Hochbegabtenförderung in Hessen Hochbegabtenförderung in Hessen.
Autonomic function implemented in existing ITS in Hessen/Germany · 2018-11-26 · Event Management...
Transcript of Autonomic function implemented in existing ITS in Hessen/Germany · 2018-11-26 · Event Management...
20-11-18 1
Autonomic function implemented in existing ITS in Hessen/GermanySusanne Schulz
Utrecht, 14 and 15 November
• The Challenge
• Traffic Control Center Hessen
• Traffic Data Management
• Travel Time Information Services
• Network Control Systems
• Line Control Systems
• Temporary Hard Shoulder Running
• Roadworks/Slot Management
• C-ITS in Hessen
• Current Projects (Future Technologies)
Overview
2
Utrecht, 14 and 15 November
The Challenge
3
Average traffic volume on motorways (vehicles/24hrs):• Germany 52,000 • Hessen 63,400 • Rhine-Main Area 130,000 • Frankfurt Intersection 368,000
Utrecht, 14 and 15 November
Traffic Control Center Hessen
4
Bundling of responsibilities and competencies
Road Traffic Authority for Motorways
Intelligent control and information systems
Traffic Control Center Hessen in 24/7 operation
One of the most efficient traffic control centers in Europe
Utrecht, 14 and 15 November
Traffic Data Management
5
• full-coverage traffic detection with over 3,000 detectors in the motorway network
• video acquisition system with over 300 cameras• DIVA: Continuous traffic modelling and congestion analysis and
determination of travel times • travel times / losses as basis for network control, strategy
management and traffic information
Local Data Collection
Floating Car Data
Roadworks Management
Traffic Data Analysis, Congestion ForecastCongestion Reporter
Event Management
Incident Management
Image Processing
Utrecht, 14 and 15 November
TT Information Service
6
Hessen Online Traffic Information Servicewww.verkehrsservice.hessen.de
dynamic signs with travel time information
Utrecht, 14 and 15 November
Network Control Systems
7
60 dWiSta-displays in automatic control
substitutive signposting at 35 junctions
high acceptance through display of travel times / lost times
Utrecht, 14 and 15 November
Line Control Systems
8
• variable speed limits for harmonisation of traffic flow• speed reduction and danger alert at congestion approach• lane closures for safeguarding of roadworks and accidents• HGV overtaking ban• operation with Hessian control method SARAH• currently 300 km in operation
direction of travel
congestion within reach
congestion
congestion finished
30% decrease of accident rates for accidents involving personal injury20% increase of road capacity10% increase in average travel speeds
Utrecht, 14 and 15 November
Temporary use of hard shoulder
9
currently 100 km in operation in Hessen
25% increase of capacity on a three lane motorway
temporary opening of hard shoulder as additional lane in order to cope with high traffic volumes
Utrecht, 14 and 15 November
Roadworks/Slotmanagement
10
handbook on roadworks
management
assigning ideal time slots for roadworks
DORA: dynamic localization of maintenance work
Utrecht, 14 and 15 November
C-ITS in Hessen
11
DRIVE-Center Hessen
DRIVE-test field Hessen
Utrecht, 14 and 15 November
Current Projects
12
C-ITS Corridor Rotterdam – Frankfurt – Viennadeployment of initial cooperative services: Roadworks warning and Probe Vehicle Data
aFASdevelopment of a fully automated, driverless safeguarding vehicle for short term roadworks on hard shoulders (aFAS)
Ko-HAF – Cooperative highly automated driving testsite for highly automated driving up to 130 km/h on motorways
Thank you for your attention!