August 2008 Kissimmee River Updates

23
August 2008 Kissimmee River Updates Photographs by Brent Anderson The Effects of Tropical Storm Fay

description

August 2008 Kissimmee River Updates. The Effects of Tropical Storm Fay. Photographs by Brent Anderson. Phase I Floodplain. August 27, 2008. Rain continues to fall in late August. Looking west along the east floodplain of Phase I. Phase I Floodplain. August 27, 2008. - PowerPoint PPT Presentation

Transcript of August 2008 Kissimmee River Updates

Page 1: August 2008 Kissimmee River Updates

August 2008 Kissimmee River Updates

Photographs by Brent Anderson

The Effects of Tropical Storm Fay

Page 2: August 2008 Kissimmee River Updates

Phase I Floodplain

August 27, 2008

Rain continues to fall in late August. Looking west along the east floodplain of Phase I.

Page 3: August 2008 Kissimmee River Updates

Phase I Floodplain

August 27, 2008

Shorebirds use the available substrate in the 6-feet-deep floodplain waters. This particular location is typically dry land under ‘normal’ conditions.

Page 4: August 2008 Kissimmee River Updates

Phase I Floodplain

August 27, 2008

Tree frogs, spiders and insects take refuge on the available substrate in the inundated floodplain.

Page 5: August 2008 Kissimmee River Updates

Phase I Floodplain

August 27, 2008

Hydrology monitoring stations and navigation signs are almost completely submerged.

Page 6: August 2008 Kissimmee River Updates

July 31, 2008

Wading bird foraging flocks are extremely low due to deep water conditions on the floodplain. Mainly cattle egrets are encountered on the floodplain. As the floodwaters recede, it is expected that wading bird foraging flocks will

return to the floodplain.

August 27, 2008

Phase I Floodplain

Page 7: August 2008 Kissimmee River Updates

July 31, 2008Phase I Backfill and Floodplain. River channels are undistinguishable.

September 3, 2008

Phase I Backfill and Floodplain

Page 8: August 2008 Kissimmee River Updates

July 31, 2008Looking north along the Phase I backfill.

September 3, 2008

Phase I Backfill

Page 9: August 2008 Kissimmee River Updates

August 27, 2008

Phase I Floodplain

Page 10: August 2008 Kissimmee River Updates

Phase I Floodplain

July 31, 2008

Looking north along the next section of canal to be backfilled in Pool B. Construction is scheduled to begin Fall 2008.

Page 11: August 2008 Kissimmee River Updates

July 31, 2008Upper Phase I river channel looking north towards hydro station PC62.

September 3, 2008

Phase I River Channel

Page 12: August 2008 Kissimmee River Updates

July 31, 2008Tree removal at flow station PC62.

September 3, 2008

Phase I River Channel

Page 13: August 2008 Kissimmee River Updates

River channels in lower Pool B can hardly be distinguished as water levels rise from Tropical Storm Fay floodwaters.

Phase IVA Restored River Channel and Floodplain

September 3, 2008

Page 14: August 2008 Kissimmee River Updates

Floodwaters from Tropical Storm Fay extend to the Oak-line in Phase IVA floodplain

September 3, 2008

Phase IVA Restored Floodplain

Page 15: August 2008 Kissimmee River Updates

Floodwaters from Tropical Storm Fay extend to the Oak-line in Phase IVA floodplain. (A closer look from the ground)

August 27, 2008

Phase IVA Restored Floodplain

Page 16: August 2008 Kissimmee River Updates

August 27, 2008

Page 17: August 2008 Kissimmee River Updates

Floodwaters from Tropical Storm Fay extend into the oak-line in Phase IVA.

Phase IVA Floodplain

September 3, 2008

Page 18: August 2008 Kissimmee River Updates

Phase IVB backfill was initiated in August. The contractors began mobilizing heavy equipment.

Phase IVB Restoration and Canal Backfill

September 3, 2008

Page 19: August 2008 Kissimmee River Updates

Phase IVA Floodplain

September 3, 2008

Water extends to the oak-line in the upper reaches of Phase IVA west floodplain on Avon Park Bombing Range lands.

Page 20: August 2008 Kissimmee River Updates

Upper Pool B

September 3, 2008

Looking south along the western portion of The Kissimmee Prairie State Preserve that is totally inundated.

Page 21: August 2008 Kissimmee River Updates

July 31, 2008A powerboat fights the current in the upper reaches of the Phase IVA backfill.

September 3, 2008

Phase IVA River Channel

Page 22: August 2008 Kissimmee River Updates

July 31, 2008High flows leave the S65C structure.

September 3, 2008

Phase II/III Canal

Page 23: August 2008 Kissimmee River Updates

March 2008August 2008