Hurricane Charley. August 18, 2004 0730 hrs. SEOC LEVEL 1 24 Hour Operations. SERT CHIEF. Mike DeLorenzo. Up next – FEMA. FEMA. Up next – Meteorology. METEOROLOGY. Wednesday – Surface Analysis. Today (Repeat of yesterday): Scattered showers and thunderstorms in the afternoon, - PowerPoint PPT Presentation

Transcript of August 18, 2004 0730 hrs

Page 1: August 18, 2004 0730 hrs

August 18, 2004

0730 hrs

Page 2: August 18, 2004 0730 hrs

SEOC LEVEL

124 Hour Operations

Page 3: August 18, 2004 0730 hrs

Mike DeLorenzo

Up next – FEMA

SERT CHIEF

Page 4: August 18, 2004 0730 hrs

FEMA

Up next – Meteorology

Page 5: August 18, 2004 0730 hrs

METEOROLOGY

Page 6: August 18, 2004 0730 hrs

Wednesday – Surface Analysis

Page 7: August 18, 2004 0730 hrs

Recovery Forecast

Today (Repeat of yesterday):

•Scattered showers and thunderstorms in the afternoon,•Highs in the lower 90s,•Chance of rain 50 percent.

Pattern should hold through early next week.

Page 8: August 18, 2004 0730 hrs

Tropics Currently Not a Threat to Florida

Tropical Storm Formation Not Expected Through Thursday

Up next – Information & Planning

Page 9: August 18, 2004 0730 hrs

INFORMATION & PLANNING

Page 10: August 18, 2004 0730 hrs

Primary Indicators of Disaster Response

Current Status

Red Yellow Green

Energy 90% or less service restoration

90% - 98% restoration

Greater than 98% restoration

Schools – Public K-12

Schools not open/classes not in session

Schools open/not all students in classes

Normal

Emergency Services

Requiring external services – mutual aid

Operating under Emergency Plans

Normal operations

Health Care Primary health care systems and DMATs

Primary health care systems/no DMATs

Primary health care systems

Debris Emergency Debris Clearance

Emergency Debris Removal

Debris Management Plan implemented

Water No pressure/low pressure/boiling water order

Normal pressure/boiling water orders

Normal

Communications Not operational Emergency systems up

Normal

Search and Rescue

Primary Complete Secondary Complete

All clear

Up next – Operations Chief

Page 11: August 18, 2004 0730 hrs

Up next – Emergency Services

OPERATIONS CHIEF

Page 12: August 18, 2004 0730 hrs

EMERGENCY SERVICES

Page 13: August 18, 2004 0730 hrs

Emergency Services• Current Issues –

– DCHAT teams are reporting back to local incident command– DMAT teams are rotating out with staging teams– Continuing to rotate response personnel

• Unmet Needs –– None at this time

• Future Operations –– Transition to long term recovery functions

Up next – Human Services

Page 14: August 18, 2004 0730 hrs

HUMAN SERVICES

Page 15: August 18, 2004 0730 hrs

• Current Operations –– The DFO will open today in Orlando at 100 Sunport Lane, just

south of I-4 off Orange Blossom Trail– Demand for Water, ice and MREs remains high in the hardest hit

counties but as power comes on in th outlying– The fourth DRC located in Lakewales opens today– All of the TSA comfort stations on hand have been setup. but

there is still a large demand. Additional units have been ordered through FEMA

• Unmet Needs – – Ice, food and water have been in short supply which should be

corrected today with large shipments arriving at the LSAs– As if to emphasize this point, a TSA Comfort Station water buffalo

was stolen at gunpoint yesterday– There is still a large demand for Comfort Stations with shower

units. Additional units have been ordered through FEMA• Future Operations –

– Continue to Evaluate the need for additional DRCsUp next – Infrastructure

Human Services

Page 16: August 18, 2004 0730 hrs

INFRASTRUCTURE

Page 17: August 18, 2004 0730 hrs

• Current Operations –– 438,800 customers without electric service– Fuel support to county operations (diesel, gas and LP)– 58,857 wireline POTs customers are out of service (4%)– 142,836 cellular customers are out of service (5.5%)– Radio, satellite, cell and POTs telecom requests coordinated– Supporting Charlotte County EOC and Base Camp mission– Traffic control system restoration (signs, lights, etc.)– Some heavy equipment (cranes, dozers, etc.)

• Unmet Needs – – Monitoring fuel delivery resources

• Future Operations –– Continue to support fuel and telecom requests– Continue to monitor transportation, electrical, telecom, potable

and waste water system restoration

Infrastructure

Up next – Military Support

Page 18: August 18, 2004 0730 hrs

ESF 13 – MILITARY SUPPORT

Page 19: August 18, 2004 0730 hrs

Military Support• Current Operations –

– 4,069 personnel on State Active Duty– RIAT and GSTs continue to support recon and assemement

operations in Osceola and Seminole Counties– Over 1000 soldiers supporting security/traffic control and law

enforcement operations– LSAs continue support operations in Lakeland, Charlotte

County and Hardee County– CH-47 helicopters conduct airlift support from LSA 1

(Lakeland) to LSA 2 (Charlotte County Airport)• Unmet needs –

– None at this time• Future Operations –

– Continue to provide security, humanitarian relief and logistical support operations

Up next – Logistics

Page 20: August 18, 2004 0730 hrs

LOGISTICS

Page 21: August 18, 2004 0730 hrs

Logistics• Current Operations –

– Scheduled Ice & Water Issue to LSAs begin today.– Captiva & Sanibel Island re-opens this morning @ 7:00am– Close Messages (Missions) Upon RETURN of equipment

• Unmet needs –– High Demand Items - ETA is Unknown

• Refer Trailers• Generators• Tarps

• Future Operations –– Continue to Review Mission Status– Identify & Secure Materiel for Primary Election - 31 August

Up next – Finance & Administration

Page 22: August 18, 2004 0730 hrs

FINANCE & ADMINISTRATION

Page 23: August 18, 2004 0730 hrs

Finance and Administration

• Current Issues –– Continue to support EOC requests

• Unmet Needs – – None at this time

• Future Operations –– State Financial Officers' Conference Call will be

held at 2:00pm August 18, 2004 in Room 130D of the Rudd Building. The phone number is 850-487-4411

Up next – Public Information

Page 24: August 18, 2004 0730 hrs

ESF 14 – PUBLIC INFORMATION

Up next – Recovery

Page 25: August 18, 2004 0730 hrs

RECOVERY

Up next – SERT Chief

Page 26: August 18, 2004 0730 hrs

SERT CHIEF

Mike DeLorenzo

Page 27: August 18, 2004 0730 hrs

Don’t forget to turn your Don’t forget to turn your phone’s ringer back on!phone’s ringer back on!

Thanks for your cooperation

Page 28: August 18, 2004 0730 hrs

August 18 at 1800

Branch Chiefs

NEXT BRIEFING