August 05, 2013. Startup 2013 Machine Status: Proton Source Commissioning and Studies RFQ Injector...

9
All Experimenters’ Meeting August 05, 2013

Transcript of August 05, 2013. Startup 2013 Machine Status: Proton Source Commissioning and Studies RFQ Injector...

Page 1: August 05, 2013. Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.

All Experimenters’Meeting

August 05, 2013

Page 2: August 05, 2013. Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.

Startup 2013

Machine Status: Proton Source Commissioning and Studies

RFQ Injector Line (RIL) Linac Booster

Main Injector Startup and Tuning

Page 3: August 05, 2013. Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.

Power Outages PS3 Power Outage

Oil Switch ReplacementImpacts PS3, PW5, & PC3Run on generator for ~1 weekConnect generator Monday, July 29th @ 0800 –

1000Disconnect generator Friday, August 9th @ 0800-

1000

Page 4: August 05, 2013. Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.

Power Failures Feeder 46B

Wednesday, July 24th @ 2142Impact – Possible F0 ventilation systemFault located between P71 & F4Further isolation and repairs necessary

Page 5: August 05, 2013. Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.

Kautz Road SubStation Status

MI backfed from Master SubStation○ Using Feeder 45 for MI conventional power which is

normally T85 on KRSWe ordered 6+ new surge arrestors (4.7k each) from

Hubbell and they were delivered on Friday, July 26th

Schedule: (Weather Dependent)○ Monday, August 5th replace T85 surge arrestors

No machine impact (In Progress)

○ Tuesday, August 6th replace T87 surge arrestorsNo beam during work 8-10 hoursAfter replacement, test both T85 and T87

There will be a 20 minute MI conventional power outage to remove the backfeed, not scheduled.

Page 6: August 05, 2013. Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Page 7: August 05, 2013. Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.

MI Startup Activities (~1 Week) Turn on power supplies and establish ramps Establish 8 Gev beam

Match MI8 line lattice with IPM Tune abort line @8 Gev

Establish 120 Gev beam Smooth orbits up the ramp Tune abort line @ 120 Gev

High field Orbit smoothing (quad moves) (Have data for 1st) Requires tunnel access (2x8 hrs)

Calibrate tune table MI8 line lattice matching (1st of 2 passes complete)

Dedicated beam study Extraction line tune up (NuMI) (Attempting extraction) Tune up for operation Deliver low intensity beam to NuMI beam line for target scans

Estimated to take an additional week after MI is tuned up for operations

Page 8: August 05, 2013. Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Page 9: August 05, 2013. Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.

Shutdown 2012

Schedules and Links:Schedule can be accessed from the Operations Home Page

- Schedules -> Operations Schedule

Direct link to schedule

- http://www-ad.fnal.gov/ops/schedule.html