Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management...

39
Autodesk 2010 Solution Launch JM Corporation and China Management fecycle Facility Management System with LB

Transcript of Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management...

Page 1: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Autodesk 2010 Solution Launch

JM Corporation and

China Management

Lifecycle Facility Management System with LBIM

Page 2: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

㈱ JM 的公司概要株式会社 JM是前田建设工业株式会社的子公司。

公司名

商标

地址

社长

社员数

合作公司

主要合作金融机构

公司主页

株式会社 JM   (Japan Management)

なおしや又兵衛

〒 102-0083  東京都千代田区麹町 5 丁目4番地 KY 麹町ビル 5 F代表   TEL   03-5275-7048         FAX   03-5276-5321

大竹弘孝

175 名( 2009 年 1 月現在)

250 社

MIZUHO 銀行、三井住友银行

http://www.matabee.com

札幌サービスセンター仙台サービスセンターさいたまサービスセンター千葉サービスセンター東京サービスセンター横浜サービスセンター長野サービスセンター金沢サービスセンター名古屋サービスセンター大阪サービスセンター広島サービスセンター高松サービスセンター福岡サービスセンター

社長

取締役会

取締役室

監査役

海外事業グループ

事業企画グループ

東日本ブロック

関東ブロック

北信越ブロック

中日本ブロック

西日本ブロック

経営管理本部

Engineering 本部 開発設計グループコールセンターグループエンジニアリンググループCM グループ

経営管理グループシステムグループ

組織図

2

Page 3: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

・零售事业部成立( 2000 年)

・株式会社なおしや又兵衛成立( 12 月)

・与 7-11 的业务合作

・电话中心导入事业开

营业开始

・与 Autodesk 公司合作

・ HandyBuz 开发 导入

・与 TDC 公司合作

销售额的增

2001 年度 2002 年度 2003 年度 2004 年度 2005 年度 2006 年度 2007 年度 2008 年度

・特定建设业许可(国土交通大臣许可)

・跻身一级建筑师事务所

・㈱JM设立

100

(億)

80

60

40

20

前田建設零售事业 株式会社 JM

・前田(北京)经营咨询有限公司成立电话中心系统( CCWEB )的开发 Matabee 系统的开发 ・导入

MSP-3D 开发 ・导入

㈱ JM (なおしや又兵衛)的发展2001 年 4 月 2002 年 4 月 2003 年 4 月 2004 年 4 月 2005 年 4 月 2006 年 4 月2007 年 4 月 2008 年 4 月2009 年 4 月

・ BUZZSAW 开发 导入

3

Page 4: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

4

Autodesk Building Information Modeling

Page 5: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

Real Scale Time Range

Planning

Design

Construction

Repair, Maintenance, Management

Demolition

0.5 ~ 3 years 15 ~ 60 years

Building Lifecycle

What’s Important Stage for Customer?

5

Page 6: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

JM’s LFM enables its clients to reduce the total cost through the building life cycle from the planning stage to the Recycle and Reuse stage.

JM LFM SYSTEM

M@tabeeMSP-3D 3D-CAD HandyBuz

LBIM CASE

LBIM

Live ObjectManagement(Real time)

RFID

Start

Cos

t

Low

High

TimeEnd

e-reverse

Plan Design Construction Maintenance Closing

Enabling 3D simulation at affordable cost.

No information gap as the plan is visualized in 3D images.

Ordinary CASE

Standard BIM CASE

Process DATA

Operation DATA

6

※※ManifestASP Service

Page 7: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

BPM BOM

Building Information Models Building Process Models Building Operation Models

BiM

Architecture

MEP Structure Construction FM

Go to the Future

Back to the Past

Lifecycle Facility Management System with LBIMLifecycle Building Integrated Models

3D3D 4D4D 5D5D

+ +

BiM + BPM + BOMInformation Process OperationBiM to LBIM

LBIM

LBIM

Online “5D-LBIM” Enable Facilities Overall Lifecycle Management- (Design, Operation, Maintenance, Repair, Overhaul)

BiM RFID RFID

LBIM

(3D+Time) (4D+OperationDB)

7

Σ Σ

Page 8: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

● Auto Design System

Architecture

MEP Structure Construction

FM

Go to the Future

Back to the Past

Lifecycle Facility Management System with LBIMLifecycle Building Integrated Models

3D3D 4D4D 5D5D

LFM

Maintenance and Repair, Rebuild

<MSP-3D>

<JeT-BUZ>

M@tabee Data Base

● Enterprise Resource Planning System for SEJ and PCa-Buildings

<Standard BIM><RFID>

Design Construction Maintenance and Repair, Rebuild

<JeT-BUZ> <RFID><Standard Drawings produced from BIM>

<CCWEB> <FM-WEB>

JM-SEJ Real-time Facility Maintenance Solution – PROTOTYPE PROJECT

BiM

<S-Page>

BiM to LBIM

<HandyBUZ>

RFID

RFIDRFID

Annual BIM Modeling and Updating Services for 711 Standard Shop

<>:Developed

<>:developing

<HandyBUZ><S-Page>

Blue letters :Plan to develop

RFIDRFID

8

Page 9: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

Real Estate Plan Design Construction + Time ・Cost

Repair

SiteSurvey

Site Planning

Detail Planning

Construction Planning

Maintenance + Management

Demolition

3DMax Revit Series WorkFlow ,Bid HandyBuz Map3DMSP-3D

3DGround upSimulation

3DIn(Ex)teriorSimulation

Building Information  

   Modeling

4D (3D+time)&5D (3D+Data)

Real TimeCheckingScheduling

On TimeReportingWith Mobile

Map linkageWithData Base

VisualizeSite Info

With MSP-3D

DWF 、 Movie

JMBLD0001

Early STPlanDesignConstructionRepairMaintenance+Manage

Closing

Maintenance + Management

Reuse ・    Recycle

E-reverse

JMBLD0001

Early STPlanDesignConstructionRepair

Maintenance+ManageReuse ・Recycle

LBIM

Intent ,NavisWorks

S-page System with Autodesk BUZZSAW

Construction

Inspection

JMBLD0001

Early ST

JMBLD0001

Early STPlanDesignConstruction

MSP-3D CCWEBHandyRep

S-page

4D・5DWebCamera

HandyBUZ

New Architectural Style of Lifecycle Stages

RFID

Passage of Time

Life cycle Management

Linked Backbone M@tabee DB

RFIDRFID

9

Page 10: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

MSP-3D

10

土量計算への活用

Page 11: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

MSP-3D

11

市街地店舗シミュレーション(看板視認性)への活用

Page 12: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

Standard BIM Maintenance

JM 711 Standard BIM Data-Maintenance

12

Page 13: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

Content

SchemeAL703

SchemeBL703

SchemeCL703

Shop furniture Structure snapshot

Page 14: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

Scheme AL703 – Architectural

Page 15: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

Scheme AL703 – Structural

Page 16: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

Scheme AL703 – Shop Furniture

Return

Page 17: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

Scheme BL703 – Architectural

Page 18: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

Scheme BL703 – Structural

Page 19: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

Scheme BL703 – Shop Furniture

Return

Page 20: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

Scheme CL703 – Architectural

Page 21: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

Scheme CL703 – Structural

Page 22: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

Scheme CL703 – Shop Furniture

Return

Page 23: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

Revit Shop Furniture

购物篮 ( カゴ ) 货架 ( ドリンクケース ) 货架 ( ドリンクケース )

试衣间 ( 更衣用 ) 四门衣柜 ( ロッカー ) 收银机 ( レジ )

Page 24: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

Revit Shop Furniture 2

ドリンクケース 水槽 ( 二槽シンク ) 外部仓库

弁当 & チルド 冰箱 ( アイスクリームケース ) 大

冰箱 ( アイスクリームケース ) 小

Page 25: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

Revit Shop Furniture 3

冷柜(チルドケース) 冷冻库 洗濯機

烘烤箱 ( ホットショーケース )

電子レンジ 卤食器皿 ( おでん )

Page 26: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

Revit Shop Furniture 4

围栏 杂志架 ( マガジン ) 热水壶 ( ポット )

热饮料 (カンペットウォー

マー)

货柜 室外招牌

Return

Page 27: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

Revit Structure Details Snapshot

Page 28: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

Revit Structure Details Snapshot

Page 29: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

Revit Structure Details Snapshot

Return

Page 30: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

HandyBUZUnderstanding of Current situation by Mobile phone with digital photo

Internet Connection

Photo by Maintenance Staff

Estimation Mobile Phone

Maintenance Work BUZZSAW

30

Page 31: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

ASP

It can be submitted immediately by easy operation from a work site by operational proving and the system to make a report using a camera-equipped mobile phone for proof, and it's important not to can alter the location, time, a maker and a picture dishonestly.

HandyBUZ

・ Need Paper work

・ Do not need paper work

・ Quick Submission Efficiency of Total Process

Conventional (Current)

Now

Research ・ Check SubmissionQuote ・ Report Making

31

Page 32: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

CCWEB

• Can report problems

   via call center• The information is gathered

   in MatabeeD/B• And accessible via internet

32

Page 33: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

-Customer Name-Address-Phone Number-District

Customer Information

Code Received Date Description Contractor Status Estimate

Call center

NEXT PAGE

CCWEB

Shop Manager

33

Page 34: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

Project Referral

Project NumberReception Time

Actual ReceptionReception Type

Store Customer Name

UrgencyDamaged Equipment

Detail of Damage

Process Date/Time

Design AlternationReception GroupReceptionist NumberControl StatusSolicitor Position Repair Part

Delivery AgentAgent NameCompletion Time

StatusDescription of DamageCompletion Time

Reception GroupReceptionist

Solicitor NameSolicitor Title

Shop Manager

Call center

CCWEB

34

Page 35: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

CCWEB+HandyBUZ

35

Page 36: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

SEJ Closing Project

Final treatment

Asset clearing

Permission of Transshipping

& keeping

refitting

Reusable objects

Closing store

waste( including

reusable objects )

First treatment

waste

removing

Facility-utensil(reuse )

Steel etc.( recycle )

Certification publication

makers

New store

Certification publication

Certification publication

RFID

RFID

RFID

RFIDRFID

RFID

RFID

RFID

Manifest

Manifest Manifest

RFID

Test Item

JM

i360M@tabee

RFIDCCWEB

700 Shops/year

36

Page 37: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

BPM BOM

Building Information Models Building Process Models Building Operation Models

BiM

Architecture

MEP StructureConstruction FM

Lifecycle Facility Management System with LBIM

+ +

BiM + BPM + BOMInformation Process Operation

BiM to LBIM

LBIM

Online “5D-LBIM” Enable Facilities Overall Lifecycle Management- Design, Operation, Maintenance, Repair, Overhaul

LBIM

Architecture

MEP Structure

Lifecycle Building Integrated Models

LBIMRFID

RFID

BiM

RFID

RFID

37

Page 38: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

End

38

前田(北京)经营咨询有限公司100004北京市东城区东长安街 33号北京饭店 D 座 4311B 室TEL +86-10-6551-6093/FAX +86-10-6553-5396

株式会社  JM1020083東京都千代田区麹町 5-4   KY 麹町ビル 5F

TEL +81-3-5276-5185/FAX +81-3-5276-5321

Page 39: Autodesk 2010 Solution Launch JM Corporation and China Management Lifecycle Facility Management System with LBIM.

Hong Kong2009

Simulation

39