AUDIT - INSPECTION - EXPEDITING - PROJECT MANAGEMENT ... · •Vendor and desk expediting - to meet...

9
AUDIT - INSPECTION - EXPEDITING - PROJECT MANAGEMENT - QUALITY COORDINATION «We will be your eyes when you are blind, your boots on the ground»

Transcript of AUDIT - INSPECTION - EXPEDITING - PROJECT MANAGEMENT ... · •Vendor and desk expediting - to meet...

Page 1: AUDIT - INSPECTION - EXPEDITING - PROJECT MANAGEMENT ... · •Vendor and desk expediting - to meet client’s demand to ensure that ... Reference list CLIENT PROJECT Abu Dhabi Gas

AUDIT - INSPECTION - EXPEDITING - PROJECT MANAGEMENT - QUALITY COORDINATION

«We will be your eyes when you are blind, your boots on the ground»

Page 2: AUDIT - INSPECTION - EXPEDITING - PROJECT MANAGEMENT ... · •Vendor and desk expediting - to meet client’s demand to ensure that ... Reference list CLIENT PROJECT Abu Dhabi Gas

Introduction

DELTA PI is a leading provider of independent inspectors and surveyors that carry out inspection, expediting and auditing activities on equipment associated with business in the O&G field, as well as renewables, infrastructure, water and marine sectors.

DELTA PI was founded in 2014 by Gianluca Pilo, a wellhead specialist with a technical background, and Davide Lenzini, a skilled HSE and QA Manager. In 2016 Dalila Menini, an experienced Team Leader, coming from a multinational company, joined Delta Pi as Operations Manager.

The union of technical, quality and operational expertise, is leading the company to the success.

Page 3: AUDIT - INSPECTION - EXPEDITING - PROJECT MANAGEMENT ... · •Vendor and desk expediting - to meet client’s demand to ensure that ... Reference list CLIENT PROJECT Abu Dhabi Gas

What we do

INSPECTION

• Pre-production meetings, interim and final inspections - using qualifiedpersonnel also with short notice.

EXPEDITING

• Vendor and desk expediting - to meet client’s demand to ensure that material’s delivery date and contractual terms are obtained.

OTHER SERVICES

• Supplier QMS and HSE audit for qualification, QA management and coordination, Project management support, and any other client tailored service

Page 4: AUDIT - INSPECTION - EXPEDITING - PROJECT MANAGEMENT ... · •Vendor and desk expediting - to meet client’s demand to ensure that ... Reference list CLIENT PROJECT Abu Dhabi Gas

Our strengths

QUALITY ORIENTATION

- Happy and motivatedemployees.

- Vast Expertise.- ISO 9001:2008

certification.

QUICK TURNAROUND TIME

- Short chain from client to inspector.

- Coverage at short notice.

GLOBAL COVERAGE

- Operative office in Switzerland, coveringEuropean activities.- Partnerships in the

UAE (Dubai), US (Houston), and South

East Asia (Hong Kong)

Page 5: AUDIT - INSPECTION - EXPEDITING - PROJECT MANAGEMENT ... · •Vendor and desk expediting - to meet client’s demand to ensure that ... Reference list CLIENT PROJECT Abu Dhabi Gas

Reference listCLIENT PROJECT

Abu Dhabi Gas Industries (GASCO) 5239 Habshan-5 Process PlantAbu Dhabi Gas Liquefaction Limited (ADGAS) Integrated Gas Development (IGD) ProjectCCC (Consolidated Contractors Company) Shah Sulphur Station & PipelinesTechnip UAE EPC 1 Upper Zakum Z750 PROJECTAsia Gas Pipeline Kazakhstan-China Gas Pipeline ProjectZakum Development Company (ZADCO) EPC 1 Upper Zakum Z750 PROJECTTechnip UAE – NPCC JV Satah Full Field Development ProjectAsia Trans Gas Uzbekistan - China Gas Pipeline ProjectDubai Petroleum Fateh Field ProjectChevron Australia PTY Ltd. Wheatstone Upstream Project

Fluor

Chayvo Opf Expansion

Arkutun Dagi Onshore Pipelines (Chayvo)

Dolphin Relief And Blowdown System Upgrade

Groupement Berkine Sonatrach/AnadarkoEl Merk Project Lot 6 AlgerieGroupement Berkine Drilling Blocks

Petrofac Llc. El Merk Project Lot 6 Algerie

Hyundai Engineering & Construction Co. Ltd.

Kone

Habsan-5 Utilities & Offsites(Igd)

Borouge-3 Utilities & Offsites(Brg3)

Hyundai Engineering CompanyArzew Refinery Rehabilitation

ToneKellogg Join Venture Gorgon Project

Page 6: AUDIT - INSPECTION - EXPEDITING - PROJECT MANAGEMENT ... · •Vendor and desk expediting - to meet client’s demand to ensure that ... Reference list CLIENT PROJECT Abu Dhabi Gas

McDermott, Inc.Khafji Ratawi Water Injection Facilities

Aramco Safaniya

TecnimontAl Dabb'iya (ADCO)

Package 1 IGD Expansion Project (ADGAS)

Petrofac

EPC For ASAB FFD Project

South Yoloten Field Gas Development

Early Production Facilities FCP & Brown

Turkmengas Project

UQUO Gas Plant Upgrade - Nigeria

Al-Hosn Gas (ADGD) Shah GasAbu Dhabi Polymers (Borouge) Borouge 2 Expansion ProjectShell Global Solutions Pearl Gtl ProjectSubsea 7 Laggan & Tormore

Trendsetter Eng. Inc.

SWRP Capping Stacks

Shell Capping Stack 400F Appomattox

Exxon HippsM.R. Al-Khatlan Jubail Export Refinery Proj - Package 5cNPCC All-Nasr Full FieldADCO Spiking Gas Compressor at Shah CDS Bab Thamama B Gas Lift

Page 7: AUDIT - INSPECTION - EXPEDITING - PROJECT MANAGEMENT ... · •Vendor and desk expediting - to meet client’s demand to ensure that ... Reference list CLIENT PROJECT Abu Dhabi Gas

What sets us apart from other companiesü 24 HRS TURNAROUND TIME: Inspection agencies usually subcontracts

the work to smaller companies. The longer is the chain, the later the feedback is available for who needs it. DELTA PI provides the same service, without intermediation; the client can get in contact with the inspector when needed, and the report is delivered within 24 hours from the visit completion.

ü COMPETITIVE RATES: DELTA PI doesn’t have any overhead or any transversal function to bear. Simple structure and highly efficient are the key to reduce costs and increase service quality.

ü REWARD OF RESOURCES: the work subcontracted to freelancers inspectors suffers the aggressive reduction of service rates to contain the structure’s costs, resulting into frustration and inadequate performance of the technician . DELTA PI takes good care of his workers, both employees and freelancers. In this way we insure enthusiasm and full focus on the assignment.

Page 8: AUDIT - INSPECTION - EXPEDITING - PROJECT MANAGEMENT ... · •Vendor and desk expediting - to meet client’s demand to ensure that ... Reference list CLIENT PROJECT Abu Dhabi Gas

Our mission

DELIVER A HIGH QUALITY SERVICE

AT FARE AND COMPETITIVE RATES.

Page 9: AUDIT - INSPECTION - EXPEDITING - PROJECT MANAGEMENT ... · •Vendor and desk expediting - to meet client’s demand to ensure that ... Reference list CLIENT PROJECT Abu Dhabi Gas

CONTACT US!

DELTA PI SAGL Corso San Gottardo 8a6830 Chiasso Switzerland

☏ (+41) 91 922 72 12 ✉ [email protected]@ www.deltapi.ch

End of this presentation