Transcript of Avclsbr.ppt 05/2005Version 2.11 U.S.C.G. AUXILIARY EIGHTH WESTERN RIVERS REGION AID VERIFIER...
avclsbr.ppt 05/2005 Version 2.1 1
U.S.C.G. AUXILIARYEIGHTH WESTERN RIVERS REGION
AID VERIFIER TRAINING
BRIDGE VERIFICATIONS AND REPORTING
Available on the Internet at: http://www.trlmo.com/cgaux8wr/aton/avclsbr.pptUsing Microsoft PowerPoint Viewer
avclsbr.ppt 05/2005 Version 2.1 2
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
INDEX TO TOPICS
INTRODUCTION AND BACKGROUND
GENERAL BRIDGE LIGHTING REQUIREMENTS
FIXED BRIDGE LIGHTING
LIGHTING FOR VERTICAL LIFT BRIDGES
LIGHTING FOR SWING SPAN BRIDGES
LIGHTING FOR BASCULE BRIDGES
BRIDGE LATITUDE / LONGITUDE POSITION DATA USING GPS / DGPS
SUMMARY NOTES -- REPORTING BRIDGE DISCREPANCIES
ACKNOWLEDGMENTSpecial thanks to Roger Wiebusch, Bridge Administrator, Western Rivers Operations, Saint Louis,
for his many contributions to, and his time spent reviewing, this material.
avclsbr.ppt 05/2005 Version 2.1 3
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
• HISTORICALLY, AID VERIFIERS HAVE HAD A TOUGH TIME DESCRIBING BRIDGE DISCREPANCIES AND ACCURATELY IDENTIFYING THE LOCATION OF THE DISCREPANCIES
• THE COAST GUARD BRIDGE ADMINISTRATOR IS RESPONSIBLE FOR CONTACTING THE OWNERS OF BRIDGES WITH DISCREPANCIES BASED ON THE INFORMATION THE AUXILIARISTS REPORT ON THE BRIDGE VERIFICATION WORKSHEETS
• WITHOUT COMPLETE AND ACCURATE INFORMATION, THE BRIDGE ADMINISTRATOR CANNOT DO HIS JOB OF FOLLOWING UP ON AUXILIARY REPORTS
INTRODUCTION AND BACKGROUND
THE PURPOSE OF THIS TRAINING PRESENTATION IS TO PROVIDE 8WR AUXILIARY AID VERIFIERS WITH THE INFORMATION NEEDED TO
COMPLETELY AND ACCURATELY REPORT BRIDGE DISCREPANCIES
avclsbr.ppt 05/2005 Version 2.1 4
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
GENERAL BRIDGE LIGHTING REQUIREMENTS
• BRIDGE LIGHTING IS REQUIRED: AS PRESCRIBED BY THE COAST GUARD DISTRICT COMMANDER FOR BRIDGES IN
NAVIGABLE WATERWAYS FROM SUNSET TO SUNRISE IN PERIOD OF REDUCED VISIBILITY (LESS THAN ONE MILE) TO BE VISIBLE FOR ONE MILE
• CLEARANCE GAUGES: SHOULD BE READABLE FOR ONE-HALF MILE ARE MAINLY FOUND ON FIXED BRIDGES READING AT THE WATER LEVEL IS THE CLEARANCE FROM THE WATER TO THE
MINIMUM LOW STEEL ELEVATION OF THE BRIDGE SPAN (FOR MOVEABLE BRIDGES, THE READING SHOWS THE CLEARANCE WHEN THE BRIDGE IS IN THE CLOSED POSITION.)
• ANYONE CAN, AND SHOULD REPORT DISCREPANCIES HOWEVER, VERIFICATIONS MUST BE SUBMITTED BY A QUALIFIED AID VERIFIER
avclsbr.ppt 05/2005 Version 2.1 5
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
• THE CENTER OF THE MAIN CHANNEL AND ALTERNATE CHANNELS (IF ANY) ARE MARKED USING 360 DEGREE FIXED GREEN LIGHTS WHICH FORM A RANGE IN THE CENTER OF THE SPAN. THESE ARE CALLED:
– "MAIN CHANNEL CENTER LIGHTS" OR "ALTERNATE CHANNEL CENTER LIGHTS"
• IF THERE IS AN ALTERNATE CHANNEL, THEN THE MAIN CHANNEL IS MARKED BY THREE VERTICAL 180 DEGREE FIXED WHITE LIGHTS LOCATED ABOVE THE GREEN MAIN CHANNEL CENTER LIGHT. THESE ARE CALLED:
– "MAIN CHANNEL LIGHTS"
Note: Bridges display lights that are specifically defined by Coast Guard permit. The lighting configurations may vary from the general descriptions in this presentation. Example: A Saint Louis bridge displays Main Channel Lights with flashing green characteristics (versus fixed white characteristics).
FIXED BRIDGE LIGHTING
avclsbr.ppt 05/2005 Version 2.1 6
• BRIDGE PIERS ON THE LEFT DESCENDING (LD) AND RIGHT DESCENDING (RD) SIDES OF A NAVIGABLE CHANNEL SHOW 180 DEGREE FIXED RED LIGHTS ON BOTH THE DOWNSTREAM (D/S) AND UPSTREAM (U/S) ENDS OF THE PIER. THIS LIGHT IS CALLED A:
– "PIER LIGHT"
• WHERE THE NAVIGABLE CHANNEL (MAIN CHANNEL OR ALTERNATE CHANNEL) IS LOCATED BETWEEN BRIDGE PIERS BUT DOES NOT EXTEND ALL THE WAY TO A BRIDGE PIER, THEN THE EXTENT OF THE CHANNEL IS MARKED BY 180 DEGREE FIXED RED LIGHTS LOCATED ON THE BRIDGE SPAN ON BOTH THE DOWNSTREAM (D/S) AND UPSTREAM (U/S) SIDES OF THE SPAN. THIS LIGHT IS CALLED A:
– "CHANNEL MARGIN LIGHT"
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
FIXED BRIDGE LIGHTING
avclsbr.ppt 05/2005 Version 2.1 7
BRIDGE LIGHTING TYPES "A" -- MAIN OR ALTERNATE CHANNEL CENTER LIGHT (360 DEGREES GREEN)"B" -- PIER LIGHT (180 DEGREES RED)"C" -- CHANNEL MARGIN LIGHT (180 DEGREES RED)"D" -- MAIN CHANNEL LIGHTS (THREE VERTICAL LIGHTS, 180 DEGREES WHITE)
LOCATION MUST BE SPECIFIED:"LD" (LEFT DESCENDING) OR "RD" (RIGHT DESCENDING) FOR MARGIN AND PIER LIGHTS"U/S" (AS VIEWED FROM UPSTREAM) OR "D/S" (AS VIEWED FROM DOWNSTREAM)"MAIN" OR "ALTERNATE" CHANNEL
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
TYPICAL FIXED BRIDGE LIGHTING
avclsbr.ppt 05/2005 Version 2.1 8
(EXAMPLE: AS VIEWED FROM UPSTREAM)
MINIMUM LIGHTING FOR FIXED BRIDGES
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
BRIDGES MAY ALSO EXHIBIT AIRCRAFT CLEARANCE LIGHTS REQUIRED BY THE FAA.DISCREPANCIES SHOULD BE REPORTED TO THE NEAREST FAA FACILITY, NOT ON THE CG BRIDGE REPORT.
avclsbr.ppt 05/2005 Version 2.1 9
HOW WOULD EACH LIGHT BE DESIGNATED WHEN VIEWING FROM DOWNSTREAM?
MINIMUM LIGHTING FOR FIXED BRIDGES
MAIN CHANNEL
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
avclsbr.ppt 05/2005 Version 2.1 10
(EXAMPLE: AS VIEWED FROM UPSTREAM)
MINIMUM LIGHTING FOR FIXED BRIDGESMAIN AND ALTERNATE CHANNELS
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
BRIDGES MAY ALSO EXHIBIT AIRCRAFT CLEARANCE LIGHTS REQUIRED BY THE FAA.DISCREPANCIES SHOULD BE REPORTED TO THE NEAREST FAA FACILITY, NOT ON THE CG BRIDGE REPORT.
avclsbr.ppt 05/2005 Version 2.1 11
HOW WOULD EACH LIGHT BE DESIGNATED WHEN VIEWING FROM DOWNSTREAM?
MINIMUM LIGHTING FOR FIXED BRIDGESMAIN AND ALTERNATE CHANNELS
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
avclsbr.ppt 05/2005 Version 2.1 12
LIGHTING FOR VERTICAL LIFT BRIDGES
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
• WHEN THE BRIDGE IS IN ANY POSITION OTHER THAN FULLY RAISED, THE CENTER OF THE LIFT BRIDGE SPAN IS MARKED BY TWO 180 DEGREE FIXED RED LIGHTS -- ONE FACING UPSTREAM AND THE OTHER DOWNSTREAM. WHEN FULLY RAISED, THE CENTER OF THE SPAN SHOWS TWO 360 DEGREE FIXED GREEN LIGHTS. EACH OF THESE RED AND GREEN LIGHTS IS CALLED A:
– "RED LIFT SPAN LIGHT" or "GREEN LIFT SPAN LIGHT" (identified on the graphic below as "A")
• EACH LIFT PIER, OR AN ATTACHED PROTECTION PIER, IS MARKED BY A 180 DEGREE FIXED RED LIGHT ON BOTH THE DOWNSTREAM (D/S) AND UPSTREAM (U/S) ENDS OF THE PIER. THIS LIGHT IS CALLED A:
– "LIFT PIER LIGHT" or "PIER LIGHT" (identified on the graphic below as "B")
avclsbr.ppt 05/2005 Version 2.1 13
LIGHTING FOR VERTICAL LIFT BRIDGES (Continued)
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
• A THIRD PIER LIGHT, IN ADDITION TO THE TWO (U/S AND D/S) PIER LIGHTS, MAY BE REQUIRED IF THE LIFT AND PROTECTION PIERS ARE NOT STRAIGHT ON THEIR CHANNEL FACES. THIS LIGHT IS A 180 DEGREE FIXED RED LIGHT MOUNTED IN THE MIDDLE OF THE BRIDGE PIER IN LINE WITH THE BRIDGE AXIS. THIS LIGHT IS CALLED AN:
– "AXIS LIGHT" (identified on the graphic below as "C")
avclsbr.ppt 05/2005 Version 2.1 14
MINIMUM LIGHTING FOR VERTICAL LIFT BRIDGES
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
(EXAMPLE: AS VIEWED FROM UPSTREAM)
NOTE: SOME LIFT BRIDGES, ESPECIALLY THOSE IN AUTOMATIC OR SEMIAUTOMATIC OPERATION, MAY SHOW ADDITIONAL LIGHTS IN BOTH THE U/S DIRECTION AND THE D/S DIRECTION. THESE ARE AUTHORIZED ON A CASE BY CASE BASIS. IN SOME CASES, COAST GUARD LIGHT LISTS AND NEWER CORPS OF ENGINEER CHARTS INCLUDE DESCRIPTIONS AND USAGE OF SPECIAL BRIDGE LIGHTING.
avclsbr.ppt 05/2005 Version 2.1 15
PIER LIGHTING FOR DOUBLE-OPENING SWING SPAN BRIDGES
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
• BRIDGE PIERS AT EITHER END OF THE MOVEABLE BRIDGE SPAN ARE CALLED "DRAW PIERS". EACH DRAW PIER, OR AN ATTACHED PROTECTION PIER IS MARKED BY A 180 DEGREE FIXED RED LIGHT ON BOTH THE DOWNSTREAM (D/S) AND UPSTREAM (U/S) ENDS OF THE PIER. THIS LIGHT IS CALLED A:
– "DRAW PIER LIGHT" or "PIER LIGHT"
• THE BRIDGE PIER IN THE CENTER ON WHICH THE MOVEABLE SPAN SITS IS CALLED THE "PIVOT PIER". THE PIVOT PIER, OR AN ATTACHED PROTECTION PIER IS MARKED BY A 180 DEGREE FIXED RED LIGHT ON BOTH THE DOWNSTREAM (D/S) AND UPSTREAM (U/S) ENDS OF THE PIER. THIS LIGHT IS CALLED A:
– "PIVOT PIER LIGHT"
• A THIRD PIER LIGHT, IN ADDITION TO THE TWO (U/S AND D/S) DRAW OR PIVOT PIER LIGHTS, MAY BE REQUIRED IF THE DRAW OR PIVOT PIERS AND ATTACHED PROTECTION PIERS ARE NOT STRAIGHT ON THEIR CHANNEL FACES. THIS LIGHT IS A 180 DEGREE FIXED RED LIGHT MOUNTED IN THE MIDDLE OF THE APPLICABLE DRAW OR PIVOT PIER IN LINE WITH THE BRIDGE AXIS. THIS LIGHT IS CALLED AN:
– "AXIS LIGHT"
avclsbr.ppt 05/2005 Version 2.1 16
SPAN LIGHTING FOR DOUBLE-OPENING SWING SPAN BRIDGES
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
• THREE LIGHT FIXTURES, EACH CONSISTING OF TWO 60 DEGREE RED LIGHTS AND TWO 60 DEGREE GREEN LIGHTS (SEE DIAGRAM BELOW SHOWING SPAN IN CLOSED POSITION), ARE LOCATED ATOP THE BRIDGE SPAN AT EITHER END AND AT THE CENTER POINT.
• EACH LENS IN A FIXTURE IS LOCATED AT 90 DEGREES FROM ITS ADJACENT LENS AND SHOWS THROUGH AN ARC OF 60 DEGREES. WHEN ONLY THE GREEN LENS ARE SHOWING DIRECTLY UPSTREAM AND DOWNSTREAM FROM THESE FIXTURES, THEN THE BRIDGE WOULD BE IN THE FULLY OPEN POSITION. THIS LIGHT FIXTURE IS CALLED A:
– "SWING SPAN LIGHT"
avclsbr.ppt 05/2005 Version 2.1 17
MINIMUM LIGHTING FOR DOUBLE-OPENING SWING SPAN BRIDGES
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
(EXAMPLE: AS VIEWED FROM UPSTREAM)
NOTE: IN ORDER TO PROPERLY IDENTIFY ANY GREEN SWING SPAN LIGHT DISCREPANCIES ON A CLOSED BRIDGE (OR RED SWING SPAN LIGHT DISCREPANCIES ON AN OPEN BRIDGE), IT WOULD BE NECESSARY TO VISUALLY DETERMINE WHICH DIRECTION THE BRIDGE OPENS (OR CLOSES). HOWEVER, NEVER REQUEST A BRIDGE TO OPEN (OR CLOSE) IF ONLY TO VERIFY BRIDGE LIGHTING.
avclsbr.ppt 05/2005 Version 2.1 18
LIGHTING FOR DOUBLE-LEAF BASCULE BRIDGES
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
• EACH BASCULE BRIDGE PIER IS MARKED BY A 180 DEGREE FIXED RED LIGHT ON BOTH THE DOWNSTREAM (D/S) AND UPSTREAM (U/S) ENDS OF THE PIER. THIS LIGHT IS CALLED A:
– "DRAW PIER LIGHT" or "PIER LIGHT"
• WHEN A THE BRIDGE IS IN ANY POSITION OTHER THAN FULLY RAISED., THE CENTER OF THE BRIDGE SPAN IS MARKED BY TWO 180 DEGREE FIXED RED LIGHTS (ONE ON EACH LEAF SPAN) ON BOTH THE UPSTREAM SIDE AND ON THE DOWNSTREAM SIDE. WHEN FULLY RAISED, THESE LIGHTS SHOW 180 DEGREE FIXED GREEN LIGHTS. EACH OF THESE IS CALLED A:
– "RED LEAF SPAN LIGHT" or "GREEN LEAF SPAN LIGHT"
• A THIRD PIER LIGHT, IN ADDITION TO THE TWO (U/S AND D/S) DRAW PIER LIGHTS, MAY BE REQUIRED IF THE DRAW PIERS AND ATTACHED PROTECTION PIERS ARE NOT STRAIGHT ON THEIR CHANNEL FACES. THIS LIGHT IS A 180 DEGREE FIXED RED LIGHT MOUNTED IN THE MIDDLE OF THE APPLICABLE DRAW PIER IN LINE WITH THE BRIDGE AXIS. THIS LIGHT IS CALLED AN:
– "AXIS LIGHT"
avclsbr.ppt 05/2005 Version 2.1 19
MINIMUM LIGHTING FOR DOUBLE-LEAF BASCULE BRIDGES
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
(EXAMPLE: AS VIEWED FROM UPSTREAM)
avclsbr.ppt 05/2005 Version 2.1 20
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
BRIDGE LATITUDE / LONGITUDE (LAT/LONG) POSITION DATA USING GPS
• FOR FACILITIES THAT HAVE A GPS / DGPS CAPABILITY, AID VERIFIERS ARE ASKED TO:
–VERIFY LAT. / LONG. POSITION DATA THAT IS SHOWN ON THE BRIDGE REPORT WORKSHEET, OR
–PROVIDE LAT. / LONG. DATA IF NOT SHOWN ON WORKSHEET
• A BRIDGE LOCATION IS DEFINED BY THE EXTENT OF THE MAIN CHANNEL WHICH MAY BE MARKED BY EITHER A MAIN CHANNEL PIER LIGHT OR A MAIN CHANNEL MARGIN LIGHT. THE BRIDGE REPORT WORKSHEET ASKS FOR THE LAT. / LONG. COORDINATES FOR BOTH:
THE LEFT DESCENDING MAIN CHANNEL PIER (OR CHANNEL MARGIN), AND
THE RIGHT DESCENDING MAIN CHANNEL PIER (OR CHANNEL MARGIN)
AS VIEWED ON THE DOWNSTREAM SIDE OF THE BRIDGE.
avclsbr.ppt 05/2005 Version 2.1 21
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
BRIDGE LATITUDE / LONGITUDE (LAT/LONG) POSITION DATA USING GPS
• LAT. / LONG. DATA CAN BE SPECIFIED TWO WAYS:
IN DEGREES, MINUTES AND THOUSANDTHS OF MINUTES, OR
IN DEGREES, MINUTES, SECONDS AND HUNDREDTHS OF SECONDS (WHICH IS THE WAY THE DATA IS SHOWN ON THE BRIDGE REPORT WORKSHEETS)
• ALWAYS USE DECIMAL POINTS WHEN RECORDING THE DATA. DASHES OR SPACES MAY BE USED TO SEPARATE DEGREES, MINUTES AND SECONDS. THE FOLLOWING WOULD BE VALID ENTRIES FOR THE SAME POSITION:
45-81.520
45 81.520
45-81-31.20
45 81 31.20
avclsbr.ppt 05/2005 Version 2.1 22
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
BRIDGE REPORT WORKSHEET(TOP OF FORM)
TOP OF BRIDGE REPORT WORKSHEET• SHOWS INFORMATION OF RECORD BASED ON:
LIGHT LIST DATA DATA PREVIOUSLY REPORTED BY AID VERIFIER
• AID VERIFIER ENTERS: TIME(S) AND DATE(S) OF ACTUAL VERIFICATION(S) GPS POSITION DATA (VERIFY IF SHOWN, ENTER IF NOT SHOWN)
avclsbr.ppt 05/2005 Version 2.1 23
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
BRIDGE REPORT WORKSHEET(MIDDLE OF FORM)
NOTES:• ANSWER CLEARANCE GAUGE QUESTION – IF "NO” FOLLOW INSTRUCTIONS ON RIGHT
• FOR ANY DISCREPANCIES, SUCH AS BAD LAMPS, DAMAGED PROTECTION FENDERS / CELLS, UNREADABLE CLEARANCE GAUGES, ENTER SPECIFIC DISCREPANCIES IN LOWER SECTION USING PROPER LOCATION NOMENCLATURE (U/S, D/S, PIER, CENTER, CHANNEL, etc.)
• FOR LIGHT DISCREPANCIES, INDICATE WHETHER RED SQUARE (OR DIAMOND) REFLECTORS ARE SHOWING NEAR THE LIGHT(S)
avclsbr.ppt 05/2005 Version 2.1 24
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
BRIDGE REPORT WORKSHEET(BOTTOM OF FORM)
NOTES:• CHECK "( ) WATCHING PROPERLY" ONLY IF EVERYTHING IS SHOWING PROPERLY
• IF DISCREPANCIES WERE REPORTED VIA RADIO OR PHONE TO GROUP, MAKE ENTRY UNDER SECTION "CRIT. / URG. DISC. REPORTED VIA". (SEE PREVIOUS CHART.)
• ENTER AID VERIFIER IDENTIFICATION (QUALIFIED AID VERIFIERS ONLY) AT BOTTOM.
avclsbr.ppt 05/2005 Version 2.1 25
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
SUMMARY NOTES -- REPORTING BRIDGE DISCREPANCIES
• FOR EACH DISCREPANT LIGHT, REPORT THE – "AS VIEWED FROM" DIRECTION -- "U/S" (Upstream) or "D/S" (Downstream)
– POSITION RELATIVE TO THE CHANNEL -- "Center", "LD" (Left Descending) or "RD" (Right Descending)
– LENS COLOR -- "RED", "GREEN", or " WHITE"
– CHANNEL -- "CHANNEL" (No Alternate Channel), "MAIN CHANNEL" (If Alternate Channel), "ALTERNATE CHANNEL"
– TYPE / LOCATION -- "PIER LIGHT", "PIVOT PIER LIGHT", "SPAN LIGHT", "AXIS LIGHT", "CHANNEL CENTER LIGHT", or "CHANNEL MARGIN LIGHT"
– DISCREPANCY -- "EXTINGUISHED", "DIM", "OUT OF FOCUS", etc.
• EXAMPLES:– U/S LD RED MAIN CHANNEL PIER LIGHT
– D/S RED PIVOT PIER LIGHT
– U/S GREEN ALTERNATE CHANNEL CENTER LIGHT
ALL EXTINGUISHED LIGHTS AND ANY OTHER DISCREPANCY THAT WOULD BE CONSIDERED A HAZARD TO NAVIGATION SHOULD BE REPORTED IMMEDIATELY VIA MARINE RADIO TO THE APPROPRIATE GROUP.
avclsbr.ppt 05/2005 Version 2.1 26
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
SUMMARY NOTES -- REPORTING BRIDGE DISCREPANCIES
• FOR EXTINGUISHED LIGHTS, ALSO INDICATE:– IF THE LIGHT FIXTURE IS VISIBLE
– IF THERE IS A RED REFLECTIVE SQUARE OR DIAMOND LOCATED IN PROXIMITY TO THE LOCATION YOU WOULD EXPECT TO FIND A LIGHT
• REPORT ANY DAMAGE TO BRIDGE PROTECTION CELLS AND FENDERS: – IDENTIFYING THE LOCATION AS YOU WOULD A LIGHT
• REPORT THE READABILITY OF CLEARANCE GAUGES:– "READABLE"– "NOT READABLE" (SPECIFY PIER LOCATION -- D/S or U/S, LD or RD)– "NO GAUGES"
ALL EXTINGUISHED LIGHTS AND ANY OTHER DISCREPANCY THAT WOULD BE CONSIDERED A HAZARD TO NAVIGATION SHOULD BE REPORTED IMMEDIATELY VIA MARINE RADIO TO THE APPROPRIATE GROUP.
avclsbr.ppt 05/2005 Version 2.1 27
I have the following comments regarding the Eighth Western Rivers Region Aid Verifier training presentation "Bridge Verifications and Reporting" (attach copies of marked-up charts as appropriate):________________________________________________________________________________________________
________________________________________________________________________________________________
________________________________________________________________________________________________
________________________________________________________________________________________________
________________________________________________________________________________________________
________________________________________________________________________________________________
Member Empl ID (Auxiliary): |___|___|___|--|___|___|--|___|___|--|___|___|___|___I___I___I___I
Name: ____________________________________________________
Address: __________________________________________________
City: ____________________ State: ____ ZipCode: ______________
E-Mail: ___________________________________________________
EIGHTH WESTERN RIVERS REGION -- AID VERIFIER TRAININGBRIDGE VERIFICATIONS AND REPORTING
INSTRUCTOR / STUDENT COMMENTS FORM
Mail this form to:Michael “Mike” D. Stanley, DSO-NS9539 22nd StreetPerry, Kansas 66073-5056
Or E-Mail: [email protected]