audit ppt initiatives

35
1 Extra large hand guard

Transcript of audit ppt initiatives

Page 1: audit ppt initiatives

1

Extra large hand guard

Page 2: audit ppt initiatives

2

New face shield with helmets (post pasteurizer)

Page 3: audit ppt initiatives

Zebra painting & pedestrian walkway

3

Page 4: audit ppt initiatives

1. Warning board while crossing the road.2. Pedestrian walkway.

4

Page 5: audit ppt initiatives

5

4 wheel Stopper system

Page 6: audit ppt initiatives

Safety talk- speakers at main gate & time office

6

Page 7: audit ppt initiatives

Zebra painting & Guards for visitors at main gate.

7

Before After

Page 8: audit ppt initiatives

8

Recognition of security guards for implementing stopper system.

Page 9: audit ppt initiatives

Fire Extinguisher Demonstration.

9

Page 10: audit ppt initiatives

Guarding of Hydrant points to avoid damage by Truck movement.

10

Page 11: audit ppt initiatives

Fire retardant suit for Boiler

11

Page 12: audit ppt initiatives

First Aid training for KBDL & CTC

12

Page 13: audit ppt initiatives

Recognition of security guards for implementing stopper system.

13

Page 14: audit ppt initiatives

44th Safety Week Celebration

14

Page 15: audit ppt initiatives

Fall arrest system Training & PPE demo by m/s- Karam

15

Page 16: audit ppt initiatives

Fire Hydrant Demo & ELCB, Arc welding training (Train the trainer)

16

Page 17: audit ppt initiatives

17

Training – Carbolic acid as snake repellent

Page 18: audit ppt initiatives

Recognition of housekeeping champions for best PPE compliance.

18

Page 19: audit ppt initiatives

19

Introduced FRP ladder for electrical work.

Page 20: audit ppt initiatives

Safety Improvement

20PICTURES OF SAFETY IMPROVEMENT INITIATIVES

Hot Surface Enclosure provided

Page 21: audit ppt initiatives

Safety Improvement

21

Elevation difference Antiskid Slope provided

Page 22: audit ppt initiatives

Safety Improvement – May-15

22PICTURES OF SAFETY IMPROVEMENT INITIATIVES

Shift wise Tool box talk at shop floor.

Page 23: audit ppt initiatives

23

Spill Kit- Lab (Green color coding will be provided by 15th dec.’14)

Page 24: audit ppt initiatives

• ETP- fencing, rain protection shed for equipments.

24

Other initiatives.

Page 25: audit ppt initiatives

• 2 More SCBA set. Total-3 sets and 4 cylinders. Training done for security, operators and engineers. (The main gate SCBA set will be shifted to engg. Workshop by 20th dec.))

25

Other initiatives.

Page 26: audit ppt initiatives

• Yellow marking through out the brewery as initial step for pedestrian walkway. Way forward- traffic poles on markings.

26

Other initiatives.

Page 27: audit ppt initiatives

• Four stoppers system implemented for all 4/3 wheelers. 400 stoppers kept at main gate.

27

Other initiatives.

Page 28: audit ppt initiatives

• Snake catcher at main gate security.

28

Page 29: audit ppt initiatives

Other InitiativesDock leveler forklift toppling risk mitigated.

• Before • After

29

Page 30: audit ppt initiatives

Other InitiativesRotating part guarding- BBH (done), FO boiler(done), ETP (on going),

refrigeration/ compressor room (ongoing).

30

Page 31: audit ppt initiatives

Other Initiatives2 set chemical suit for brew house chemical handling.

31

Page 32: audit ppt initiatives

Fall Arrestor Area Mandates Before After

32Mandated- Handgloves, Safety helmets, check register.

Page 33: audit ppt initiatives

33

Compliance of Safety helmet and hand gloves - Loading

Page 34: audit ppt initiatives

Feeding area PPE compliance and OPL display

34

Page 35: audit ppt initiatives

35

TBT by Permit issuer while issuing work permit