AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ISLAND / GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STATUS POTENTIAL CAPACITY (MW) INSTALLED CAPACITY (MW) Luzon CAR Benguet Ambuklao Ambuklao SN Aboitiz Power - Benguet, Inc. Compliant With: Work Plan RESHERR 104.55 Bakun Lon-oy HEDCOR, Inc. Non-Compliant With: RESHERR 3.60 F. L. Singit HEDCOR, Inc. Non-Compliant With: RESHERR 5.90 Lower Labay HEDCOR, Inc. Non-Compliant With: RESHERR 2.40 Bakun & Mankayan Mankayan 1 HEDCOR, Inc. Non-Compliant With: RESHERR 12.70 Bokod & Kabayan Kabayan 3 (Kabayan - Bokod) Hedcor Benguet, Inc. Non-Compliant With: Work Program Posting of performance bond RESHERR 27.00 Buguias Man-asok Benguet Electric Cooperative, Inc. Compliant With: Work Plan Non-Compliant With: Posting of performance bond RESHERR 3.00 Buguias & Kabayan Kabayan 1 Hedcor Benguet, Inc. Compliant With: Work Program Posting of performance bond RESHERR 20.00 Itogon San Roque Upper East Pump Storage Strategic Power Development Corp. Compliant With: Work Program Posting of performance bond RESHERR 600.00 San Roque West Pump Storage Strategic Power Development Corp. Compliant With: Work Plan Posting of performance bond RESHERR 400.00 Sal-angan HEDCOR, Inc. Non-Compliant With: RESHERR 2.40 Binga SN Aboitiz Power - Benguet, Inc. Compliant With: Work Plan RESHERR 140.00

Transcript of AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of...

Page 1: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Luzon CAR Benguet Ambuklao Ambuklao SN Aboitiz Power - Benguet, Inc.

Compliant With:

Work Plan

RESHERR

104.55

Bakun Lon-oy HEDCOR, Inc.Non-Compliant With:

RESHERR3.60

F. L. Singit HEDCOR, Inc.Non-Compliant With:

RESHERR5.90

Lower Labay HEDCOR, Inc.Non-Compliant With:

RESHERR2.40

Bakun &

MankayanMankayan 1 HEDCOR, Inc.

Non-Compliant With:

RESHERR12.70

Bokod &

Kabayan

Kabayan 3 (Kabayan -

Bokod)Hedcor Benguet, Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

27.00

Buguias Man-asok Benguet Electric Cooperative, Inc.

Compliant With:

Work Plan

Non-Compliant With:

Posting of performance bond

RESHERR

3.00

Buguias &

KabayanKabayan 1 Hedcor Benguet, Inc.

Compliant With:

Work Program

Posting of performance bond

RESHERR

20.00

ItogonSan Roque Upper East

Pump StorageStrategic Power Development Corp.

Compliant With:

Work Program

Posting of performance bond

RESHERR

600.00

San Roque West Pump

StorageStrategic Power Development Corp.

Compliant With:

Work Plan

Posting of performance bond

RESHERR

400.00

Sal-angan HEDCOR, Inc.Non-Compliant With:

RESHERR2.40

Binga SN Aboitiz Power - Benguet, Inc.

Compliant With:

Work Plan

RESHERR

140.00

Page 2: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

ItogonSan Roque Lower East

Pumped-StorageStrategic Power Development Corp.

Compliant With:

Work Program

Posting of performance bond

RESHERR

400.00

Kabayan Kabayan 2 (Nalatang) HEDCOR, Inc.

Compliant With:

Work Plan

Non-Compliant With:

Posting of performance bond

RESHERR

45.00

Kabayan Eddet Adaoay 1 United Hydro Power Builders

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

1.00

Eddet Adaoay 2 United Hydro Power Builders

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

1.80

Kapangan and

KibunganKapangan

Cordillera Hydro Electric Power

Corporation

Compliant With:

Posting of performance bond

RESHERR

Non-Compliant With:

Work Plan

60.00

Kibungan Kibungan Kibungan Hydropower Corporation

Compliant With:

Work Program Posting

of performance bond

Non-Compliant With:

RESHERR

1,000.00

Kibungan Pumped-Storage Coheco Badeo Corporation

Compliant With:

Posting of performance bond

Non-Compliant With:

RESHERR

500.00

La Trinidad Bineng 1-2B Combination HEDCOR, Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

19.00

Bineng 3 HEDCOR, Inc.Non-Compliant With:

RESHERR4.50

Page 3: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Sablan Ampohaw HEDCOR, Inc.Non-Compliant With:

RESHERR8.00

Tuba Abdao 1 AV Garcia Power Systems Corp.

Compliant With:

RESHERR

Non-Compliant With:

Work Plan

Posting of performance bond

2.00

Irisan 1 HEDCOR, Inc.

Compliant With:

Work Plan

RESHERR 3.80

Tadiangan Goldlink Global Energy Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

4.70

Kanggas Goldlink Global Energy Corporation Non-Compliant With:

Performance Bond; Work Plan; RESHERR

3.00

Irisan 3 HEDCOR, Inc.

Compliant With:

Work Plan

RESHERR 1.20

Tublay Tublay 2 AT Dinum Company

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

6.00

Tublay 3 AT Dinum Company

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

1.00

Page 4: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

BenguetTublay & La

TrinidadTublay 1 AT Dinum Company

Compliant With:

Posting of performance bond

Non-Compliant With:

Work Program

RESHERR

0.90

Ifugao Alfonso Lista Maris Main Canal 2 SN Aboitiz Power - Greenfield, Inc.

Compliant With:

Work Program

RESHERR

Non-Compliant With:

Posting of performance bond

1.75

Asipulo &

KianganLikud Provincial Government of Ifugao

Non-Compliant With:

RESHERR0.82

Ilagan Olilicon SN Aboitiz Power - Ifugao, Inc.

Non-Compliant With:

Work Program

'Posting of performance bond

10.00

Kiangan Ambangal Provincial Government of Ifugao

Non-Compliant With:

RESHERR

0.20

Asin Kiangan Mini Hydro Corporation

Compliant With:

Work Plan

Posting of performance bond

Non-Compliant With:

RESHERR

4.00

Hungduan Kiangan Mini Hydro Corporation

Compliant With:

Work Plan

Posting of performance bond

Non-Compliant With:

RESHERR

4.00

Ibulao 2 Enerhighlands Corporation

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

8.80

Page 5: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Ifugao Kiangan Ibulao 1 Kiangan Mini Hydro Corporation

Compliant With:

Work Plan

Posting of performance bond

Non-Compliant With:

RESHERR

6.00

Lagawe Ibulao Hydrocore, Inc.

Compliant With:

Posting of performance bond

RESHERR

Non-Compliant With:

Work Plan

4.50

Alimit SN Aboitiz Power - Ifugao, Inc.

Compliant With:

Work Program

RESHERR

Non-Compliant With:

Posting of performance bond

100.00

Lagawe &

MayoyaoAlimit-Pumped Storage SN Aboitiz Power - Ifugao, Inc. Non-Compliant With:

Posting of performance bond

240.00

Lamut Lamut Enerhighlands Corporation

Compliant With:

Work Plan

Posting of performance bond

Non-Compliant With:

RESHERR

9.00

Tinoc Tinoc 4 Philnew Hydro Power Corp

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

6.00

Tinoc 1 Quadriver Energy Corporation

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

3.00

Tinoc 2 Quadriver Energy Corporation

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

6.50

Page 6: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Ifugao Tinoc Tinoc 3 Quadriver Energy Corporation

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

5.00

Tinoc 6 (Wangwang) Philnewriver Power Corp.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

8.00

Tinoc 5 (Lower Luhong) Philnewriver Power Corp.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

6.90

Kalinga ChicoSan Lorenzo Ruiz Builders &

Developers Group, Inc.

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

150.00

Balbalan Biyao Biyao Hydro Power Corporation

Non-Compliant With:

Posting of performance bond

RESHERR

0.80

Pasil Pasil BI-Magat Renewable Energy

Corporation

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

14.00

Pasil CI-Magat Renewable Energy

Corporation

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

11.00

Tabuk Bulanao DPJ Engineers and Consultants Non-Compliant With:

RESHERR

1.00

Page 7: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Kalinga Tabuk Chico RiverSan Lorenzo Ruiz Builders &

Developers Group, Inc.

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

45.00

Tinglayan Tinglayan Pan Pacific Renewable Power

Philippine Corp.

Compliant With:

RESHERR

Non-Compliant With:

Work Program

Posting of performance bond

4.32

ApayaoCabarroguis &

NagtipunanGened 1

Pan Pacific Renewable Power Phils.

Corp.

Compliant With:

Work Prgram

Posting of performance bond

Non-Compliant With:

RESHERR

150.00

Conner Nabuangan River Strategic Power Development Corp.

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

10.00

Abra Lagayan Tineg Sta. Clara Power Corp.Non-Compliant With:

RESHERR16.00

Manabo Three Rivers Sta. Clara Power Corp.Non-Compliant With:

RESHERR10.00

Tineg & Lagayan Binongan-TinegFirst Gen Mindanao Hydro Power

Corp.

Non-Compliant With:

RESHERR175.00

Tubo Amtuagan Sta. Clara Power Corp.

Non-Compliant With:

Posting of performance bond

RESHERR

8.50

Page 8: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Abra Tubo Gayaman (Tubo) Sta. Clara Power Corp.

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

8.50

Benguet &

Ilocos Sur

Bakun &

CervantesMankayan 2 HEDCOR, Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

20.30

Mt. Province Bauko Enodey-Abit 1 Kadipo Bauko Hydropower Corp.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

2.00

Enodey-Abit 2 Kadipo Bauko Hydropower Corp.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

1.20

Enodey-Abit 3 Kadipo Bauko Hydropower Corp.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

2.00

Ampassit Kadipo Bauko Hydro Power Corp.

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

1.20

Enodey 1A Kadipo Bauko Hydro Power Corp.

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

1.80

Page 9: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Mt. Province Bauko Boga Kadipo Bauko Hydro Power Corp.

Compliant With:

Posting of performance bond

Non-Compliant With:

Work Program

RESHERR

1.00

Upper Chico Kadipo Bauko Hydro Power Corp.

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

2.10

Lower Chico Kadipo Bauko Hydro Power Corp.

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

3.40

Besao Besao 1

BIMAKA Renewable Energy

Development Corporation

(BREDCO)

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

5.00

Besao 2

BIMAKA Renewable Energy

Development Corporation

(BREDCO)

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

7.00

Besao 3

BIMAKA Renewable Energy

Development Corporation

(BREDCO)

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

4.50

Besao 1A

BIMAKA Renewable Energy

Development Corporation

(BREDCO)

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

2.60

Page 10: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

CAR Mt. Province Besao Besao 1B

BIMAKA Renewable Energy

Development Corporation

(BREDCO)

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

1.70

Besao 2A

BIMAKA Renewable Energy

Development Corporation

(BREDCO)

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

1.50

Bontoc TalubinMountain Province Electric

Cooperative, Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

5.40

Natonin Lower Siffu Asiapac Green Renewable Energy

Corporation

Compliant With:

Work Program

Posting of performance bond

RESHERR

8.00

Upper Siffu Asiapac Green Renewable Energy

Corporation

Compliant With:

Work Program

Posting of performance bond

RESHERR

8.00

Sabangan Sabangan Hedcor Sabangan, Inc.

Compliant With:

Work Plan

RESHERR 14.00

Tadian DicapanAsiapac Green Renewable Energy

Corporation

Compliant With:

Work Program

Posting of performance bond

RESHERR

3.00

I Ilocos Sur Alilem Bakun AC Luzon Hydro Corporation

Compliant With:

Work Plan

RESHERR

70.00

Page 11: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

I Ilocos Sur Alilem Alilem HEP Philnewriver Power Corp.

Compliant With:

Work Plan

Non-Compliant With:

Posting of performance bond

RESHERR

16.20

Quirino Quirino HEP Philnewriver Power Corp.

Compliant With:

RESHERR

Non-Compliant With:

Performance Bond

11.50

San Emilio Matibuey Sta. Clara Power Corp.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

16.00

Sigay & Suyo Sigay 2 Markham Resources Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

10.00

Sugpon Danac HEP Philnewriver Power Corp.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

3.00

Suyo Suyo 2 Satrap Power Corporation

Compliant With:

'Work Program

Non-Compliant With:

RESHERR

3.00

La Union Bagulin Baroro 2Team (Philippines) Renewable

Energy Corporation

Compliant With:

RESHERR

Non-Compliant With:

Work Program

Posting of performance bond

3.00

Baroro 3Team (Philippines) Renewable

Energy Corporation

Compliant With:

RESHERR

Non-Compliant With:

Work Program

Posting of performance bond

1.50

Page 12: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

I La Union Bagulin Baroro 1Team (Philippines) Renewable

Energy Corporation

Compliant With:

RESHERR

Non-Compliant With:

Work Program

Posting of performance bond

1.00

Naguilian NaguilianNaguilian Mini-Hydro Electric

Corporation

Compliant With:

Posting of performance bond

Non-Compliant With:

Work Plan

RESHERR

6.10

Tubao TubaoTubao Mini Hydro-Electric

Corporation

Compliant With:

Work Plan

Non-Compliant With:

Posting of performance bond

RESHERR

1.50

Ilocos Norte Adams Bulo 1 Phildane Resources Corporation

Compliant With:

'Work Program

Non-Compliant With:

RESHERR

1.50

Dumalneg Bulo 2 Phildane Resources Corporation

Compliant With:

'Work Program

Non-Compliant With:

RESHERR

5.00

II Cagayan Gonzaga Baua 1 Pan Pacific Renewable Power

Philippine Corp.

Compliant With:

RESHERR

Non-Compliant With:

Work Prgram

Posting of performance bond

4.44

Peñablanca Pinacanauan River Sunwest Water & Electric

Company, Inc.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

6.00

Isabela Balasig Balasig 2 Greenpower Resources Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

7.00

Page 13: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

II Isabela Cordon Magat F PhilCarbon Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

0.60

Dinapique Ilaguen 2 Isabela Power Corporation

Compliant With:

Work Plan

Posting of performance bond

RESHERR

14.00

Echague Ilaguen 3 Isabela Power Corporation

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

11.00

Ilaguen 4 Isabela Power Corporation

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

10.00

Ilagan IlaganTrans-Asia Oil and Energy

Development Corp,

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

9.00

Abuan River 1 Greenpower Resources Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

10.80

Ramon Maris Main Canal 1 SN Aboitiz Power - Greenfield, Inc.

Compliant With:

Work Program

RESHERR

Non-Compliant With:

Posting of performance bond

6.00

Page 14: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Isabela Ramon Magat AI-Magat Renewable Energy

Corporation

Compliant With:

Work Plan

Non-Compliant With:

RESHERR

1.30

Magat BI-Magat Renewable Energy

Corporation

Compliant With:

Work Plan

Non-Compliant With:

RESHERR

1.00

San Agustin Dibuluan Greenpower Resources Corporation

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

5.50

Ilaguen 5 Greenpower Resources Corporation

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

8.60

San Mariano Disabungan Greenpower Resources Corporation

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

5.50

San Mariano &

San GuillermoIlaguen Isabela Power Corp.

Compliant With:

Work Plan

Posting of performance bond

Non-Compliant With:

RESHERR

25.00

San Mateo Lateral B National Irrigation Administration

Compliant With:

Work Plan

Non-Compliant With:

RESHERR

0.05

San Pablo San Pablo Greenpower Resources Corporation

Compliant With:

Posting of performance bond

Non-Compliant With:

RESHERR

8.00

Page 15: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Isabela Tumauini Tumauini (Upper Cascade) Philnew Hydro Power Corp

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

14.00

Tumauini (Lower Cascade) Quadriver Energy Corporation

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

7.80

Nueva VizcayaAlfonso

CastañedaMangayngay United Hydro Power Builders

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

1.60

Denip JRV Renewable Energy Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

2.30

Ambaguio Matuno 1 Smith Bell Mini-Hydro Corp.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

7.40

Bambang Matuno Epower Technologies Corp.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

8.00

Page 16: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Nueva Vizcaya Bambang Matuno 2 Smith Bell Mini-Hydro Corp.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

7.90

Dupax del Norte

and Alfonso

Castañeda

Casignan JRV Renewable Energy Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

5.00

Dupax del Sur Abaca JRV Renewable Energy Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

3.20

Kasibu Didipio 1 AT Dinum Company

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

2.50

Didipio 2 AT Dinum Company

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

6.60

Page 17: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Nueva Vizcaya Kasibu Edralin AT Dinum Company

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

1.20

Namanaan AT Dinum Company

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

0.60

Solano Commonal-Uddiawan Smith Bell Mini-Hydro Corp.

Compliant With:

Work Plan

Non-Compliant With:

RESHERR

1.80

Quirino Aglipay Addalam Quirino Power Energy Corporation

Compliant With:

Work Program

Non-Compliant With:

RESHERR

3.60

Cabarroguis AddalamQuirino Resources Development

Corp.

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

26.00

Cabugao Diduyon Green Energy Management (GEM)

& Holdings, Inc.

Non-Compliant With:

Work Plan

RESHERR

320.00

Maddela Dabubu 2 Greenpower Resources Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

4.30

Dibuluan 2 Greenpower Resources Corporation

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

3.20

Nagtipunan Gawagan 1 Gedangan Hydro Power Corp.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

4.30

Page 18: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Quirino Nagtipunan Gawagan 2 Gedangan Hydro Power Corp.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

2.60

Geblem 1 Gedangan Hydro Power Corp.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

0.70

Dakgan 1 Asiapacific Renewables Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

9.00

Dakgan 2 Asiapacific Renewables Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

12.00

Dagkan United Hydro Power Builders

Compliant With:

Posting of performance bond

Non-Compliant With:

RESHERR

142.00

Isabela Ilagan Abuan 2 Greenpower Resources Corporation

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

8.10

Ramon Magat SN Aboitiz Power - Magat, Inc.

Compliant With:

Work Plan

RESHERR

360.00

San Pablo San Pablo 2 Greenpower Resources Corporation

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

2.00

Page 19: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

II Isabela San Pablo San Pablo 3 Greenpower Resources Corporation

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

4.90

Isabela &

Quirino

San Agustin &

MaddelaDabubu Greenpower Resources Corporation

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

4.50

III Aurora Dinalungan Talaytay Aurora Energy Corporation

Compliant With:

Work Program Posting

of performance bond

Non-Compliant With:

RESHERR

1.45

Dingalan Davildavilan PTC Energy, Inc.

Compliant With:

RESHERR

Non-Compliant With:

Work Plan

Posting of performance bond

1.00

Dingalan Pumped-Storage Strategic Power Development Corp.

Compliant With:

Work Program

Posting of performance bond

RESHERR

500.00

San Luis Diteki Aurora Energy Corporation

Compliant With:

Work Program Posting

of performance bond

Non-Compliant With:

RESHERR

1.67

Nueva Ecija Bongabon Calaanan Hydrokinetic Corp.

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

2.00

Page 20: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

III Nueva Ecija Gabaldon Dupinga Constellation Energy Corporation Non-Compliant With:

Performance Bond; Work Plan; RESHERR

3.00

Gabaldon / San

LuisLingod HEP United Hydro Power Builders

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

2.50

General Tinio Balintingon HEP First Gen Luzon Power Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

30.00

Rio Chico LGU of Gen. Tinio

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

2.00

PantabanganPantabangan (Pump

Storage) HEPFirst Gen Prime Energy Corporation

Compliant With:

Work Program

Posting of performance bond

RESHERR

300.00

Diaman United Hydro Power Builders

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

1.80

SampalocSan Lorenzo Ruiz Builders &

Developers Group, Inc.

Compliant With:

Posting of performance bond

Non-Compliant With:

Work Program

RESHERR

14.00

Rizal PRISMC PNOC-Renewables Corporation

Compliant With:

Work Plan

RESHERR

1.00

Page 21: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

III Nueva Ecija San Jose SDC PNOC-Renewables Corporation

Compliant With:

Posting of performance bond

RESHERR

Non-Compliant With:

'Work Program

0.50

Bataan Mariveles MarivelesSoutheast Asia Renewable Power

Corporation

Compliant With:

Posting of performance bond

Non-Compliant With:

Work Program

RESHERR

1.10

Tarlac Mayantoc Camiling 1 Northgreen Energy Corporation

Compliant With:

Work Program Posting

of performance bond

Non-Compliant With:

RESHERR

5.40

Camiling River 3 Northgreen Energy Corporation

Compliant With:

'Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

3.40

Zambales Iba Iba 2 Markham Resources Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

5.00

Masinloc Coto 1 Coto Hydro Corp.

Non-Compliant With:

Posting of performance bond

RESHERR

6.50

Coto 2 Coto Hydro Corp.

Non-Compliant With:

Posting of performance bond

RESHERR

2.80

Page 22: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

III Zambales Masinloc Coto 3 AT Dinum Company

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

2.20

Pangasinan San Quintin DipaloPower Beacon Renewable

Solutions, Inc.

Compliant With:

'Work Program

Non-Compliant With:

RESHERR

2.50

IV-A Bulacan Norzagaray Angat Run-of-River Strategic Power Development Corp.

Compliant With:

Work Program

Posting of performance bond

RESHERR

10.00

Quezon General Nakar Umiray 1 Laguna Hydroenergy Corporation

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

6.00

Umiray Site 2 River Laguna Hydroenergy Corporation

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

3.90

Umiray Site 4 River Laguna Hydroenergy Corporation

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

2.80

Lucban Maapon Renesons Energy Corporation

Compliant With:

Work Plan

Posting of performance bond

RESHERR

2.60

Page 23: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Quezon Mauban Calmenue Sta. Clara Power Corp.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

2.00

(Laguio) Laginbayan Malaki

2Enervantage Supplier's Co., Inc.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

3.10

Mauban Aurora All Asia Energy Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

10.00

Laguio (Laginbayan) Malaki

1Enervantage Supplier's Co., Inc.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

1.60

Real Kinanliman Municipality of Real, Quezon

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

1.60

Labayat River (Upper

Cascade)

Repower Energy Development

Corporation

Compliant With:

Work Plan

Posting of performance bond

RESHERR

7.00

Piapi RiverRepower Energy Development

Corporation

Compliant With:

Work Plan

Posting of performance bond

RESHERR

3.30

Lower Labayat RiverRepower Energy Development

Corporation

Compliant With:

Work Plan

Posting of performance bond

RESHERR

2.80

Page 24: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Quezon RealTignoan River (Upper

Cascade)

Repower Energy Development

Corporation

Compliant With:

Work Plan

Posting of performance bond

RESHERR

3.50

LalawinanRepower Energy Development

Corporation

Compliant With:

Work Program

Posting of performance bond

RESHERR

3.00

TibagRepower Energy Development

Corporation

Compliant With:

Work Program

Posting of performance bond

RESHERR

5.00

Tignoan Aurora All Asia Energy Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

20.00

Rizal Pililla Pililia Pumped StorageTrans-Asia Oil and Energy

Development Corp,

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

300.00

Rodriguez Wawa Pumped Storage 1San Lorenzo Ruiz Builders and

Developers Group, Inc.

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

500.00

Wawa Pumped Storage 2San Lorenzo Ruiz Builders and

Developers Group, Inc.

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

100.00

Wawa Pumped Storage 3San Lorenzo Ruiz Builders and

Developers Group, Inc.

Compliant With:

Work Program

Posting of performance bond

RESHERR

Non-Compliant With:

RESHERR

50.00

Page 25: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

IV-A Laguna Majayjay MajayjayMajayjay Hydropower Company,

Inc.

Compliant With:

Work Program

Posting of performance bond

RESHERR

2.20

Upper Botocan River Aurora All Asia Energy Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

8.64

Balanac (Middle)Repower Energy Development

Corporation

Compliant With:

Work Program

Posting of performance bond

RESHERR

5.00

Pangil Dambo Pumped Storage Belisama Hydropower Corporation

Compliant With:

Posting of performance bond

Non-Compliant With:

RESHERR

800.00

CaviteIndang &

MaragondonIndang Energywise Corporation

Compliant With:

RESHERR

Non-Compliant With:

Work Program

Posting of performance bond

1.50

Laguna &

Quezon

Pangil & Real &

MaubanSiniloan Sierra Madre Water Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

35.00

IV-BOriental

MindoroBaco Dulangan PNOC - Renewables Corp.

Compliant With:

RESHERR

Non-Compliant With:

Posting of performance bond

Work Program

8.25

Linao-Cawayan (Upper

Cascade)

Oriental Mindoro Electric

Cooperative, Inc.

Compliant With:

Work Plan

RESHERR

2.10

Page 26: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

IV-BOriental

MindoroBaco

Linao-Cawayan (Lower

Cascade)

Oriental Mindoro Electric

Cooperative, Inc.

Compliant With:

Work Plan

RESHERR2.10

San IgnacioAlpaparay Resort & Development

Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

0.50

Bansud & Gloria Bansud Sunwest Water and Electric Co., Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

1.50

Naujan Catuiran Catuiran Hydro Power Corp.

Compliant With:

Work Plan

Posting of performance bond

RESHERR

8.00

Catuiran (Upper Cascade) Philnew Hydro Power Corp

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

8.00

San Teodoro Inabasan Ormin Power, Inc

Compliant With:

RESHERR

Non-Compliant With:

Work Plan

Posting of performance bond

10.00

Linao Cawayan Phase 2

(Tail-End)Mindoro Grid Corporation

Compliant With:

Work Program Posting

of performance bond

Non-Compliant With:

RESHERR

1.00

Alag Tributary 1 Constellation Energy Corporation

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

2.80

Page 27: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Oriental

MindoroSan Teodoro Alag Tributary 2 Constellation Energy Corporation

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

2.80

San Teodoro &

Puerto GalleraInabasan Phase II Ormin Power, Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

10.00

Sibagat Bongabong S&B Power Corporation

Compliant With:

Work Program 2.60

Palawan Bataraza Marangas River AQA Global Power Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

12.00

Brooke's Point Sologon River HEP AQA Global Power Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

12.00

Busuanga Busuanga River 1 HEP AQA Global Power Inc.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

8.00

El Nido Bulalakao 1 North RiverAlternergy Viento Partners

Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

0.34

Bulalakao 2 South RiverAlternergy Viento Partners

Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

0.44

Page 28: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Palawan Narra Batang-Batang Langongan Power Corporation

Compliant With:

'Work Plan

Non-Compliant With:

Posting of performance bond

RESHERR

3.50

Bato-Bato (Kaliwa) AQA Global Power Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

12.00

Estrella River AQA Global Power Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

8.00

Malasgao (Kaliwa) HEP AQA Global Power Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

10.00

Puerto Princesa Langogan Langongan Power Corporation

Compliant With:

'Work Plan

Non-Compliant With:

Posting of performance bond

RESHERR

6.80

Puerto Princesa Inaguan River HEP AQA Global Power Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

12.00

Rizal Culasian River HEP AQA Global Power Inc.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

10.00

Romblon San Fernando Cantingas Romblon Electric Cooperative, Inc.

Compliant With:

'Work Plan

Non-Compliant With:

RESHERR

0.90

Page 29: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

IV-B Quezon General Nakar Kanan B-1 Energy World Kanan River, Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

150.00

Oriental

MindoroNaujan Mag-asawang Tubig B

Philippine Hybrid Energy Systems,

Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

1.00

V Camarines Sur Buhi Barit Irrigation Discharge NASCENT Technologies Corp.Non-Compliant With:

Performance Bond; Work Plan RESHERR0.40

Barit 2 People's Energy Services Inc.

Compliant With:

Work Program

'Posting of performance bond

Non-Compliant With:

RESHERR

0.60

Barit 1 People's Energy Services Inc.

Compliant With:

Work Plan

Non-Compliant With:

RESHERR

1.80

Goa & Tigaon RanggasClean and Green Energy Solutions,

Inc.

Compliant With:

Work Program

RESHERR

Non-Compliant With:

'Posting of performance bond

1.50

Catanduanes Caramoran Hitoma 1 Sunwest Water & Electric

Company, Inc.

Compliant With:

Work Plan

RESHERR

1.50

San Miguel *Solong Sunwest Water & Electric

Company, Inc.

Compliant With:

Work Plan

RESHERR

2.10

Kapipian Sunwest Water & Electric

Company, Inc.

Compliant With:

Posting of performance bond

Non-Compliant With:

RESHERR

Work Plan

2.40

Page 30: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

VCamarines

NorteBasud San Pascual Levan Marketing Corporation

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

1.40

Mercedes ColasiColasi Mini Hydro Electric Power

Plant Corporation

Non-Compliant With:

Posting of performance bond

RESHERR

0.96

Sorsogon Sorsogon Cawayan 2 Sunwest Water and Electric Co., Inc.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

0.99

Upper Cawayan (Cawayan

1)

Sunwest Water and Electric Co., Inc.

- Sorsogon II Electric Cooperative,

Inc. (SUWECO-SORECO II)

Compliant With:

Work Program

Non-Compliant With:

RESHERR

0.60

Luzon Sum 8,130.55 738.615

Visayas VI Aklan Libacao Main Aklan Sunwest Water & Electric

Company, Inc.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

15.00

Madalag TimbabanOriental Energy and Power

Generation Corporation

Compliant With:

Work Plan

Posting of Performance Bond

Non-Compliant With:

RESHERR

18.00

Malay Aklan Pumped-Storage Strategic Power Development Corp.

Compliant With:

Work Program

Posting of performance bond

RESHERR

300.00

Antique Bugasong Villasiga Sunwest Water & Electric

Company, Inc. 2

Compliant With:

Work Plan

RESHERR

8.00

Page 31: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Visayas VI Antique Bugasong Villasiga 2 Sunwest Water and Electric Co., Inc.

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

9.40

San Remigio Maninila (Lower Cascade) Century Peak Energy Corporation

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

4.50

Maninila (Upper Cascade) Century Peak Energy Corporation

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

3.10

Sibalom (Upper Cascade) Century Peak Energy Corporation

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

4.20

Sibalom (LowerCascade) Century Peak Energy Corporation

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

3.30

Sibalom (Middle Cascade) Century Peak Energy Corporation

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

4.00

Sebaste Caro-an Antique Electric Cooperative, Inc.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

0.84

Ipayo Antique Electric Cooperative, Inc.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

1.30

Iloilo Igbaras Igbulo (Bais) Century Peak Energy Corporation

Non-Compliant With:

Posting of performance bond

RESHERR

5.10

Page 32: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Visayas VINegros

OccidentalBago & Murcia Bago 4

Alsons Energy Development

Corporation

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

11.00

Isabela Limalima-Sacop Phase 1 888 Blue Energy Corporation

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

2.00

Limalima-Sacop Phase 2 888 Blue Energy Corporation

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

8.00

KabankalanHilabangan ( Upper

Cascade)Century Peak Energy Corporation

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

4.80

Hilabangan ( Lower

Cascade)Century Peak Energy Corporation

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

3.00

Sagay City Lower Himogaan LGU of Sagay

Compliant With:

Work Plan

Non-Compliant With:

Posting of performance bond

RESHERR

4.00

San Carlos City Bago 1Alsons Energy Development

Corporation

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

4.00

Page 33: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

VINegros

OccidentalSan Carlos City Bago Prosperidad 2

Bago River Hydro Power

Corporation

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

2.00

InitihanBago River Hydro Power

Corporation

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

3.00

San Carlos City &

MurciaBago 2

Alsons Energy Development

Corporation

Compliant With:

Posting of performance bond

Non-Compliant With:

Work Program

RESHERR

10.00

Silay & E. B

MagalonaMalogo Phase 3 Vivant-Malogo Hydropower, Inc.

Compliant With:

Work Program

Posting of performance bond

'RESHERR

2.00

Silay City Malugo Vivant-Malogo Hydropower, Inc.

Compliant With:

RESHERR

Non-Compliant With:

Work Plan

Posting of performance bond

6.00

Victorias and

CadizMalogo Phase 2 Vivant-Malogo Hydropower, Inc.

Compliant With:

Work Program

Posting of performance bond

'RESHERR

5.00

VII Bohol Danao Cantakoy Quadriver Energy Corporation

Compliant With:

RESHERR

Non-Compliant With:

Work Plan

Posting of performance bond

8.00

Loboc Loboc Sta. Clara Power CorporationNon-Compliant With:

RESHERR1.20

Page 34: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

VII Bohol Loboc Loboc (Expansion) Sta. Clara Power Corp.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

1.20

Sevilla Sevilla BOHECO 1 Sevilla Mini Hydro Corp.

Compliant With:

Work Plan

RESHERR

2.50

Cebu Alegria Compostela T.A.G Mineral Resources, Inc.

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

0.50

Argao Argao Universal Hydrotechnologies, Inc.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

0.80

Badian Basak II Rapids Innoenergy, Inc.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

0.50

Negros Oriental Amlan Amlan (Plant C) Natural Power Sources

Intergration,Inc.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

0.80

Amlan (Plant B) Natural Power Sources

Intergration,Inc.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

1.50

Amlan (Plant A) Natural Power Sources

Intergration,Inc.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

3.20

AmlanAmlan Hydroelectric Power

Corporation

Compliant With:

Work Plan

Posting of performance bond

Non-Compliant With:

RESHERR

0.80

Page 35: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

VII Negros Oriental La Libertad Pacuan-Guinobaan PNOC - Renewables Corp.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

13.80

Mabinay IlogTrans-Asia Oil and Energy

Development Corp,

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

21.60

Siaton Canaway 1 Orbysy Holdings, Inc.

Compliant With:

Work Program

Posting of performance bond

RESHERR

1.60

Canaway 2 Orbysy Holdings, Inc.

Compliant With:

Work Program

Posting of performance bond

RESHERR

1.40

Siquijor Lazi Senona AQA Global Power Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

3.20

Gabangan AQA Global Power Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

4.14

VIII Eastern Samar Lawaan Pumped Storage BolusaoSan Lorenzo Ruiz Builders &

Developers Group, Inc.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

300.00

Run-of-River BolusaoSan Lorenzo Ruiz Builders &

Developers Group, Inc.

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

12.00

Maslog Upper Maslog Iraya Energy Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

9.00

Page 36: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

VIII Eastern Samar Maydolong Buhid Vivant Energy Corp.Compliant With:

Posting of performance bond 20.20

Taft /

HinabanganTubig Vivant Energy Corp.

Compliant With:

Posting of performance bond 20.20

Leyte Inopacan Caminto River Leyte IV Electric Cooperative, Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

0.50

Jaro & Pastrana Binaha-an RiverEngineering & Development

Corporation of the Philippines

Compliant With:

RESHERR

Non-Compliant With:

Work Program

Posting of performance bond

2.20

Southern Leyte St. Bernard HinabianSouthern Leyte Electric

Cooperative, Inc.

Non-Compliant With:

RESHERR0.81

Leyte Kananga BaoLeyte V Electric Cooperative, Inc

(LEYECO V)

Compliant With:

Posting of performance bond

Non-Compliant With:

Work Program

RESHERR

1.50

Western Samar Calbayog City Bugtong FallsClean and Green Energy Solutions,

Inc.

Non-Compliant With:

RESHERR1.80

Calbiga &

PinabacdaoCalbiga Meadowland Developers, Inc.

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

15.00

Visayas Sum 886.18 5.31

Mindanao IXZamboanga del

SurBayog Bayog Global Sibagat Hydro Power Corp.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

6.00

Dumingag &

MidsalipSindangan 4

Alsons Energy Development

Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

8.00

Page 37: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Mindanao IXZamboanga del

SurZamboanga City Saaz Meadowland Developers, Inc.

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

1.00

Zamboanga del

NorteLeon Postigo

Polandoc Hydroelectric

Power Project

Euro Hydro Power (Asia) Holdings,

Inc.

Non-Compliant With:

Work Program

Posting of Performance Bond

RESHERR

2.00

Mutia Dapitan River (Upper)Euro Hydro Power (Asia) Holdings,

Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

3.60

Dapitan River (Middle)Euro Hydro Power (Asia) Holdings,

Inc.

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

3.60

Zamboanga City Alimpaya Everhydro Corporation

Compliant With:

Work Program Posting

of performance bond

RESHERR1.00

Ayala Everhydro Corporation

Compliant With:

Posting of performance bond

RESHERR

Non-Compliant With:

'Work Program

1.00

Page 38: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

IX Zamboanga City Patalon Everhydro Corporation

Compliant With:

Posting of performance bond

RESHERR

Non-Compliant With:

Work Program

0.50

Tagpangi Everhydro Corporation

Compliant With:

Work Program Posting

of performance bond

RESHERR0.50

Zamboanga City Pasonanca (Upstream) PhilCarbon Inc.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

1.00

Pasonanca PhilCarbon Inc.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

0.05

X Bukidnon Pulanai RiverRepower Energy Development

Corporation

Compliant With:

Work Plan

Posting of performance bond

RESHERR

10.60

Katipunan RiverRepower Energy Development

Corporation

Compliant With:

Work Plan

Posting of performance bond

RESHERR

2.10

Baungon Bubunawan Bubunawan Power Company, Inc.

Compliant With:

Work Plan

Non-Compliant With:

RESHERR

7.00

Rio Verde Inline (Phase 1)Rio Verde Water Consortium, Inc.

(RVWCI)

Compliant With:

Work Program

Posting of performance bond

RESHERR

0.50

Page 39: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

X BukidnonBaungon and

LibonaBubunawan

FGEN Bubunawan Hydro

Corporation

Compliant With:

RESHERR

Posting of Performance Bond

Non-Compliant With:

Work Plan

23.00

Dancagan Kitaotao 1 Hedcor Bukidnon, Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

70.00

Impasugong Panoon Gerphil Renewable Energy, Inc.

Compliant With:

Work Plan

Non-Compliant With:

RESHERR

0.22

Gakaon LGU of Impasugong

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

2.23

Atugan 1 River Gerphil Renewable Energy, Inc.

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

2.40

Atugan 4 Gerphil Renewable Energy, Inc.

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

3.50

Impasugong and

SumilaoTagoloan FGEN Tagoloan Hydro Corporation

Compliant With:

Posting of performance bond

RESHERR

Non-Compliant With:

Work Plan

39.00

KalilanganMaladugao River (Upper

Cascade)

UHPC Bukidnon Hydro Power I

Corporation

Compliant With:

Work Plan

Posting of performance bond

RESHERR

8.40

Page 40: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Kalilangan &

Wao

Maladugao River (Lower

Cascade)United Holdings Power Corporation

Compliant With:

Work Plan

Posting of performance bond

RESHERR

15.70

Libona Umalag 2 Meadowland Developers, Inc.

Compliant With:

'Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

2.50

Malaybalay Middle Canayan Sta. Clara Power Corp.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

3.00

SawagaRepower Energy Development

Corporation

Compliant With:

Work Program

Posting of performance bond

RESHERR

2.00

Malitbog Malitbog HEP Philnewriver Power Corp.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

5.00

Silo-o HEP Philnewriver Poser Corp.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

4.50

Manolo Fortich Agusan River FG Bukidnon Power Corp.

Compliant With:

Work Plan

RESHERR

1.60

Culaman Oriental Energy and Power

Generation Corporation

Compliant With:

RESHERR

Posting of performance bond

Non-Compliant With:

Work Plan

10.00

Page 41: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Manolo Fortich Mangima HEP Philnewriver Power Corp.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

10.00

Maramag Maramag

First Bukidnon Electric Cooperative,

Inc. transferred to Maramag Mini-

Hydro Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

2.00

Pulangui IVRepower Energy Development

Corporation

Compliant With:

Work Program

Posting of performance bond

RESHERR

10.00

Santiago Manolo Fortich 1 Hedcor Bukidnon, Inc.

Compliant With:

Work Plan

RESHERR

Non-Compliant With:

Posting of performance bond

43.40

Manolo Fortich 2 Hedcor Bukidnon, Inc.

Compliant With:

Work Plan

RESHERR

Non-Compliant With:

Posting of performance bond

25.40

Talakag 12.0 MW Talakag 3 HEP Markham Resources Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

12.00

Valencia Manupali Matic Hydropower Corporation

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

9.00

Upper Manupali Bukidnon II Electric Cooperative,

Inc.

Compliant With:

RESHERR

Non-Compliant With:

Work Plan

Posting of performance bond

2.00

Page 42: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Misamis

Occidental

Cagayan de Oro

CityLimbatangon HEP

Turbines Resource & Development

Corp.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

9.00

Umalag 1 Meadowland Developers, Inc.

Compliant With:

'Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

1.80

Calamba Langaran Kaltimex Langaran Hydro, Inc.

(KLHI)

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

3.60

Clarin Clarin Philnew Hydro Power Corp

Compliant With:

RESHERR

Non-Compliant With:

Posting of Performance Bond

6.20

Misamis

OrientalClaveria Cabulig Mindanao Energy Systems, Inc.

Compliant With:

Work Plan

Non-Compliant With:

RESHERR

8.00

Mat-i 2 HEP Philnewriver Power Corp.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

1.60

Mat-i 3 HEP Philnewriver Power Corp.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

3.25

Gingoog City Odiongan River A JE Hydropower Ventures, Inc.Non-Compliant With:

RESHERR0.25

Page 43: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Misamis

OrientalJasaan Lower Cabulig Mindanao Energy Systems, Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

10.00

Lanao del Norte Bacolod Liangan Liangan Power Corporation

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

11.90

Iligan City Bayug HEPEuro Hydro Power (Asia) Holdings,

Inc.

Non-Compliant With:

Posting of performance bond

RESHERR

1.00

Lower BayugEuro Hydro Power (Asia) Holdings,

Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

4.00

Upper BayugEuro Hydro Power (Asia) Holdings,

Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

3.30

Bulanog-BatangBukidnon Hydro Energy

Corporation

Compliant With:

Work Program

Posting of performance bond

Non-Compliant With:

RESHERR

150.00

Agus VIII Modular Fu-Tai Philippines, Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

12.00

Cagayan 1NFirst Gen Mindanao Hydro Power

Corp.

Non-Compliant With:

RESHERR160.00

Kolambogan Titunod HEPEuro Hydro Power (Asia) Holdings,

Inc.

Compliant With:

Work Program

Posting of performance bond

RESHERR

3.00

Page 44: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

X Cagayan de Oro Claveria Mat-I 1 Philnew Hydro Power Corp

Compliant With:

RESHERR

Non-Compliant With:

Work Plan

Performance Bond

4.85

X/ARMM

Lanao del

Norte/Lanao del

Sur

Pantar &

Baloi/SaguiaranAgus III Maranao Energy Corp.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

225.00

XI Davao del Sur Davao City Tamugan HEDCOR, Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

11.50

Talomo 3 HEDCOR, Inc.

Compliant With:

Work Plan

RESHERR1.92

Talomo 1 HEDCOR, Inc.

Compliant With:

Work Plan

RESHERR1.00

Davao City Talomo 2A HEDCOR, Inc.

Compliant With:

Work Plan

RESHERR0.65

Talomo 2B HEDCOR, Inc.

Compliant With:

Work Plan

RESHERR0.30

Digos City RuparanDavao de Sur Electric Cooperative,

Inc.

Compliant With:

RESHERR

Non-Compliant With:

Work Program

Posting of performance bond

5.00

Page 45: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

XI Davao del Sur Goa & Tigaon GumaEuro Hydro Power (Asia) Holdings,

Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

1.70

Malita Malita LGU of Malita, Davao del Sur

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

2.50

Sta. Cruz Tudaya 2 Hedcor Tudaya, Inc.

Compliant With:

Work Plan

RESHERR7.00

Tudaya 1 Hedcor Sibulan, Inc .

Compliant With:

Work Plan

RESHERR6.60

Sibulan B Hedcor Sibulan, Inc .

Compliant With:

Work Plan

RESHERR

26.00

Sibulan A Hedcor Sibulan, Inc .

Compliant With:

Work Plan

RESHERR

16.50

Compostela

ValleyMaco Hijo River II Sta. Clara Power Corp.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

3.00

Mt. Leonard Sta. Clara Power Corp.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

2.00

Page 46: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Compostela

ValleyMaco Hijo River I Sta. Clara Power Corp.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

3.00

Tagum Sta. Clara Power Corp.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

2.60

New Bataan New Bataan HEPEuro Hydro Power (Asia) Holdings,

Inc.

Compliant With:

Work Program

RESHERR

Non-Compliant With:

Posting of performance bond

2.40

Davao Oriental Baganga Cateel Global Sibagat Hydro Power Corp.

Compliant With:

Posting of performance bond

Non-Compliant With:

Work Program

RESHERR

16.00

First Gen Mindanao Hydro Power

Corp.

Non-Compliant With:

RESHERR17.50

Baganga River Global Sibagat Hydro Power Corp.

Compliant With:

RESHERR

Non-Compliant With:

Work Program

Posting of performance bond

11.00

Caraga ManorigaoLGS Renewable Energies

Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

17.00

Caraga 4LGS Renewable Energies

Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

35.00

Page 47: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

Davao Oriental Caraga Caraga A1 Volga Power Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

6.50

Caraga A2 Volga Power Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

7.00

Caraga A3 Volga Power Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

4.50

Governor

GenerosoOsmena

LGS Renewable Energies

Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

2.00

TibanbanLGS Renewable Energies

Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

2.00

Magdao Volga Power Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

2.00

Lupon Sumlog 1Alsons Energy Development

Corporation

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

8.00

Lupon & Mati Sumlog 2Alsons Energy Development

Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

15.00

Page 48: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

XI Davao Oriental Manay Casauman Global Sibagat Hydro Power Corp.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

34.00

(blank) Davao City Talomo 2 HEDCOR, Inc.

Compliant With:

Work Plan

RESHERR0.60

Apo Agua Apo Agua Infrastructura, Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

2.20

Davao City DavaoSan Lorenzo Ruiz Builders &

Developers Group, Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

140.00

XII North Cotabato Alamada Alamada HEPEuro Hydro Power (Asia) Holdings,

Inc.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

1.00

Magpet Magpet 2 Universal Hydrotechnologies, Inc.

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

1.30

Magpet 1 Universal Hydrotechnologies, Inc.

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

9.80

Makilala Makilala-1 Universal Hydrotechnologies, Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

2.00

Page 49: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

XII Sultan Kudarat Isulan Kabulnan 2 HEP Philnewriver Power Corp.

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

110.00

Sarangani Maasim Siguil 1 Alsons Energy Development

CorporationMerged with Siguil 2 & 3 8.70

Siguil 3 Alsons Energy Development

CorporationMerged with Siguil 1 & 2 4.80

Page 50: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

XII Sarangani Maasim Siguil 2 Alsons Energy Development

CorporationMerged with Siguil 1 & 3 3.20

Maitum Kalaong 1Alsons Energy Development

Corporation

Compliant With:

Work Plan

Non-Compliant With:

Posting of performance bond

RESHERR

12.00

Kalaong 2Alsons Energy Development

Corporation

Compliant With:

Work Plan

Non-Compliant With:

Posting of performance bond

RESHERR

6.00

Kalaong 3Alsons Energy Development

Corporation

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

4.00

MalungonKiblat-Royeca Malandag

Power House 1-A

Kiblat Malandag Royeca Mini-

Hydro Power Project

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

1.46

Kiblat-Royeca Malandag

Power House 2

Kiblat Malandag Royeca Mini-

Hydro Power Project

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

0.80

South CotabatoKoronadal &

TampakanMarbel 1

Euro Hydro Power (Asia) Holdings,

Inc.

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

0.50

Lake Sebu Lanon (Lam-alu)Euro Hydro Power (Asia) Holdings,

Inc.

Non-Compliant With:

Posting of performance bond

RESHERR

9.00

TakboSouth Cotabato I Electric

Cooperative, Inc.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

15.00

Page 51: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

XIIIAgusan del

NorteButuan City Bugsukan Global Sibagat Hydro Power Corp.

Compliant With:

Posting of performance bond

RESHERR

Non-Compliant With:

'Work Program

5.00

Butuan City,

Agusan del NorteTaguibo 2 Equi-Parco Construction Co.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

2.00

Taguibo 1 Equi-Parco Construction Co.

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

2.00

Cabadbaran Cabadbaran FGEN Cabadbaran Hydro

Corporation

Non-Compliant With:

Work Plan

Posting of performance bond

RESHERR

9.75

Jabonga Puyo FGEN Puyo Hydro Corporation

Compliant With:

Work Plan

Posting of performance bond

Non-Compliant With:

RESHERR

30.00

Lake Mainit Agusan Power Corporation

Compliant With:

Work Plan

Posting of performance bond

RESHERR

25.00

Santiago, Agusan

del NorteAsiga Asiga Green Energy Corporation

Compliant With:

'Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

8.00

Surigao del Sur Cantilan Lower Carac-an Meadowland Developers, Inc.

Compliant With:

Work Program

Non-Compliant With:

Posting of performance bond

RESHERR

5.00

Page 52: AWARDED HYDROELECTRICPOWER PROJECTS as of December … · AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, ... AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016 ...

AWARDED HYDROELECTRICPOWER PROJECTS as of December 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

XIII Surigao del SurCarrascal and

CantilanCarac-an Hydro Link Projects Corporation

Non-Compliant With:

RESHERR25.00

San Miguel Carromata Surigao Del Sur II Elec Coop

Non-Compliant With:

Posting of performance bond

RESHERR

5.60

Agusan del Sur Sibagat Wawa 2 Equi-Parco Construction Co. Merged with Wawa 3 7.00

Wawa 3 Equi-Parco Construction Co. Merged with Wawa 2 5.60

ManagongGlobal Sibagat Hydropower

Corporation

Non-Compliant With:

Work Program

Posting of performance bond

RESHERR

6.00

WawaGlobal Sibagat Hydropower

Corporation

Compliant With:

Posting of performance bond

Non-Compliant With:

Work Program

RESHERR

13.00

ARMM Lanao del Sur Malabang Matadi River HEP AQA Global Power Inc.

Non-Compliant With:

Work Plan

Posting of Performance Bond

RESHERR

27.00

Malabang &

Tubaran Maitling River HEP AQA Global Power Inc.

Non-Compliant With:

Work Plan

Posting of Performance Bond

RESHERR

50.00

Pualas & Ganassi Lake Dapao HEP AQA Global Power Inc.

Compliant With:

Posting of performance bond

Non-Compliant With:

Work Plan

RESHERR

50.00

Mindanao Sum 1,775.64 77.89