Australian PV
Association
The Highs & Lows of the PVMarket in Australia
Dr Muriel WattSchool of PV and RE Engineering
University of NSWand
Chair, Australian PV Association
ATRAA 2008
Outline
• Current PV Market in Australia andInternationally
• Key Australian support Programs
• Cost and Price Trends
• A Feed-in Tariff for Australia?
• PV Opportunities for Australia
Australian PV
Association
Australian and International PVMarkets
Photo: GSES Ghana
ATRAA 2008
Development of the Australian PVMarket (APVA, 2008)
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
Cu
mm
ula
tive k
W
off-grid domestic off-grid non-domestic grid-connected distributed
grid-connected centralized diesel grids
ATRAA 2008
Australia Compared to Other KeyPV Markets (PVPS, 2008)
ATRAA 2008
Annual Installations in Key PVCountries (PVPS, 2008)
2007 Total: 2.8 GW2012 Forecasts: 6-16 GW
ATRAA 2008
Annual Australian PV Installations(APVA, 2008)
0
2
4
6
8
10
12
14
1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007
An
nu
al
MW
Total
PVRPOlympic Site
Australian PV
Association
Key Australian Support Programs
Photo: Ergon, Lingara
ATRAA 2008
PV Installations and Contributions2007/08
• Installations– PVRP ~18MW
– RRPGP ~ 8MW
• GreenPower (NGAP, 2008)
– 49 systems
– 3070 MWh
• MRET (ORER, 2008)
– 32 accredited stations
– 8402 RECs
Photo: Simon Troman
ATRAA 2008
Evolution of the PV Rebate(Solar Homes & Communities)
• Commenced in 2000 and currently funding likely tobe used by 2009
• Rebates on PV capital costs for householders orcommunity building owners
• Householder rebate $5.50 then $4 now $8/Wp.• Community buildings 50% rebate capped at 2 kWp• Schools now separtely funded• > 13,000 systems and > 18 MWp of PV (73% grid
connected) have been installed and rebates of over$100M provided
ATRAA 2008
Solar Homes & Communities Statistics(AGO, 2008)
Watts Installed by Month
to April 2008
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
2000 2001 2002 2003 2004 2005 2006 2007 2008
Grid Watts SAP Watts
ATRAA 2008
Renewable Remote PowerGeneration Programme (RRPGP)
• Commenced in 2000 with $205M over 10 years for REreplacing diesel in RAPS, public generators & mini-grids
• Extended by $123M in 2006, reduced by $42M in 2008
• Currently funded to 2011 (~$120M remaining)
• To end 2007: 8.37MW PV
• Grants up to 50% of the capital value of RE components
• Some administered & topped up by States and Territories
• Sub-programmes:– Bushlight - for small remote aboriginal community RE systems in, plus
training and awareness
– RESLab - RE systems test centre, Murdoch Uni, Perth.
– PV Water Pumping
– Major projects (>$200,000)
13
Remote PowerStations
Solar System’s 220 kWpconcentrator system(Pitjantjatjara, SA)
Bushlight EnergyManagement Unit
ATRAA 2008
Bushlight Home Systems
ATRAA 2008
Solar Cities• $93.8M over 5 years to demonstrate high
penetration uptake of solar technologies, energyefficiency, smart metering
• aimed at improving the market for distributedgeneration and demand side energy solutions
• Adelaide, Townsville, Blacktown, Alice Springs,Central Victoria, Perth and Coburg– Solar Cities consortia are working with industry, businesses
and their local communities to rethink the way theyproduce and use energy
– valuable information and lessons to inform future energyand greenhouse policies
– Household and some larger commercial and public PVsystems, with grants, special loans and feed-in tariff inAlice Springs
ATRAA 2008
The Low Emissions Technology andAbatement (LETA) Fund
• $26.9M to reduce greenhouse gas emissions overthe longer term
• For identification and implementation of costeffective abatement opportunities and the uptakeof small scale low emission technologies inbusiness, industry and local communities.
• Support for renewables via an industrydevelopment sub-programme available to Stateand Territory Government agencies andrenewable energy industry associations
ATRAA 2008
National Solar Schools Program(Ref: Aust Gov Dept of Climate Change, 2008)
• Schools programs originally at State level and withPVRP funding
• New Program: $489 million - all schools eligible
• grants up to $50,000 to install min 2 kW PV– 20MW (2.5MW per year for 8 years?) and:
– lighting upgrades
– sky lights
– shade awnings
– solar hot water systems
– rainwater tanks
ATRAA 2008ABARE, 2008
MRET32 accredited solar stations 8402 RECs to date
Australian PV
Association
Cost and Price Trends
Greenpeace, 2006
ATRAA 2008
2007 Module and Grid System Prices(PVPS, 2008)
ATRAA 2008
2007 and Projected 2010 Module Costs(Photon, 2008)
0
0.5
1
1.5
2
2.5
3
3.5
2007
Typical
2010
Typical
2007 Av 2010 Av 2007
Best
2010
Best
2007
Thin-
Film
US
$/W
Module
Cell
Wafer
Si
ATRAA 2008
-
2
4
6
8
10
12
14
16
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
Country #1 modules
Country #1 systems
Country #2 modules
Country #2 systems
Country #3 modules
Country #3 systems
Constant
USD/W
PV module and system prices in selected PVPS countries (PVPS, 2007)
ATRAA 2008
Module price trends - not corrected for inflation
0.00
2.00
4.00
6.00
8.00
10.00
12.00
1999 2000 2001 2002 2003 2004 2005 2006
US
D
AUS CAN DEU JPN KOR NLD USA
(PVPS, 2007)
ATRAA 2008
PV Electricity Costs (Photon, 2008)
0
5
10
15
20
25
30
35
40
2007
Typical
2010
Typical
Av 2007 Av 2010 Best 2007 Best 2010
US
c/k
Wh
High Sun
Low Sun
Australian PV
Association
An Australian Feed-in Tariff?
Photo: Energy Australia, Kogarah
Photo: STI, Melb Uni
ATRAA 2008
Feed-in Tariff (FiT) Principles• Electricity buy-back rate which provides payback within the life of the
system / scheme
• First used in California in the 1970s (PURPA) and then Austrian localgovernment in 1980s (rate based incentives)
• Enhanced tariff is mandated and paid for via a levy on electricity sales(sometimes from Government budgets)
• Can be paid on total generation, generation net of customer usage, up to aset limit, time of generation etc
• Tariff for the year of installation is guaranteed for a set period, typically 15to 20 years, but can be as low as 5 years
• Can attract huge investment in renewables if appropriately structured
• Now available in 37 countries and various States
ATRAA 2008
German PV market growth(EPIA, 2005)
ATRAA 2008
FiT Issues• Too high a Tariff (as for grants!)
– creates high demand
– increases prices if supply constrained
– restricts uptake in non-subsidised markets
– pressure to use unskilled labour
– pressure to use uncertified products
– leaves industry vulnerable to change
• Net export– Need large systems / small loads / minimum day load
• Could exacerbate evening peak
– Difficult to calculate cost effectiveness
• MW Caps or short timeframe– Boom and bust cycle
ATRAA 2008
Australian FiTs
• ACT – 3.88X tariff, 10 years, 10 kW
• SA - 44 c/kWh net export , 2028
• Qld – 44 c/kWh net export(10 years, 8MW or 2028)
• Vic - 60 c/kWh net export, 2 kW, 15 years
• Energy Australia - 28 c/kWh(net export, 2-8pm)
• Alice Springs Solar City – 45 c/kWh grossgeneration, 10 years, limit of $5 per day
ATRAA 2008
Implementation Issues for anAustralia FiT
• Likely public take-up?– Green interest, local self reliance, disposable income,
age profile– Depends on FiT structure and PV rebates– $4 PVRP ~ 28 c/kWh FiT (above retail price) => steady
uptake– $8 PVRP ~ 48 c/kWh => rapid uptake
• Utility response - OK with small penetrations,more issues once PV starts to be noticeable
• Gross FiT not compatible with net metering need for electronic or 2nd meter
• Net FiT – unknown earnings projections
ATRAA 2008
PV export vs system size and load(APVA & CEEM, 2007)
ATRAA 2008
FiT income vs system size fordifferent types of FiTs
(APVA & CEEM, 2007)
ATRAA 2008
Electricity Price Development Curves for PV and Residential Mains Tariff
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Year
Co
mp
ara
tive E
lectr
icit
y P
rices
Distributed Grid-con PV LEC ($/kWh) PV LEC w ith RECs ($/kWh) Retail Electric ity Price (10% pa increase) $/kWh
Retail Electric ity Price (4% pa increase) $/kWh Retail Electric ity Price (6% pa increase) $/kWh
$4 PVRP
$8 PVRP
Electricity and PV Price Trends
ATRAA 2008
The preferred FiT Model
• Nationally consistent FiT above electricity tariff• Initial starting tariff should aim to repay capital cost over a
FiT time period of 15-20 years• Tariff should decrease by 5-10% each year
– Eg. start at 50 c/kWh above retail tariff (~66 c) and decreases at10%pa => zero within 10 years and hence has a defined end date
• FiT cost should be covered by customer levy, rather thangovernment budget
• All customer sectors should be eligible (but may excludelarge industry)
• Levy should be spread across all customer types (butcould avoid the more sensitive large industry sector)
• No cap• Payment on total generation
Australian PV
AssociationPV Opportunities for Australia
Photo: BP Solar Greenbridge
ATRAA 2008
Current and Projected Energy Usein Australia (ABARE 2007)
ATRAA 2008
Clean Edge 2006
ATRAA 2008
PV support frameworks
• Renewable portfolio standards• Direct capital subsidies• Green electricity schemes• Enhanced feed-in tariffs• Manufacturing incentives• Government procurement• Tax Credits• Building regulations
plus emerging mechanisms…Preferential home mortgage termsGreen loans from commercial banksShare offerings in private PV investment funds
ATRAA 2008
Silicon feedstock
Wafers & ingots
Cells
Modules
PV power systemsBOS components
Thin filmprocesses
Financing & project
development
Investmentsin, and
equipment for,manufacturing
PV supply chain – can Australiaextend its scope?
ATRAA 2008University of NSW
Launch 12 August
ATRAA 2008
References• ABARE, 2007: Syed, A., Wilson, R., Sandu, S., Cuevas-Cubria, C. and Clarke, A., Australian
Energy: National and State Projections to 2029-30, ABARE Research Report 07.24, Departmentof Resources, Energy and Tourism, Canberra, December
• ABARE, 2008, Energy in Australia 2008, Dept of Resources, Energy & Tourism, Comm of Aust.,abare.gov.au.
• Australian Government Department of Climate Change, 2008, Climate Change BudgetOverview 2008-09, May 2008.
• Australian Greenhouse Office, 2008,http://www.environment.gov.au/settlements/renewable/pv/index.html#statistics
• Australian PV Association, 2008, PV in Australia 2007.• Australian PVPS Consortium and CEEM, 2007, Submission to the SA Government Discussion
Paper on South Australia’s Feed-in Mechanism for Residential Small-Scale Solar PhotovoltaicInstallations.
• Clean Edge, 2006, Clean Energy Trends 2006, www.cleanedge.com• EPIA, 2005, Position Paper on Feed-in Tariffs for PV Solar Electricity• Greenpeace & EPIA, 2006, Solar Generation; Solar Electricity for over 1 Billion People and 2
million jobs by 2020• National GreenPower Accreditation Program (NGAP), 2008, Quarterly Status Report, 1
October to 31 December 2007, www.greenpower.gov.au• ORER, 2008, Increasing Australia’s Renewable Energy Generation, Annual Report 2007.• Photon International, 2008, Refining Benchmarks and Forecasts, Issue 1/2008, pp. 84-94• PVPS, 2008, Trends in Photovoltaic Applications 1992-2007, Draft Report.