Aula Timur 1
-
Upload
mohd-qisti -
Category
Documents
-
view
215 -
download
0
Transcript of Aula Timur 1
-
8/14/2019 Aula Timur 1
1/5
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY
TABLE OF CONTENT
NO. CONTENT PAGE NO.
1 LIST OF FIGURE ii2 ACKNOWLEDGEMENT iii
3 OBJECTIVE iv
4 METHODOLOGY v
5 CHAPTER 1: INTRODUCTION 1
6 CHAPTER 2: DESCRIPTION OF PROPERTY 2
7 CHAPTER 3: LOCATION 3
8 CHAPTER 4: CONSTRUCTION AND CONDITION 5
9 CHAPTER 5: SERVICES 30
10 CHAPTER 6: ENVIRONMENTAL AND OTHER ISSUES 32
11 CHAPTER 7: OUTBUILDINGS, GROUNDS AND
BOUNDARIES
34
12 CHAPTER 8: SURVEYORS OVERALL ASSESSMENT 35
13 REFERENCES 40
14 APPENDICES 41
LIST OF FIGURE
NO. FIGURE
1. Figure 1.0: pie chart of defects categories
2. Figure 2.0: pie chart of defects types
3. Figure 3.0: pie chart of defects elements
4. Figure 4.0: pie chart of remedial for defects
5. Figure 5.0: plant growth at gutter
6. Figure 6.0: inaccessible room
7. Figure 7.0: socket at floor
8. Figure 8.0: no floor covering
9. Figure 9.0: crack at drain
10. Figure 10.0: crack at drain
i
-
8/14/2019 Aula Timur 1
2/5
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY
11. Figure 11.0: window that surrounds the building
12. Figure 12.0: ventilation at wall
13. Figure 13.0: ventilation at below roof level
ACKNOWLEDGEMENT
Alhamdulillah, with this, it is a remark, shown that all of our effort had been
accomplished.
A big thank you to all our lecturers. Dr Sr Azlan Shah Ali, Dr Sr Syahrul Nizam
Kamaruzzaman, Pn Sr Rodiah Zawawi, Miss Noor Suzaini Mohamed Zaid for being
our guidance and help during the whole process of finishing up this task. Not
forgetting, the lecturers effort and help during our surveying process in Bandung,
Indonesia. From reading the teodolite to look after our health, a big thanks you again
to all.
Not forgetting to all the people weve met in Bandung, Indonesia, throughout
the week weve passed through. Their guidance and confrontation had helped us a
lot in elaborations about our task.
Lastly, a big thank you to the entire group members, which had given their
110% cooperation throughout the task.
ii
-
8/14/2019 Aula Timur 1
3/5
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY
OBJECTIVE
In order to maintain a building from defect failures and leads to structural
damages, a proper maintenance work is needed. Objective is needed so that the
owner of the regarded building should know what has to be given extra attention.
By analyzing the defects throughout the process of accomplishing this task,
there are several objectives can be list down:
i. To recognize types of defect failures at the external and internal
components of the regarded building.
ii. To categories the types of defect into several parts, from there a person
can know where to give extra attention before the defect leads to serious
damage.
iii
-
8/14/2019 Aula Timur 1
4/5
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY
iii. To suggest proper recommendations to fix the defect failures as this will
prevent future failure occur.
iv. Defect analysis will help maintaining the building structure and this will
give good view image to outsiders.
METHODOLOGY
During the process of investigating and surveying, there were several
methods had been used in order to achieve the objective of analyzing the regarded
building. Equipments and tools had been provided for professionally used.
First of all, task was divided into small categories and into sub-groups. This is
to make the task easier and all data can be produce at the end of the process. Using
iv
-
8/14/2019 Aula Timur 1
5/5
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY
the equipments and tools need skills. Each equipment has its own function. Eg;
moisture meter is being used to check the amount of humidity of a regarded material.
A theodolite is being used to get the height of a building. When all data such as the
height, length and etc had been produce, these data will be analysis and forms a
whole report of analyzing.
v