Kinetik Partners | C O N F I D E N T I A L Kinetik Partners August 3, 2011 Innovative Manufacturing and Supply Chain Concepts Dan Radomski [email protected] , 248-721-3192 Sandia National Laboratories Wind Turbine Reliability Workshop

Transcript of August 3, 2011 Innovative Manufacturing and Supply Chain...

Page 1: August 3, 2011 Innovative Manufacturing and Supply Chain ...energy.sandia.gov/wp-content/gallery/uploads/2-C-1-Radomski.pdf · Kinetik Partners | C O N F I D E N T I A L Kinetik Partners

Kinetik Partners | C O N F I D E N T I A L

Kinetik Partners

August 3, 2011

Innovative Manufacturing and Supply Chain Concepts

Dan Radomski

[email protected], 248-721-3192

Sandia National Laboratories – Wind Turbine Reliability Workshop

Page 2: August 3, 2011 Innovative Manufacturing and Supply Chain ...energy.sandia.gov/wp-content/gallery/uploads/2-C-1-Radomski.pdf · Kinetik Partners | C O N F I D E N T I A L Kinetik Partners

1© Kinetik Partners www.kinetikpartners.com Sandia Wind Turbine Reliability Workshop - Radomski

Kinetik PartnersBusiness and Technology Innovation

Experienced consulting firm specialized in wind technology

commercialization and manufacturing innovation

Technology and Business Development Strategy

– Market entry options

– Value chain analysis

– Technology road mapping and futuring

– Commercialization and R&D strategy

– Cost modeling and profit pool analysis

– Business model innovation

Strategic Brokering

– Strategic partnerships: teaming agreements, technology transfer, JV,

JDA, licensing product rights, go-to-market partners

– Corporate venturing

– Collaborative R&D program development

– Financing strategy (state, federal, private investment)

Page 3: August 3, 2011 Innovative Manufacturing and Supply Chain ...energy.sandia.gov/wp-content/gallery/uploads/2-C-1-Radomski.pdf · Kinetik Partners | C O N F I D E N T I A L Kinetik Partners

2© Kinetik Partners www.kinetikpartners.com Sandia Wind Turbine Reliability Workshop - Radomski

Approach – Kinetik Innovation ProcessKIP Allows Industry and Regions to Develop Competitiveness Programs

Market Intelligence Supply Chain Dynamics

Technology Evolution Strategy Development and Execution

Market and Product Segmentation

Present and Future Value Chain

Confidential

2

Page 4: August 3, 2011 Innovative Manufacturing and Supply Chain ...energy.sandia.gov/wp-content/gallery/uploads/2-C-1-Radomski.pdf · Kinetik Partners | C O N F I D E N T I A L Kinetik Partners

3© Kinetik Partners www.kinetikpartners.com Sandia Wind Turbine Reliability Workshop - Radomski

Wind Turbine Product Development DriversWhat is Driving Innovation?

Driver:LCOE

Improve Performance

Improve Reliability

Reduce Mfg Cost and Introduce

Automation

Reduce Logistics

Cost

Reduce O&M Cost

Turbine Size Scale Up

Page 5: August 3, 2011 Innovative Manufacturing and Supply Chain ...energy.sandia.gov/wp-content/gallery/uploads/2-C-1-Radomski.pdf · Kinetik Partners | C O N F I D E N T I A L Kinetik Partners

4© Kinetik Partners www.kinetikpartners.com Sandia Wind Turbine Reliability Workshop - Radomski

Utility Wind Turbines – Scaling up in SizeIndustry Trends

Source: EWEA

Page 6: August 3, 2011 Innovative Manufacturing and Supply Chain ...energy.sandia.gov/wp-content/gallery/uploads/2-C-1-Radomski.pdf · Kinetik Partners | C O N F I D E N T I A L Kinetik Partners

5© Kinetik Partners www.kinetikpartners.com Sandia Wind Turbine Reliability Workshop - Radomski

Turbine Technology Offer Overview

OEMSub-2 MW Segment

(MW)

2 MW to 3 MW

Segment (MW)

3 MW and

Above (MW)

Offshore Segment

(MW)

Vestas V52 (.85), V82 (1.65) V80 (2.0), V90 (1.8 and 2.0) V112 (3.0), V90 (3.0) V90 (3.0), 6.0, 7.0

GE Wind 1.5s,1.5sl, 1.5sle (1.5),1.6 2.5xl(2.5) 4.0

Gamesa

AE-59 (.8), G52 and G58 (.85),

G66 (1.65)

G80 (2.0), G87 (2.0), G90

(2.0) GX (4.5-6) 5.0

Enercon

E-33 (.33), E-48 and E-53 (.8), E-

44 (.9) E-82 (2.0), E-70 (2.3) E-112 (4.5), E-126 (6.0) 7.5

Suzlon S52 (.6), S64 and S66 (1.25) S82 (1.5), S88 (2.1)

Siemens SWT-1.3-62 (1.3)

SWT-2.3-82 VS (2.3), SWT-

2.3-93 (2.3) 3.0 DD SWT-3.6-107 (3.6)

Sinovel 70 and 77 (1.5) 3000 (3.0) 3000 (3.0)

Acciona AW 1500 (1.5), AW-82 1500 (1.5) AW 3000 (3.0)

Goldwind

S43 (.6), S48 (.75), S62 (1.2), S70

and S77 (1.5), S82 (1.5) 2.5 3.0 3.6

Nordex S70 (1.5)

N90 (2.3), N80 (2.5), N90 HS

(2.5), N90 LS (2.5), N100

(2.5) N90 offshore (2.5)

Dongfang 70 and 77 (1.5) 3.0 10.0

Driver Cost Driver Efficiency-Reliability

Source: EERE & Kinetik Partners

Page 7: August 3, 2011 Innovative Manufacturing and Supply Chain ...energy.sandia.gov/wp-content/gallery/uploads/2-C-1-Radomski.pdf · Kinetik Partners | C O N F I D E N T I A L Kinetik Partners

6© Kinetik Partners www.kinetikpartners.com Sandia Wind Turbine Reliability Workshop - Radomski

Wind Turbine Scaling – Innovation Driver

M = 2.2692 (D2.5318)

M = Tower Head Mass (kg)

D = Rotor Diameter (m)

Source: NREL

75

80

85

90

95

100

105

110

115

120

3 5 7

Ro

tor

dia

mete

r (m

)

Rotor Power Rating (MW)

Wind Turbines Sizes

80 m Height

120 m Height

150 m Height

Current turbines designs (80m)

~ Δ 30%

Page 8: August 3, 2011 Innovative Manufacturing and Supply Chain ...energy.sandia.gov/wp-content/gallery/uploads/2-C-1-Radomski.pdf · Kinetik Partners | C O N F I D E N T I A L Kinetik Partners

7© Kinetik Partners www.kinetikpartners.com Sandia Wind Turbine Reliability Workshop - Radomski

Reliability of Wind Turbine Components – Innovation Driver

Source: Historical European Experience – Paul Kuhn, ISET

0 0.1 0.2 0.3 0.4 0.5 0.6 0.7

Electrical System

Electronic Control

Sensors

Hydraulic System

Yaw System

Rotor Blades

Mechanical Brake

Rotor Hub

Gearbox

Generator

Housing

Drive Train

Annual Failure Frequency

0 2 4 6 8 10 12

Electrical System

Electronic Control

Sensors

Hydraulic System

Yaw System

Rotor Blades

Mechanical Brake

Rotor Hub

Gearbox

Generator

Housing

Drive Train

Down Time per Failure (in days)

Page 9: August 3, 2011 Innovative Manufacturing and Supply Chain ...energy.sandia.gov/wp-content/gallery/uploads/2-C-1-Radomski.pdf · Kinetik Partners | C O N F I D E N T I A L Kinetik Partners

8© Kinetik Partners www.kinetikpartners.com Sandia Wind Turbine Reliability Workshop - Radomski

Wind Turbine System Design Innovation

GE 4.0MW Direct Drive

Alstom Load Mitigating DesignSource: GE, Alstom

Page 10: August 3, 2011 Innovative Manufacturing and Supply Chain ...energy.sandia.gov/wp-content/gallery/uploads/2-C-1-Radomski.pdf · Kinetik Partners | C O N F I D E N T I A L Kinetik Partners

9© Kinetik Partners www.kinetikpartners.com Sandia Wind Turbine Reliability Workshop - Radomski

Wind Turbine System Design InnovationDrivetrain Architecture Evolution

Integrated Gearbox + Multi-pole & PM Mid-Speed Generators

+ Full ConvertersDFIG + Partial Converters

Clipper GamesaVestas

M-Torres NPS

Geared

Systems

Enercon

Direct

Drive

Systems

Page 11: August 3, 2011 Innovative Manufacturing and Supply Chain ...energy.sandia.gov/wp-content/gallery/uploads/2-C-1-Radomski.pdf · Kinetik Partners | C O N F I D E N T I A L Kinetik Partners

10© Kinetik Partners www.kinetikpartners.com Sandia Wind Turbine Reliability Workshop - Radomski

Blade Scaling – Innovation DriversLarger blade design drives advanced manufacturing and design innovation

0

20000

40000

60000

80000

100000

120000

140000

160000

180000

0 20 40 60 80 100 120

Ap

pro

x B

lad

e W

eig

ht

(kg

)

Blade Length ( meters )

Historic trend y=1.5336X^2.3183

Balanced

Scallng

Can this be

achieved?O

nsh

ore

Lim

it?Future Offshore – What size?

Page 12: August 3, 2011 Innovative Manufacturing and Supply Chain ...energy.sandia.gov/wp-content/gallery/uploads/2-C-1-Radomski.pdf · Kinetik Partners | C O N F I D E N T I A L Kinetik Partners

11© Kinetik Partners www.kinetikpartners.com Sandia Wind Turbine Reliability Workshop - Radomski

Gearbox Reliability – Innovation Driver

A significant amount of R&D is currently going into gearbox reliability

11

Source: NREL

Current gearbox life is 6-8 years of operation versus 20 year of design expectancy

Page 13: August 3, 2011 Innovative Manufacturing and Supply Chain ...energy.sandia.gov/wp-content/gallery/uploads/2-C-1-Radomski.pdf · Kinetik Partners | C O N F I D E N T I A L Kinetik Partners

12© Kinetik Partners www.kinetikpartners.com Sandia Wind Turbine Reliability Workshop - Radomski

Wind Turbine Generator Reliability - Innovation Driver

Statistics were collected from 1,200 repair operations

12

SMALL GENERATORS MEDIUM GENERATORS

LARGE GENERATORS

Represents most current utility scale turbine

designs

Source: Shermco

Page 14: August 3, 2011 Innovative Manufacturing and Supply Chain ...energy.sandia.gov/wp-content/gallery/uploads/2-C-1-Radomski.pdf · Kinetik Partners | C O N F I D E N T I A L Kinetik Partners

13© Kinetik Partners www.kinetikpartners.com Sandia Wind Turbine Reliability Workshop - Radomski

Wind Tower Innovation Drivers

Cost Drivers Governing Equations

Materials

Manufacturing

Transportation

Assembly

Mass Reduction

Section Modulus Improvement

Page 15: August 3, 2011 Innovative Manufacturing and Supply Chain ...energy.sandia.gov/wp-content/gallery/uploads/2-C-1-Radomski.pdf · Kinetik Partners | C O N F I D E N T I A L Kinetik Partners

14© Kinetik Partners www.kinetikpartners.com Sandia Wind Turbine Reliability Workshop - Radomski

Wind Turbine Transportation & Logistics Innovation

Next Gen Blade & Tower Transportation &

Material Handling Systems

Source: Vestas, LM

Page 16: August 3, 2011 Innovative Manufacturing and Supply Chain ...energy.sandia.gov/wp-content/gallery/uploads/2-C-1-Radomski.pdf · Kinetik Partners | C O N F I D E N T I A L Kinetik Partners

15© Kinetik Partners www.kinetikpartners.com Sandia Wind Turbine Reliability Workshop - Radomski

Offshore Wind Innovation Drivers - Cost

Key Points

Turbine hardware is only 1/4 of offshore capital costs

Lack of deployment and experience in U.S. waters drives up risk premiums

Balance‐of‐system, installation, and O&M are key opportunities for lowering costs

Cost structures favor larger turbines per platform

Source: DOE

Turbine, 27%

Electrical Infrastructure, 11%

Support Structure, 13%

Logistics and Installation, 10%

Project Development and Permits, 4%

Other Capital Costs, 3%

O&M, 20%

Other Variable Costs, 11%

DOE 20% by 2030 Goal:

305 GW total includes 54 GW of

offshore wind

54 GW at 7‐9 ¢/kWh by 2030

(10 GW at 10 ¢/kWh by 2020)

Page 17: August 3, 2011 Innovative Manufacturing and Supply Chain ...energy.sandia.gov/wp-content/gallery/uploads/2-C-1-Radomski.pdf · Kinetik Partners | C O N F I D E N T I A L Kinetik Partners

16© Kinetik Partners www.kinetikpartners.com Sandia Wind Turbine Reliability Workshop - Radomski

Offshore Wind Turbine Challenges

Areas of research

include:

Source: NREL

Page 18: August 3, 2011 Innovative Manufacturing and Supply Chain ...energy.sandia.gov/wp-content/gallery/uploads/2-C-1-Radomski.pdf · Kinetik Partners | C O N F I D E N T I A L Kinetik Partners

Detroit | Barcelona

Dan Radomski, Partner

Industry & Government Affairs

[email protected]

248.721.3192

Pedro Guillen, Partner

Technology & Business Innovation

[email protected]