Audio Conference (Broadband) 04/09/2013 & 05 /09/2013

13

description

Audio Conference (Broadband) 04/09/2013 & 05 /09/2013. Broadband. Present Status Of Broadband Connection as on 31-08-2013. BB Gross,Net & Disconnection During 2013-14. CPE Requirement for 2013-14. BB CPE Receipt / Utility details as on 1-08-2013 ( for July 2013). - PowerPoint PPT Presentation

Transcript of Audio Conference (Broadband) 04/09/2013 & 05 /09/2013

Page 1: Audio Conference  (Broadband) 04/09/2013 & 05 /09/2013
Page 2: Audio Conference  (Broadband) 04/09/2013 & 05 /09/2013

Broadband

Page 3: Audio Conference  (Broadband) 04/09/2013 & 05 /09/2013

SSA Capacity as on 31-03-2012

Capacity as on 31-03-2013

Net conn: as on 31-08-2013

Net conn:

provided during August

2013

Net conn: during

2013-14

Gross conn: as on 31-08-

2013

Gross conn:

provided during

Aug 2013

Gross conn: during 2013-

14

BB Penetration as on

31-03-2013

BB Penetration as on 31-08-2013

Increase in

penetration

TVM 107296 108384 67445 420 2593 109213 1120 6539 22.11 23.00 0.89

KLM 68736 71376 49280 554 3128 75313 1051 6000 18.56 19.82 1.26

PTA 52784 54624 37788 473 2553 62807 889 5350 22.76 24.41 1.65

ALP 53376 56464 43848 263 2408 69035 890 5310 20.87 22.08 1.21

KTM 70544 82144 57078 284 1652 92794 1060 5647 24.99 25.74 0.75

ENK 145760 155392 116736 452 3987 191062 2301 12460 25.95 26.87 0.92

TCR 85224 93368 72680 503 3391 119909 1548 8231 20.66 21.67 1.01

PGT 51344 55248 37419 136 1175 57998 597 3362 22.99 23.73 0.74

MRX 52176 53712 33632 456 2373 59273 946 4926 12.23 13.16 0.93

CLT 94880 103520 52702 142 1829 93040 992 6192 19.09 19.78 0.69

CNN 106352 115760 74209 382 2730 148544 2014 10642 18.96 19.69 0.73

Total 888472 949992 642817 4065 27819 1078988 13408 74659 20.89 21.84 0.95

Page 4: Audio Conference  (Broadband) 04/09/2013 & 05 /09/2013

SSA Gross conn: during 2013-14

Net conn: during 2013-14

Disconnection during 2013-14

TVM 5419 2173 3246

KLM 4949 2574 2375

PTA 4461 2080 2381

ALP 4420 2145 2275

KTM 4587 1368 3219

ENK 10159 3535 6624

TCR 6683 2888 3795

PGT 2765 1039 1726

MRX 3980 1917 2063

CLT 5200 1687 3513

CNN 8628 2348 6280

Total 61251 23754 37497

Page 5: Audio Conference  (Broadband) 04/09/2013 & 05 /09/2013

SSA Requirement for 2013-14 given by SSAs

Remarks

TVM 500

KLM Not Received

PTA Not Received

ALP 20000

KTM NIL

ENK Not Received

TCR Not Received

PGT 11000

MRX Not Received

CLT Not Received

CNN Not Received

Total 31500

Page 6: Audio Conference  (Broadband) 04/09/2013 & 05 /09/2013

SSA CPE Allotted from circle office as on 1-08-2013

CPE Utilization Details

No: of CPEs wkg on

Rental

No of CPEs

wkg on outright

sale

Additional CPEs

given+Purchase

closure+free

CPEs+VPN conn CPEs

Irrepairable CPEs

(Faulty & No AMC)

Faulty CPEs

(Repair Centre+

Field Units)

Scrapped CPEs

Not Utiliz

ed CPEs

Total Utilized

TVM 78811 Details were not receivedKLM 45785 Details were not receivedPTA 35038 Details were not receivedALP 44851 1008

220511 5476 2725 943 437 288

543059

KTM 61103 Details were not receivedENK 11454

6Details were not received

TCR 73866 Details were not receivedPGT 40931 Details were not receivedMRX 36762 5497 8309 15974 2453 1432 245

3644 36762

CLT 59371 5273 21796 22171 1522 1945 1568

5096

59371

CNN 85447 Details were not receivedTotal 67651

1Details were not received

Page 7: Audio Conference  (Broadband) 04/09/2013 & 05 /09/2013

SSA Rental CPEs

recovered during July 2013

Repaired /

Replaced CPEs

from the repair centre during

July 2013

CPEs used for maintena

nce purpose during

July 2013

CPEs used for

providing new

connection during July 2013

Balance CPEs in hand for providing conn: as on 1-08-

2013

Not Utilized CPE details

New Repaired/Recovere

d

TVM Details were not received

KLM Details were not received

PTA Details were not received

ALP Details were not received

KTM 239 439 215 121 4921 4899 22

ENK Details were not received

TCR Details were not received

PGT Details were not received

MRX 451 53 10 644 193 451

CLT 98 174 52 23 5096 3364 1732

CNN Details were not received

Total

Page 8: Audio Conference  (Broadband) 04/09/2013 & 05 /09/2013

SSA Allotted during

Q1

Allotted during July

2013

Qty at CTSD ENK

Total Allotment

during 2013-14

TVM 2250 2250

KLM 1300 1300

PTA 700 700

ALP 800 800

KTM 1500 1500

ENK 3000 3250 6250

TCR 1300 1300

PGT 1200 1200

MRX 1600 1600

CLT 1600 1600

CNN 1500 1500

CTSD 769 769

Total 3000 17000 769 20769

Page 9: Audio Conference  (Broadband) 04/09/2013 & 05 /09/2013

SSA Field Balance

Store Balance Details

Total Balance

ENK 1239 3400 4639

CNN 2109 3053 5162

CLT 1075 2106 3181

KLM 383 3459 3842

TVM 401 1894 2295

TCR 140 4710 4850

PGT 303 2874 3177

PTA 137 3182 3319

ALP 195 2723 2918

MRX 573 1929 2502

KTM 113 4849 4962

CTSD 9434 9434

Store Balance

43613

Total 50281 43613 50281

Page 10: Audio Conference  (Broadband) 04/09/2013 & 05 /09/2013

SSA Total disconnections from 13-04-13

to 24-07-13 (CDR Report)

Rental modems not collected closed

conn: (CDR Report)

No: of modems collected ( SSA

Report)

TVM 3384 123 Not Received

KLM 2216 54 Not Received

PTA 2131 92 Not Received

ALP 2139 37 Not Received

KTM 2879 78 22 nos reconnected & 1

modem recovered

ENK 6274 333 Not Received

TCR 3564 115 Not Received

PGT 1708 130 Not Received

MRX 1891 32 6

CLT 3269 67 Not Received

CNN 5484 142 Not Received

Total 34939 1203 Not Received

Page 11: Audio Conference  (Broadband) 04/09/2013 & 05 /09/2013

1. Report from Alleppey SSA Modem is wkg, but the Wi Fi working of the modem is

not upto the mark. Signal is very feeble.

2. Report from Ernakulam SSA (SDE Mattancherry)Among few modems supplied 4 modems had gone faulty within few weeks of installation.

2 modems returned back with no Wi Fi coverage. In some modems frequent Wi FI Cut off. The performance of WI Fi is not up to the mark.

3. Report from Trivandrum SSA There is problem in Wi Fi range.

4. Report from the other SSAs awaited

Page 12: Audio Conference  (Broadband) 04/09/2013 & 05 /09/2013
Page 13: Audio Conference  (Broadband) 04/09/2013 & 05 /09/2013