 1,120 cum

    se

    Mumbai

    provided = 1,00,000

    to collect 120mm of rain fall & is

    ter requirement.

    8,00 X 2 X0.70

  • 8/9/2019 Awareness and Procedure for Rwh

    10/28

    (2) 10th Kheth wadi MumbaiRoof Top 110 sqmTotal Flats 54 Daily flushing

    Rain water Storage tank capaThis storage capacity is sufficisufficient for one day.

    Total Rain water available 110 X 2

    CIPLA LTD. Vikoril (West ) MumbaiRoof top 1170 sq mtFlushing water requirementRain water Storage tank cap

    This storage capacity sufficient tosufficient of 2 days, Total Ra

    1,170 X 2 X 0.70 = 1,638 cu.m

    ater Requirement 10,800 liter

    city10

    ,000

    litersent to collect 90 mm Rainfall & is

    X 0.70 = 154 cu.m

    5,000 literscity 2,00,000 literstore 170mm Rainfall & isin Water available

  • 8/9/2019 Awareness and Procedure for Rwh

    11/28

    Capacity o

    Rain WaterHence capacity of Rainwater

    either 5 times flushing dailrequirement

    O

    capacity should be sufficientover Roof top.

    ( Minimum tank capacity shto accommodate one tank

    Roof Top

    torage Tanktorage tank should be(non potable) water

    o collect 100 mm Rainfall

    uld be 10,000 liters so asr of water )

  • 8/9/2019 Awareness and Procedure for Rwh

    12/28

    FILTERS

    By using 100 micron Geo te

    Uni tech filter having v wir

    Rainy Filters( F.R.H. system

    Jonsan V wire filter

    tile

    technology

    Banglore )

  • 8/9/2019 Awareness and Procedure for Rwh

    13/28

    On LineF

    ilters

  • 8/9/2019 Awareness and Procedure for Rwh

    14/28

    Recharge of Subso For Rain fall over open portion

    available for R W H (i) Recharge of subsoil (ii) Recharge ofAquifer (iii) Recharge of bore well For recharge of subsoil we will

    Trial Pit Methods

    Double Ring Infiltro meter

    For recharge ofAquifer we willpermeability test

    For recharge of bore well we wi

    il Groundwaterf plot following options are

    ave to carry out infiltration test

    ave to carry out packer

    ll have to carry out pumping test

  • 8/9/2019 Awareness and Procedure for Rwh

    15/28

    Recharge of Subsoil

    Infiltration TestTRIAL PIT METHOD The percolation rate is observe

    constructing a trial pit of size 1 The pit is filled with locally avai

    necessary to stimulate the sam

    occur during rainy seasons. Hence percolation rate is obser

    a long monsoon rains say two t After 2 or 3 days of rains the s

    saturated, and the percolationrealistic, than one observed du

    This observed rate is a reasonaof pits required to percolate , awater is collected.

    at site by developing /.2m x 1.2m x 1.5m.

    lable graded material. Here It isphysical condition which may

    ed during a small dry spell afterthree days or more.

    b soil will be sufficientlyate observed will be moreing pre monsoon period,le basis to calculate the numberter knowing the area from which

  • 8/9/2019 Awareness and Procedure for Rwh

    16/28

    Recharge of Subsoil

    Infiltration TestDouble Ring Infiltro meter It is a another simple method f

    soil.( flow rate of water into grconcentric ring with outer ringring having dia of15 cm . (or o

    Height of each Ring is 30 cm Tto soil ( say 10 cm inside the son their own

    First outer ring is filled up withup with water The water level imanually or with instruments tiobserved. This steady rate will ithat soil.

    r finding out permeability ofund ) Instrument consist of 2having dia of30 can and inneruter 60 cm & Inner 30 cm )e two rings are driven partially inil ) so that rings stands vertically

    water and then Inner ring is filledn both ring is maintained eitherll steady downward rate is

    ndicate the Infiltration rate of

  • 8/9/2019 Awareness and Procedure for Rwh

    17/28

    Options to recharge Percolation pit

    Percolation pit with bo

    Percolation pit along Percolation pit with bo

    subsoil

    re

    WD

    re along with SWD

  • 8/9/2019 Awareness and Procedure for Rwh

    18/28

    DEATILS OF

    1) PERCOLATION PIT 2) PERC

    3) SWD WITH PIT 4) SWD

    LATION PIT WITH BORE

    ITH BORE

  • 8/9/2019 Awareness and Procedure for Rwh

    19/28

    Recharge of Bore well

    ( Pumping Test ) Water is pumped out from bore

    pumping rate.

    While pumping water level is re

    minute till we stop pumping

    After we stop pumping water leminute till it attains original lev

    From above data we can calcul

    well for 2 to 3 hours with known

    corded from start every 15

    vel is again recorded every 15l

    te in take capacity of bore well.

  • 8/9/2019 Awareness and Procedure for Rwh

    20/28

    photo

  • 8/9/2019 Awareness and Procedure for Rwh

    21/28

  • 8/9/2019 Awareness and Procedure for Rwh

    22/28

    Quality of water use

    ( Artificial re Roof top ( Terrace ) water

    recharge after proper careflush & filter arrangement.

    Run off water contains orpesticide residue and disssource of contamination.

    Hence quality of water shof Drinking water.

    d for well recharge

    harge )to be used for directsuch as system having first

    anic matter, fecal matter,lved fertilizer are potential

    uld be comparable to that

  • 8/9/2019 Awareness and Procedure for Rwh

    23/28

    Natural In case of natural recharg

    surface runoff it passes thcover, before it reaches thwater recharge takes advability for biodegradationproviding in situ treatmencover acts as a purifier.

    echargeof aquifer by Rainfall &

    rough certain depth of soile aquifer. Here groundntage of subsoils naturalnd filtration, there byof surface runoff. This soil

  • 8/9/2019 Awareness and Procedure for Rwh

    24/28

    Hence following methods

    i) A farm pond ( 10m X 6

    from open well or bore well

    ii) Circular trench aroundof 2m away & filled up wi

    re used

    X 3m ) at a distance of 2m

    ore well or well at distanceh graded material.

  • 8/9/2019 Awareness and Procedure for Rwh

    25/28

    Utilization of Surfac For Rain Water Harvesting of s

    area more the 10000 sq.m., pr

    m average depth. Then pond

    3= 1500 cu.m.

    Helps in reducing flooding of ad

    At S.H. Kelkar & Co. At their fa

    We have developed pond havin

    depth, to collect part surface ru

    ( 88000 sq m ). The capacity o

    e Runoffrface Runoff in layout having

    vide pond having 5% area and 3

    ill have capacity to store 500x

    joining road

    tory at panvel:

    50 m dia and 3 m average

    noff from 22 Area of land

    Tank. is 5891.25 cu.m.

  • 8/9/2019 Awareness and Procedure for Rwh

    26/28

    POND AT PANV L

  • 8/9/2019 Awareness and Procedure for Rwh

    27/28

    Operation and Main

    Specialinstructions to be give

    occupants to keep the terrace

    be allowed by society to its me

    Filter to be used as per instruc

    Necessary precautions to be ta

    Simple periodic chlorination or

    for disinfectionis to carried ou

    Filter media and nylon net sh

    obtain proper result.

    Water shouldnot be allowed t

    percolation pit.

    Drain the R.W.H tank complete

    thoroughly before every mo

    tenance Guidelines

    to the members of society /

    f Bldg clean( Terrace shouldnot

    mber to any family function)

    ions of manufacturer

    ken to avoid mosquito breeding.

    use oflime in the flushing tank

    .

    uld be cleaned periodically to

    stagnate in the collection or

    ly and clean from inside

    nsoon.

  • 8/9/2019 Awareness and Procedure for Rwh

    28/28

    I Think with this we casubstantial RWH

    TH

    n defiantly achieve

    NKS