August 2017 Project No. 1656790 - DNR Lagoon/20170810...SFM Test Notes: Image Plot(s) Ref: Borehole...

6
August 2017 Project No. 1656790 APPENDICES

Transcript of August 2017 Project No. 1656790 - DNR Lagoon/20170810...SFM Test Notes: Image Plot(s) Ref: Borehole...

Page 1: August 2017 Project No. 1656790 - DNR Lagoon/20170810...SFM Test Notes: Image Plot(s) Ref: Borehole Dip: Notes: 400 ft bgs na MULBERRY WELL TOC COC/ RI/FS Support /MO Camdenton, MO

August 2017 Project No. 1656790

APPENDICES

Page 2: August 2017 Project No. 1656790 - DNR Lagoon/20170810...SFM Test Notes: Image Plot(s) Ref: Borehole Dip: Notes: 400 ft bgs na MULBERRY WELL TOC COC/ RI/FS Support /MO Camdenton, MO

August 2017 Project No. 1656790

APPENDIX A

GEOPHYSICAL LOGS

Page 3: August 2017 Project No. 1656790 - DNR Lagoon/20170810...SFM Test Notes: Image Plot(s) Ref: Borehole Dip: Notes: 400 ft bgs na MULBERRY WELL TOC COC/ RI/FS Support /MO Camdenton, MO

Dip Referenced to Horizontal

SFM - QL40-SFM - SN: 5973-M Tool Length = 0.9m and chshift = 0.08m

Spinner Flowmeter

Casing Depth:

Northing:

GEOPHYSICAL RECORD OF BOREHOLE:

Log Depth Ref:

Location:

Client: Date:

Log Date:

Water Level:

Logged By:

Casing Diameter:

Drill Comp Date:

Ground Elev msl:

Project Number:

Casing Material:

Easting:

Borehole Az:

TOC Elev msl:

Drilled Depth:

Borehole Size:

Casing Stick-up:

SFM Test Notes:

Image Plot(s) Ref:

Borehole Dip:

Notes:

400 ft bgs

na

MULBERRY WELL

TOC

COC/ RI/FS Support /MO

Camdenton, MO

CITY OF CAMDENTON September 26, 2016

09-22-16

157.96 ft TOC

B. Abernathy

12 inch

na

na

1656790

Steel

na

na

The tool was zeroed at the top of steel casing. The boreholewas blocked at 679 ft.

A Tx was placed at 230 ft during the pumping SFM test.

na

900 ft

na

1.72 ft

Ambient spinner flowmeter runs down and up at 20, 30, and 40 ft/min. The tool was run with centralizers. Pumping spinner flowmeter runs down and up at 30 and 40 ft/min. Stationary measurementswere made during pumping at depths of 435, 480, 505, 523, 530, 540, 565, 590, 620, and 670 ft. The pumpwas placed at 240 ft, started at 1345 and stopped at 1642, the pump rate was 102 gpm.

na

vertical

Depth

1ft:600ft

SFM Pump Stationary

0 1000cps

SFM Pump Stationary Measurement

0 100gpm

Caliper

5 20in

Fluid Temperature

13 17deg C

Fluid Conductivity

0 1000uS/cm

SFM-30 Pumping Flow

0 100gpm

350

375

400

425

450

475

500

525

550

575

600

625

650

675

700

725

750

775

800

825

850

875

Page 4: August 2017 Project No. 1656790 - DNR Lagoon/20170810...SFM Test Notes: Image Plot(s) Ref: Borehole Dip: Notes: 400 ft bgs na MULBERRY WELL TOC COC/ RI/FS Support /MO Camdenton, MO

Dip Referenced to Horizontal

SFM - QL40-SFM - SN: 5973-M Tool Length = 0.9m and chshift = 0.08m

Spinner Flowmeter

Casing Depth:

Northing:

GEOPHYSICAL RECORD OF BOREHOLE:

Log Depth Ref:

Location:

Client: Date:

Log Date:

Water Level:

Logged By:

Casing Diameter:

Drill Comp Date:

Ground Elev msl:

Project Number:

Casing Material:

Easting:

Borehole Az:

TOC Elev msl:

Drilled Depth:

Borehole Size:

Casing Stick-up:

SFM Test Notes:

Image Plot(s) Ref:

Borehole Dip:

Notes:

400 ft bgs

na

MULBERRY WELL

TOC

COC/ RI/FS Support /MO

Camdenton, MO

CITY OF CAMDENTON September 28, 2016

09-22-16

157.96 ft TOC

B. Abernathy

12 inch

na

na

1656790

Steel

na

na

The tool was zeroed at the top of steel casing. The boreholewas blocked at 679 ft.

A Tx was placed at 230 ft during the pumping SFM test.

na

900 ft

na

1.72 ft

Ambient spinner flowmeter runs down and up at 20, 30, and 40 ft/min. The tool was run with centralizers. Pumping spinner flowmeter runs down and up at 30 and 40 ft/min. Stationary measurementswere made during pumping at depths of 435, 480, 505, 523, 530, 540, 565, 590, 620, and 670 ft. The pumpwas placed at 240 ft, started at 1345 and stopped at 1642, the pump rate was 102 gpm.

na

vertical

Depth

1ft:400ft

SFM Pump Stationary

0 1000cps

SFM Pump Stationary Measurement

0 100gpm

Caliper

5 20in

Fluid Temperature

13 17deg C

Fluid Conductivity

0 1000uS/cm

SFM30Dn Corrected Flow

0 100gpm

350

375

400

425

450

475

500

525

550

575

600

625

650

675

700

Page 5: August 2017 Project No. 1656790 - DNR Lagoon/20170810...SFM Test Notes: Image Plot(s) Ref: Borehole Dip: Notes: 400 ft bgs na MULBERRY WELL TOC COC/ RI/FS Support /MO Camdenton, MO

Dip Referenced to Horizontal

2SAF-2R Sonic - SN: 3599 Tool Length = 2.715m and chshift = 0.0m

Full-Waveform Sonic Tool

Casing Depth:

Northing:

GEOPHYSICAL RECORD OF BOREHOLE:

Log Depth Ref:

Location:

Client: Date:

Log Date:

Water Level:

Logged By:

Casing Diameter:

Drill Comp Date:

Ground Elev msl:

Project Number:

Casing Material:

Easting:

Borehole Az:

TOC Elev msl:

Drilled Depth:

Borehole Size:

Casing Stick-up:

Image Plot(s) Ref:

Borehole Dip:

Notes:

na

400 ft bgs

MULBERRY WELL

CITY OF CAMDENTON

Camdenton, MO

COC/ RI/FS Support /MO

TOC

09-22-16

September 29, 2016

157.96 ft TOC

B. Abernathy

na

12 inch

na

1656790

na

na

Steel

The tool was zeroed at the top of steel casing. The frequency used for this run was 15 kHz.The borehole was blocked at 679 ft.

na

900 ft

1.72 ft

na

vertical

na

Depth

1ft:300ft

RX1-1A

0 1000us

RX2-1A

0 1000us Bad

B

on

d

RX1-1A - Amplitude

CBL Log0 2300

RX1-1A - dt

0 1000

RX2-1A - dt

0 1000

Delta-T

0 400us

Vp

0 20000ft/s

175

200

225

250

275

300

325

350

375

Page 6: August 2017 Project No. 1656790 - DNR Lagoon/20170810...SFM Test Notes: Image Plot(s) Ref: Borehole Dip: Notes: 400 ft bgs na MULBERRY WELL TOC COC/ RI/FS Support /MO Camdenton, MO

Dip Referenced to Horizontal

Measured Closure at BOH

Structure Legend MN to TN -

Borehole Az:

Borehole Dip:

Logged By:

ChShift=

Measured Tilt at BOH:

Distance:Casing Stick-up:

TOC Elev msl:

Log Date:

Water Level:

Marker Pos:

Project Number:

Ground Elev msl:

Drill Comp Date:

GEOPHYSICAL RECORD OF BOREHOLE:

Easting:

Tool Length:

Angle:

Northing:

Image Plot(s) Ref:

Casing Depth:

Drilled Depth:

Date:Client:

SN:

Casing Diameter:

Location:

Borehole Size:

Casing Material:

Log Depth Ref:

400 ft bgs

na

MULBERRY WELL

0.54 ft

TOC

COC/RI/FS Support/MO

Camdenton, MO

CITY OF CAMDENTON

0.9 deg

09-26-2016

09-22-16

157.96 ft TOC

na

B. Abernathy

12 inch

na

na

1656790

Steel

na

na

5.31 ft

0

na

900 ft

na

122905

1.72 ft

MN

vertical

Depth

1ft:20ft

Tilt

0 5deg

Azimuth

0 360deg

Amplitude-NM

0° 0°180°90° 270°

TravelTime-NM

0° 0°180°90° 270°

Caliper

5 20in395

400

405

410

415

Page 1