AUDIT - INSPECTION - EXPEDITING - PROJECT MANAGEMENT ... · •Vendor and desk expediting - to meet...
Transcript of AUDIT - INSPECTION - EXPEDITING - PROJECT MANAGEMENT ... · •Vendor and desk expediting - to meet...
AUDIT - INSPECTION - EXPEDITING - PROJECT MANAGEMENT - QUALITY COORDINATION
«We will be your eyes when you are blind, your boots on the ground»
Introduction
DELTA PI is a leading provider of independent inspectors and surveyors that carry out inspection, expediting and auditing activities on equipment associated with business in the O&G field, as well as renewables, infrastructure, water and marine sectors.
DELTA PI was founded in 2014 by Gianluca Pilo, a wellhead specialist with a technical background, and Davide Lenzini, a skilled HSE and QA Manager. In 2016 Dalila Menini, an experienced Team Leader, coming from a multinational company, joined Delta Pi as Operations Manager.
The union of technical, quality and operational expertise, is leading the company to the success.
What we do
INSPECTION
• Pre-production meetings, interim and final inspections - using qualifiedpersonnel also with short notice.
EXPEDITING
• Vendor and desk expediting - to meet client’s demand to ensure that material’s delivery date and contractual terms are obtained.
OTHER SERVICES
• Supplier QMS and HSE audit for qualification, QA management and coordination, Project management support, and any other client tailored service
Our strengths
QUALITY ORIENTATION
- Happy and motivatedemployees.
- Vast Expertise.- ISO 9001:2008
certification.
QUICK TURNAROUND TIME
- Short chain from client to inspector.
- Coverage at short notice.
GLOBAL COVERAGE
- Operative office in Switzerland, coveringEuropean activities.- Partnerships in the
UAE (Dubai), US (Houston), and South
East Asia (Hong Kong)
Reference listCLIENT PROJECT
Abu Dhabi Gas Industries (GASCO) 5239 Habshan-5 Process PlantAbu Dhabi Gas Liquefaction Limited (ADGAS) Integrated Gas Development (IGD) ProjectCCC (Consolidated Contractors Company) Shah Sulphur Station & PipelinesTechnip UAE EPC 1 Upper Zakum Z750 PROJECTAsia Gas Pipeline Kazakhstan-China Gas Pipeline ProjectZakum Development Company (ZADCO) EPC 1 Upper Zakum Z750 PROJECTTechnip UAE – NPCC JV Satah Full Field Development ProjectAsia Trans Gas Uzbekistan - China Gas Pipeline ProjectDubai Petroleum Fateh Field ProjectChevron Australia PTY Ltd. Wheatstone Upstream Project
Fluor
Chayvo Opf Expansion
Arkutun Dagi Onshore Pipelines (Chayvo)
Dolphin Relief And Blowdown System Upgrade
Groupement Berkine Sonatrach/AnadarkoEl Merk Project Lot 6 AlgerieGroupement Berkine Drilling Blocks
Petrofac Llc. El Merk Project Lot 6 Algerie
Hyundai Engineering & Construction Co. Ltd.
Kone
Habsan-5 Utilities & Offsites(Igd)
Borouge-3 Utilities & Offsites(Brg3)
Hyundai Engineering CompanyArzew Refinery Rehabilitation
ToneKellogg Join Venture Gorgon Project
McDermott, Inc.Khafji Ratawi Water Injection Facilities
Aramco Safaniya
TecnimontAl Dabb'iya (ADCO)
Package 1 IGD Expansion Project (ADGAS)
Petrofac
EPC For ASAB FFD Project
South Yoloten Field Gas Development
Early Production Facilities FCP & Brown
Turkmengas Project
UQUO Gas Plant Upgrade - Nigeria
Al-Hosn Gas (ADGD) Shah GasAbu Dhabi Polymers (Borouge) Borouge 2 Expansion ProjectShell Global Solutions Pearl Gtl ProjectSubsea 7 Laggan & Tormore
Trendsetter Eng. Inc.
SWRP Capping Stacks
Shell Capping Stack 400F Appomattox
Exxon HippsM.R. Al-Khatlan Jubail Export Refinery Proj - Package 5cNPCC All-Nasr Full FieldADCO Spiking Gas Compressor at Shah CDS Bab Thamama B Gas Lift
What sets us apart from other companiesü 24 HRS TURNAROUND TIME: Inspection agencies usually subcontracts
the work to smaller companies. The longer is the chain, the later the feedback is available for who needs it. DELTA PI provides the same service, without intermediation; the client can get in contact with the inspector when needed, and the report is delivered within 24 hours from the visit completion.
ü COMPETITIVE RATES: DELTA PI doesn’t have any overhead or any transversal function to bear. Simple structure and highly efficient are the key to reduce costs and increase service quality.
ü REWARD OF RESOURCES: the work subcontracted to freelancers inspectors suffers the aggressive reduction of service rates to contain the structure’s costs, resulting into frustration and inadequate performance of the technician . DELTA PI takes good care of his workers, both employees and freelancers. In this way we insure enthusiasm and full focus on the assignment.
Our mission
DELIVER A HIGH QUALITY SERVICE
AT FARE AND COMPETITIVE RATES.
CONTACT US!
DELTA PI SAGL Corso San Gottardo 8a6830 Chiasso Switzerland
☏ (+41) 91 922 72 12 ✉ [email protected]@ www.deltapi.ch
End of this presentation