October 2016:• Broke Ground October 2016
• Excavated 6.2 Million Cubic
Yards
• Excavated 100,000 Cubic
Yards in one day at peak
• 36 – 30 Yard Scrappers
• 10 – 30 Yard Dump Trucks
• 85 Days to Complete
June 2017:• 700 Piles – 9 Weeks and 3 Days
• Pile Caps / Tie Beams
• Roof Foundations
End of 2017:
End of July 2018:
LA Stadium in 2020:
INGLEWOODCity of Champions
About Inglewood
Population: 120,000
Demographics: 93% African American & Hispanic
38% of households earn $35K to $74K
37% ownership and growing
27% resident employment in education
Size: 9 Square Miles
Location: One of the 15 South Bay Cities
Position: 3.4 miles from LAX12 miles south of Santa Monica10 miles southwest of DTLAConfined within four major freeways
Destinations: Inglewood’s Fabulous Forum, Roscoe’s Chicken and Waffles, Hollywood Park Casino, Randy’s Donuts
Jan 2017 Jan 2018Inglewood $417K $526K +21%LA Metro $572K $623K +8%California $435K $468K +7%
Outpacing the Region2017 vs. 2016 Inglewood L.A. CA
Transportation/Rentals. +22.% +2.7% +3.9%Building and Construction +48% +6.0% +6.3%Family Apparel +10.7% +2.7% +1.9%Fast Casual Restaurants +20.6% +11.6% +9.3%
Sales Tax Growth2017 vs 2016
Median Home Sale Price
Top Sales Tax ProducersAdvantage Rent A Car Alamillo RebarArco AM PM BurlingtonCarmax CarportlandCostco CVSDollar Rent-a-car Enterprise Rent A CarHirschfeld Steel Group Home DepotLAX Firing Range MarshallsPanda Express RossSchuff Steel Company TargetThe Forum Concessions T MobileUnited Oil USA Gasoline99 Cents Only
Workforce: 58,500
Existing Units: 38,840Permits pulled: 3,644Projected Households by 2020 42,484
Housing Stock
Source: HdL
Source: HdL
Inglewood
+10.2%Source: Zillow
Source: Inglewood Housing Department;Economic Development Department
+9%
+21%4.8%
Unemployment
As of May 2018
State of California
+3.1%
Los Angeles County+3.1%
Economic Indicators
New Inglewood Senior Center
New Housing Downtown
Daniel Freeman Project: Grace Park
• Project unit count – 226 Townhome units which feature a 100-year-old Moreton Bay Fig Tree
• Site grading is being done
• First Phase to be completed by the end of 2019, beginning of 2020
New Housing Downtown
Thomas Safran Associates Project:
• Six Agency-owned parcels set for development; the largest site: 4 acres
• 235 units; 95,000 square feet of retail
• Rooftop recreation and pool
• Grocery store component
• Breaks ground in 3rd Quarter 2018
New Housing Downtown
Nutwood Proposal:
• 300 Market rate apartment homes
• Ground Floor retail
Youth Orchestra Los Angeles
Los Angeles Philharmonic Youth Orchestra project:
• 17,000 sf former bank building
• Redesign by Frank Gehry
• Classrooms and rehearsal space
• Provides access to free instruments and intensive music training
Street Improvements
Century Boulevard Reconstruction
• Completely resurfaced in the City
• Approximately 3 miles of beautification
• $30MM project
• Expected completion: October 2019
New Hotel
Hilton TRU Hotel
• Hilton TRU concept
• 120 rooms
• Lush outdoor garden along Prairie Ave
• 118 parking spaces
Murphy’s Bowl ENA/Clippers Arena
Status of the Negotiation
o ENA approved August 2017
o 36-month negotiation period
o Up to 18,000-seat venue
o 40,000 sf of retailo Practice/sports medicine facility
o $1,500,000 deposit to the City
o Estimated completion date: 2024
Los Angeles Stadium and Entertainment District
The Project• $5 Billion development
• Broke ground February 2014; 6-7 years to develop
• 298 acres
• New NFL Stadium
• 300 hotel rooms
• 26 acres of open parks with lakes and a movie theater
• 40,000 construction-related jobs, 12,000 jobs after completion
Los Angeles Stadium and Entertainment District
Project Features
780,000 sf of Class A Office Space
3.9 Acre Civic Center
Entertainment District
Entitlements:
890,000 sf of retail and fashion
300 room hotel
A 6,000-seat performance venue
A movie theater
A grocery store
2,500 residences
Hollywood Park Casino
Casino
• 120,000 sf casino
• Century Bar and Grill
• Raise Lounge
• Tableside service
Community Benefits
Community Benefits
• $58MM in public infrastructure
• 35% local hiring
• 30% MBE/DBE
• $1 million in afterschool funding
• Use of stadium for charitable causes
• $150K per year for workforce outreach
• $250K for a minimum of 5 job fairs
Four New Stations Three At-Grade One Aerial
Five Aerial Structures
One Underground Structure
1
Crenshaw/LAX Transit ProjectSouthern Segment Update
Fairview Heights StationNew station steel canopy placement
2
Installation elevator frames: May 2018
Activity Near Fairview Heights StationTrack and Ballast Retainer Walls
3
Inspecting trackwork: May 2018
Installation of glass canopy
Downtown Inglewood Station
4
Installation of glass canopy: June 2018
Bridge ConstructionLa Brea Av
5
* Rail on bridge over La Brea Av facing eastbound
Activity Near Downtown Inglewood Station
6
Westbound view of track, OCS and catenary lines
Northbound perspective from Eucalyptus Av
Electrical Trench Work Eucalyptus Av/Florence Av
7
AC compaction and placement for electrical trench line
Bridge ConstructionUnder I-405 Bridge facing westbound
8
Patching rock pockets under the 405 bridge
9
Westchester/Veterans StationInstallation of glass canopy fittings
Installation of glass canopy fittings
10
Westchester/Veterans StationInstallation of glass canopy
Installation of glass canopy
Bridge ConstructionManchester Bridge: Manchester Bl/Aviation Bl Facing Southbound
11
TPSS Site # 3
Laying base for a ramp adjacent to TPSS site
Aviation/Century Station
12
April: Stair No. 2 staircase formwork June: Completion of the activity
Installation of Staircase and Escalators
Installation of Elevator Frames
Aviation/Century Station
13
Installation elevator frames: June 2018
Installation of the Glass Canopy
Aviation/Century Station
14
Glass canopy install: June 2018
Century/Aviation StationConceptual Rendering
A conceptual rendering of the Century/Aviation Station
15
Underground Segment 1(UG1)
16
Barrier rebar installation on the west U-wall: June 2018
17
Underground Segment 1 (UG1) A newly installed lighting fixture
A newly installed lighting fixture: June 2018
Ongoing Bridge Construction
18
Location/Activity
• Century Station (Glass Canopy) July 2018*
• Century Station(Ticket Pavilion Foundation Slab)
August 2018*
• Century Station (Elevator Install) October 2018*
Tentative Date:
19
Southern Segment Ongoing At-Grade Station Construction
• Downtown Inglewood Station: Install Device/Lighting Canopy
• Westchester Veterans Station: Install Glass Canopy
• Westchester Veterans Station: HVAC and TC&C Room
• Fairview Heights Station: Erect Structural Steel Canopy
July 2018*
July 2018*
August 2018*
August 2018*
Tentative Date:Location/Activity
Upcoming Inglewood/Westchester Lane Restrictions and Closures
20
• Florence Av/Hindry Av (Full Depth Paving)
• Florence Av/Centinela(Full Depth Paving)
TBD 2018*
TBD 2018*
Tentative Date:Location/Activity
21
Southern Segment Southwestern Maintenance Yard Construction
• Installation of Hand Rails(Stairs #3)
• Office Area (Restroom Finishes-Level 1)
• Communication Room (Contract Milestone)
* Schedule is subject to change
July 2018*
July 2018*
July 2018*
Anticipated Completion*Activity
Southwestern Yard Project Current
Southwestern Yard: May 2018
Southwestern Yard Project Current
Southwestern Yard: May 2018
Placement of Precast Concrete Walls
Southwestern Yard Project Overview
Southwestern Yard Conceptual Rendering
AMC-Airport Metro Connector Project Rough grading
25
Rough grading for the trans pad at the future 96th St Station
AMC-Airport Metro Connector Project Conceptual RenderingProject located on Aviation Bl and Arbor Vitae St
26
• The proposed project includes a new multi-modal transportation center to connect LAX to the regional bus and rail transit system.
AMC-Station Naming
• Preliminary outreach in form of briefings and presentation are being hosted with key stakeholder to inform and educate about the station naming process and timeline.
• Outreach began in May 2018 and is scheduled through the end of Summer 2018.
• Email your name suggestions to: [email protected]
27