Transcript of audit ppt initiatives
1
Extra large hand guard
2
New face shield with helmets (post pasteurizer)
Zebra painting & pedestrian walkway
3
1. Warning board while crossing the road.2. Pedestrian walkway.
4
5
4 wheel Stopper system
Safety talk- speakers at main gate & time office
6
Zebra painting & Guards for visitors at main gate.
7
Before After
8
Recognition of security guards for implementing stopper system.
Fire Extinguisher Demonstration.
9
Guarding of Hydrant points to avoid damage by Truck movement.
10
Fire retardant suit for Boiler
11
First Aid training for KBDL & CTC
12
Recognition of security guards for implementing stopper system.
13
44th Safety Week Celebration
14
Fall arrest system Training & PPE demo by m/s- Karam
15
Fire Hydrant Demo & ELCB, Arc welding training (Train the trainer)
16
17
Training – Carbolic acid as snake repellent
Recognition of housekeeping champions for best PPE compliance.
18
19
Introduced FRP ladder for electrical work.
Safety Improvement
20PICTURES OF SAFETY IMPROVEMENT INITIATIVES
Hot Surface Enclosure provided
Safety Improvement
21
Elevation difference Antiskid Slope provided
Safety Improvement – May-15
22PICTURES OF SAFETY IMPROVEMENT INITIATIVES
Shift wise Tool box talk at shop floor.
23
Spill Kit- Lab (Green color coding will be provided by 15th dec.’14)
• ETP- fencing, rain protection shed for equipments.
24
Other initiatives.
• 2 More SCBA set. Total-3 sets and 4 cylinders. Training done for security, operators and engineers. (The main gate SCBA set will be shifted to engg. Workshop by 20th dec.))
25
Other initiatives.
• Yellow marking through out the brewery as initial step for pedestrian walkway. Way forward- traffic poles on markings.
26
Other initiatives.
• Four stoppers system implemented for all 4/3 wheelers. 400 stoppers kept at main gate.
27
Other initiatives.
• Snake catcher at main gate security.
28
Other InitiativesDock leveler forklift toppling risk mitigated.
• Before • After
29
Other InitiativesRotating part guarding- BBH (done), FO boiler(done), ETP (on going),
refrigeration/ compressor room (ongoing).
30
Other Initiatives2 set chemical suit for brew house chemical handling.
31
Fall Arrestor Area Mandates Before After
32Mandated- Handgloves, Safety helmets, check register.
33
Compliance of Safety helmet and hand gloves - Loading
Feeding area PPE compliance and OPL display
34
35
TBT by Permit issuer while issuing work permit