Attachment 1 - NEDA Region IV-Anro4a.neda.gov.ph/wp-content/uploads/2014/06/NRO4A-3rd... ·...
Transcript of Attachment 1 - NEDA Region IV-Anro4a.neda.gov.ph/wp-content/uploads/2014/06/NRO4A-3rd... ·...
Attachment 1QUARTERTY PHYSICAT REPORT OF OPERATION
3'd quarter (J u ly-september)
Perfiormance lndicator Set 1qUANTITY: PeraentaSe of requested policy recommendations on socio-economlc a nd development matte6 prepared or revlewed and submitted.
QIJALITY: Percentage of policy recommendations with no adversefeedback received.'IIMELINESS: Percentage ofpollcy recommendations p.epared within prescrlbed timeframe.
Formulation of an Integrated River
Management Development Master Plan
of Marikina River Basin
2. RA 9003 and IRR
PERIOD =2ot2
TOTAT NUMBER OF POLICIES REVIEWED WITH NO
ADVERSE FEEDBACK RECEIVED =2OT2 (1OO%)TOTAT NUMBER OF POLICIES REVIEWED: 2ot 2lr0O%l
* Adverse feedback refers to any written or verbal negative comments received directly from requesting parties.
Submitted on 16 Sept.Integrated Coastal Management-related bills(senate Bill Nos. 7o0,143,2t79,142, L7t,769,7308 and 2237
Submitted on 23 Sept.
2. Providing for the Allocation of Funds Received
from the Utilization of Natural Resources and
Creation of Provincial Offshore NaturalResources Economic Development Authority
RECEIVED ADVERSE FEEDBACK*
(Y for yes and N for no)NAME OF POTICY REQUESTS
(Specify the policies requested for review)
PERIOD
(Y for Yes and N for No)
RECEIVED ADVERSE FEEDBACK*
(Y for yes and N for no)NAME OF POLICY REQUFSTS
(Specify the policies requested for review)
TEMPLATE
* Adverse feedback refers to any written or verbal negative comments received directly from requesting parties.
Performance Indicator Set 2
QUANTITY: Number of plans prepared/ updated.QUALITY: PDP and RM submitted to the President and RDPs presented to or endorsed by the Regional Development Councils (RDCs).TIMELINESS: Plans prepared/ updated within schedule.
Performance Indicator Set 1
QUANTITY: Number of meeting documents prepared.
QUALITY: Percentage of members who were satisfied with the completeness and accuracy of meeting documents prepared and released.TIMELINESS: Percentage of meeting documents released within the prescribed timeframe.
Attachment 13. Delineation of the Specific Forest Units of
Public Domain (House BillNo.4988)NEDA - ANRES Y N Submitted 26 September
4. Regional Development Budget Process
FrameworkRDC IX Y N
Endorsed by the RDC FullCouncil on 25 September.
5. NEDA Strategic Performance ManagementSystem (SPMS)
NEDA - Admin.Staff
Y N Submitted on 23 Sept.
TOTAL NUMBER OF POIICIES REVIEWED: 5 of 5 TOTAT NUMBER OF POLICIES
REVIEWED WITHIN PRESCRIBED
PERIOD=5of5(100%)
TOTAT NUMBER OF POTICIES
REVIEWED WITH NO ADVERSEFEEDBACK RECEIVED = 5 of 5 (1OO%)
Strategic Action Plan for theRehabilitation and Recovery ofAreas Affected by TyphoonGlenda (Rammasun
Submission: 20 AugustRDRRMC Endorsement:23 September
Submission: 20 AugustRDRRMC Endorsement:23September
NAME OF PLAN DOCUMENT
TARGET DATE OF
PRESENTATTON/
ENDORSEMENT/
SUBMISSION
ACTUAL DATE OF
PRESENTATION/
ENDORSEMENT/
SUBMISSION
PRESENTED OR
ENDORSED
(YforYesand NforNo)
WITHINSCHEDULE
(YforYesand N
for No)
REMARKS
Regional DevelopmentResearch Agenda
3'o Quarter 2014 3'd Quarter 2014 Y Y
Updated Regional Results
Matrix3'o Quarter SectoralCommittee Meetings
3'oQuarter SectoralCommittee Meetings
Y Y
Y Y
TEMPLATE Attachment 1De'fin hions:
. The number of meding documents referto the number of minutes paepareo.
. The minutes or hlghlights ofthe meetlngs arc the bases for ldentirying the members' satisfaction on the services provtded bythe Secretariat.. Target schedule of release (based on standard set bythe Com mittee/council or the concehed units) ofthe agenda folder as.ompared with the actualrelease folder released one day before the
3rd Quarter RegionalDevelopmentCouncil
1
1 minutes ofpreviousmeeting
4 Chairman'sreport
11 RDC
Resolutions
79 792 weeks before
the meeting
2 weeksbefore themeeting
Y
Sectoral Committeeon MacroDevelopmentAuthority
1.
1 minutes ofpreviousmeeting
3 resolutions
27 272 weeks before
the meeting
2 weeksbefore themeeting
Y
RegionalInformation &CommunicationTechnologyCommittee
1
1 minutes ofpreviousmeeting
31 312 weeks before
the meeting
2 weeksbefore themeeting
v
Regional researchCommittee
1
1 minutes ofpreviousmeeting
16 162 weeks before
the meeting
2 weeksbefore themeeting
Y
NAME OF
coMMTTTEE/COUNCIL
NUMBER
OF
MEETINGS
FOR
THE
PERIOD
NUMBER OF
MINUTES OF
MEETINGS ANDRESOLUTIONS
PREPARED
NUMBER OF
COMMITTEE
MEMBERS
NUMBER OF
COMMIfiEErvrEMbE.K> wftu wtKtSATISFIED WITH THE
COMPTETENESS ANDACCURACY OF THE
MINUTES
TARGET SCHEDULE
OF RELEASE OF
MEETING
DOCUMENTS
(EITHER HARD
coPrEs oRTHROUGH E-MA|L)
ACTUAL
RELEASE OF
MEETING
DOCUMENTS
MEETING
DOCUMENTS
RELEASED
WITHIN THE
PRESCRIBED
TIMEFRAME(Y for Yes and
N for No)
REMARKS
TEMPLATE Attachment 1
Regional StatisticalCoordinationCommittee
1
1 minutes ofprevious
meeting29 29
2 weeks beforethe meeting
2 weeksbefore themeeting
Y
RSCCTWG T
1 minutes ofpreviousmeeting
16 162 weeks before
the meeting
2 weeksbefore themeeting
Y
RegionalCompetitivenessCommittee
1
1 minutes ofprevious
meeting25 25
2 weeks beforethe meeting
2 days beforethe meeting
Y
Sectoral Committeeon EconomicDevelopment
1
1 Minutes of themeeting
1 SCED
Resolution forthe Creation of
TWG onLogistics
73 232 weeks after the
meeting2 weeks afterthe meeting
Y
Sectoral Committeeon Social
Development1
1 minutes of themeeting
1 resolution
36 36 30 September2 weeks
before themeeting
Y
Regional Land Use
Committee1.
1 minutes of themeeting
1 resolution
24 24 17 September2 weeks
before themeeting
Y
Committee onMigration andDevelopment
1L minutes of the
meeting28 28 30 July
2 weeksbefore themeeting
Y
NAME OF
COMMITTEE/COUNCIL
NUMBER
OF
MEETINGS
FOR
THE
PERIOD
NUMBER OF
MINUTES OF
MEETINGS AND
RESOLUTIONS
PREPARED
NUMBER OF
COMMITTEE
MEMBERS
NUMBER OF
COMMITTEEMEMBERS WHO WERE
ACCURACY OF THE
MINUTES
OF RELEASE OF
MEETING
DOCUMENTS
(EITHER HARD
coPtEs oRTHROUGH E-MAIL)
ACTUAL
RELEASE OF
MEETING
DOCUMENTS
MEETING
DOCUMENTS
RELEASED
WITHIN THE
PRESCRIBED
TIMEFRAME(Y for Yes and
N for Nol
REMARKS
TEMPLATE
Performance lndicator Set 2
QUANTITY: Number of economic reports prepared.
QUALITY: Percentage of economic reports with no negative feedback received on completeness and accuracy of content/ information.
Attachment 1
NAME OF
coMMTTTEE/COUNClL
NUMBER
OF
MEETINGS
FOR
THE
PERIOD
NUMBER OF
MINUTES OF
MEETINGS AND
RESOLUTIONS
PREPARED
NUMBER OF
COMMITTEE
MEMBERS
NUMBER OF
COMMITTEEMEMBERS WHO WERE
SATISFIED WITH THE
COMPLETENESS ANDACCURACY OF THE
MINUTES
TARGET SCHEDULE
OF RELEASE OF
MEETING
DOCUMENTS(EITHER HARD
coPtEs oRTHROUGH E-MAIL)
ACTUAL
RETEASE OF
MEETING
DOCUMENTS
MEETING
DOCUMENTS
RELEASED
WITHIN THE
PRESCRIBED
TIMEFRAME(Y for Yes and
N for No)
REMARKS
Sub-Committee onGender andDevelopment
1
1 minutes of themeeting
1 resolution
29 29 23 July2 weeks
before themeeting
Y
SCGAD TechnicalWorking GroupPlanning Workshop
11 minutes of the
meeting22 22 30 September
30September
Y
RegionalProjectMonitoringCommittee
11 minutes of
meeting4 4 2 weeks before
2 weeksbefore
Y
RPMC Team /TWG1
1 minutes ofmeeting
4 4 2 weeks before2 weeksbefore
Y
SectoralCommitteeon InfrastructuralDevelopment
L1 minutes of
meeting19 19 2 weeks before
2 weeksbefore
Y
TOTAT NO. OF DOCUMENTS OF MEETINGS PREPARED=
16 of 16 manutes of meeting (lfit%l4 of 4 chairman's report (100%l18 of 18 resolutions (100%)
% OF MEMBERS WHO WERE SATISFIED
WITH THE COMPTETENESS AND
ACCURACY OF MEETING DOCUMENTS
PREPARED AND RETEASED = 352 of 352members (100%)
% OF MEETING DOCUMENTS
RETEASED WITHIN THE PRESCRIBED
TIMEFRAME = 16 of 16 minutes(100%)
4 of 4 chairman's report (1@%)
18 of 18 resolutions (l(Xl%)
TIMELINESS: Percentage of economic reports submitted to the President within prescribed timefreconomrc repons n W resc 'ame
REGIONAL ECONOMIC
REPORTS
20L4TARGETS
2014 Q3TARGETS
2014 Q3ACTUAL
ACCOMPLISHMENT
RECEIVED NEGATIVE
FEEDBACK ON
COMPLETENESS AND
DATE OF SUBMISSION TO THE
RDC
SUBMITTED
WITHIN THE
PRESCRIBED
Attachment 1
3RD Quarter Calabarzon
Newsletter
% OF ECONOMIC REPORTS SUBMITTED TO
THE PRESIDENT WITHIN PRESCRIBED
TIMEIINE = 1of 1(100%l
% oF ECONOMIC
REPORTS WITH NO
NEGATIVE FEEDBACK
RECEIVED = 1of 1
TOTAL NUMBER OF
ECONOMIC REPORTS=
% OF ECONOMIC REPORTS SUBMITTED TO THE
RDC WITHIN PRESCRIBED TIMEUNE = 1 of 1(1oo%)
% oF ECONOMIC
REFORTSWITH NO
NEGATIVE FEEDBACK
RECEIVED = 1of 1(1oo%)
TOTAT
NUMBEROF
ECONOMIC
REPORTS=
Performance lndicator Set 1
eUANTITy: Number of public investment program documents prepared/ updated.
QUALITy: public investment program documents presented to or endorsed by the appropriate inter-agency committees.
TIMELINESS: Percentage of public investment program documents prepared/ updated within schedule.
ACCURACY OF
(Y for yes and N for no)
TARGET DATE
OF
SUBMISSION
ACTUAL
DATE OF
SUBMISSION
PERIOD
(Y for Yes andN for No)
REMARKS
4 1 1 N 25 Sept 25 Sept Y
4 1 1
TEMPLATE
REGIONAL2014 TARGETS
20L4Accomplishments
RECEIVED NEGATIVE
FEEDBACK ON
ACCUMCY OF
(Y for yes and N for no)
DATE OF SUBMISSION TO
THE RDC
SUBMITTED
WITHIN THE
PRESCRIBED
PERIOD
(Y for Yes and N forNo)
REMARKS
REPORTSQ1 Q2 Q3 Q4 TOT
AL
q1 Q2 Q3 Q4
TARGET
DATE OF
SUBMISSION
ACTUAL
DATE OF
SUBMISSION
1t'SemesterRegional
EconomicSituationer
1 L 1 N25
September25
SeptemberY
1 L 1
Attachment 1
Draft Investment Progra m supportingthe Luzon Spatial DevelopmentFramework 2OL3-2045
Submitted to NRO 3 (as lead)on 28 August.
TOTAT=1of1lLOO%l % OF PUBLIC INVESTMENT
PROGRAM DOCUMENTS
PRESENTED OR ENDORSED BY THE
APPROPRIATE INTER.AGENCY
COMMITTEES=lof1
% OF PUBLIC INVESTMENT PROGRAM
DOCUM ENTS PREPARED/UPDATED WITHINSCHEDULE=1of1(100%l
Performance lndicator Set 2
QUANTITY: Percentage of submitted projects appraised.a. Projects worth 1 billion and aboveb. Projects worth below 1 billion
QUALITY: Percentage of appraised projects presented to the ICC-Technical Board.TIMELINESS: timeframe.
RDC Full Councilconditionallyconfirmed theproject on 25
1. Bauan (Batangas) Municipal HallProject Bauan LGU
2. Rizal Eastlake Development Project PPP CenterRizal Provincial
Government (PG)
Rizal PG to submitthe required ICC andRDC documents.
NRO lV-A met withDPWH PlanningService and Rizal PG
on 25 July and 01
PRESENTED OR ENDORSED
(Yfor Yes and N for No)
TARGET SCHEDULE
OF UPDATING/COMPLETION
ACTUAL DATE OF
UPDATING/COMPLETION
REMARKS
N 28 August 28 August
LIST OF PROJECTS RECEIVED FOR APPRAISAL
LEAD
EVALUATING
UNIT
PROPONENT
AGENCY
Worth l billionand above
(Y for yes andN for No)
Submitted within theprescribed period
{Y for yes and N forNo)
Presented to ICC-
TB
{Yforyes and N
for no)
REMARKS
NRO IV-A N Y N
Y Y
Attachment 1
TOTAT NUMBER OF PROJECTS APPMISED =
2of 2ILOO9/ol
August,respectively, todiscuss the project.
% OF APPRAISAT REPORTS SUBMITTED
WITHfN PRESCRIBED PERIOD =2of 2(1oo%)
TOTAT NUMBER OF AGENCIES
WHICH CONFIRMEDTHE
REVIEW=
Performance lndicator Set 2
QUANTITY: Number of socio-economic assessment reports prepared.
eUALlTy: percentage of socio-economic assessment reports endorsed by the NEDA Secretariat'released within schedule
TIMELINESS: of socio-economic assessment
U pdated Ca la ba rzon Millenniu m Development Goa ls
Scorecard 2013N 16 September 16 September
Not yet endorsedas some agencieshave not submittedvalidated 2013data
% OF REPORTS ENDORSED BY THE NEDA
SECRFTARIAT=0of1(0%l
% OF REPORTS RELEASED WITHIN
SCHEDULE= 1of 1(l(Xl%)TOTAL = 1
MFO 4: MONITORING AND EVATUATION SERVTCES
have confirmed ODA Portfolio Review Report findings.
AGENCIES WHICH CONFIRMED
THE REVIEW
ENDORSED BY THE NEDA SECRETARIAT
(Y for Yes and N for No)NAME OF DOCUMENT
TEMPLATE Attachment 1
No. Of projects monitored 20 20 20 20 80 5 36 23 N Y
Ongoing programs andprojects of five (4)
implementing agencieswere monitoredthroush the SCID
No. of monitoring visitsconducted
\ 1 1 1 4 0 0 2 N YProjects Visited:PSIP and HFEP
No. of RPMES reportsprepared L t L 1 4 0 1 2 N Y
RPMES reportsubmitted to RDC andNEDA CO - MES
Calabarzon On line Project MonitoringSystem Pre-Design
o Conduct of RPMES
Consultation Workshop
Served as facilitatorduring the RPMES
ConsultationWorkhopLayout of theproposed cPMS
homepage design
Conduct of RDRA ValidationWorkshop
2014 TARGETS 2014 ACCOMPLISHMENTSRECEIVED
ADVERSE
FEEDBACK
(Y for Yes and N
for No)
CONDUCTED/PREPARED
WITHINSCHEDULE
{Y for Yes and N
for No)
REMARKSQ1 Q2 Q3 Q4 TOTAL Q1 Q2 Q3
nPROJECT NAME IY 2014 TARGETS FY 2014 Q3 TARGETS
FY 2074 Q3 ACTUAL
ACCOMPLISHMENT
PERCENTAGE OF
ACCOMPLISHMENTREMARKS
L 1 1 700%
TEMPLATE Attachment L
a. Strengthening, Upscaling andMainstreaming International Migrationand Development in Calabarzon (UNDP-
Joint Migration and DevelopmentInitiative Project Phase ll)
1 Quarterly Progress
Report
b. Integrating Disaster Risk Reduction
and Climate Change Adaptation(DRR/CCA) in Local DevelopmentPlanning and Decision-Making Processes
4 of4 Enhanced
PDPFPS Reviewed4 of4 Enhanced PDPFPs
Reviewed
Creation of NEDA4A ICT Core Team Creation of NEDA4A ICT
Core TeamLOO%o
Speech of RD re: Meeting the Challengesof ASEAN 2015 during the URS 13th
Founding Anniversary Celebration
As needed As needed Speech of RD re: Meetingthe Challenges of ASEAN
2015 during the URS 13th
Founding AnniversaryCelebration
TOOo/o
GIS map of roads traversing Laguna de
Bav
As needed As needed GIS map of roadstraversing Laguna de Bay
7OOlo
Recognition of individua l/organizationthat brought honor to the Calabarzonregion
As needed As needed 9 awardees too%
Conduct of Website AdministratorTraining
Conduct ofWebsiteAdministratorTrainins
Conduct of WebsiteAdministratorTraining
Conduct of WebsiteAdministrator Training
too%
Regular updating of the Transparency
Seal page of NEDA websiteAs needed As needed Regular updating of the
Transparency Seal page ofNEDA website
700%
iUPPORTTO OPERATION:
PERFORMANCE INDICATOR FY 2074 TARGETSFY 2014 Q3TARGETS
FY 2OI4 ACTUAL
REPORT
PERCENTAGE OF
ACCOMPLISHMENT
REPORT
REMARKS
TEMPLATE Attachment 1
Redesigning of NEDA Website designaccording to DOSTs prescribed template
Redesigning ofNEDA Websitedesign accordingto DOSIsprescribed
template
Redesigning ofNEDA Websitedesign according toDOST's prescribed
template
Redesigning of NEDA
Website design accordingto DOST's prescribed
template
too%
Revised NEDA Communication templates As needed As needed Revised NEDA
Communication templates(40 templates)
L00%
Designed NRO4A Document TrackingSystem
NRO4A DocumentTracking System
LOO%
Celebration of the 25'n National StatisticsMonth
Hanging ofstreamers
Hanging ofstreamers
Layout and of NSM
streamers
Request for submission ofagency calendar ofactivities related to thecelebration of the 25th
NSM
Consolidated RLAs and
SUCS NSM Activities
NRO |V-A/RDC lV-A NSMActivities
IOOYo
Assistance to local researchers As needed As needed Assisted research fromCavite State U niversity
LOO%
PERFORMANCE INDICATOR
Filled up 1 of 1 positions
PERFORMANCE INDICATOR FY 2074 TARGETSFY 2014 Q3TARGETS
FY 2OL4 ACTUALACCOMPLISHMENT
REPORT
PERCENTAGE OF
ACCOMPLISHMENT
REPORT
REMARKS
Attachment 1TEMPLATE
APPROVED BY:
1. Filling up of 21 vacant positionsin the implementation of NEDA
Rationalization Plan
2. Preparation of 21 aPPointmentsin relation to filling uP of vacantpositions.
21 positions l positionPrepared and facilitatedthe approval of 1 out of 1
approved appointment
100%
3. Conduct Wellness Activity incelebration of CSC Anniversary
1 day activity 1 day activity Conducted 1 day activity LOO%
B. FinancialManagement!. Utilization of received NCA P 5,905,000.00
NCA
P 1,400,187.00received NCA
P 1,399,681.95 disbursedNCA
99.95Yo
Lapsed NCA at the end ofthe quarter is P 505.05
2. COA suspension / disallowance None None None TOOYo
Liquidation of Cash Advance
24 Cash Advance(2 cash advance /
month)5 cash advance
NEDA=3cashadvanceRDC=lcashadvance
66.67Yo
Liquidated - 2 (NEDA)
unliquidated - 1 (NEDA)
- 1 (RDC)
Unliquidated cash
advances were due tooverlapping dates ofactivities.
OIC-Regional Director
NRO IV-A HIGHLIGHTS OF ACCOMPLISHMENT REPORT
3RD QUARTER 2014 For the 3rd Quarter of 2014, NEDA Regional Office (NRO) IV-A has undertaken activities aligned with its expected major final outputs on socio-economic and physical planning and policy services, technical support and advisory, investment programming services, and monitoring and evaluation services. Socio-economic and Physical Planning and Policy Services The NRO IV-A provided assistance to the DENR in the formulation of the Integrated River Management Development Master Plan of Marikina River Basin, which aims to address the various challenges within the Upper and Lower Marikina River Basin. Moreover, the NRO IV-A assisted the DENR in finalizing the Implementing Rules and Regulations of Republic Act No. 9003, also known as the “Ecological Solid Waste Management Act of 2000” as well as provided technical comments and reviews on various policy proposals including Senate Bills related to Integrated Coastal Management, House Bill No. 2909 (Providing for the Allocation of Funds Received from the Utilization of Natural Resources and Creation of Provincial Offshore Natural Resources Economic Development Authority), House Bill No. 4988 (Delineation of the Specific Forest Units of Public Domain), Regional Development Budget Process Framework and NEDA Strategic Performance Management System. The NRO IV-A also participated in the preparation of the Strategic Action Plan for the Rehabilitation and Recovery of Areas affected by Typhoon Glenda (Rammasun). The Rehabilitation Plan was endorsed by the RDC during its 3rd quarter meeting. Relatedly, the NRO IV-A provided technical assistance to Quezon province in the conduct of Rehabilitation and Recovery Summit for Typhoon Glenda, specifically in the preparation of the summit design, facilitation and provision of technical input. In the same period, the NRO IV-A started preparatory work for the updating of the RPFP 2004-2030, which isenvisioned to be prepared in a participatory manner with the involvement of the LGUs and RLAs. The RPFP Work Program was endorsed by the RLUC and initial maps for the RPFP were prepared by the NRO IV-A. Moreover, the NRO IV-A continued to provide assistance in the implementation of the Strengthening, Upscaling and Mainstreaming International Migration and Development (SUMMID) in Calabarzon, which aims to strengthen, upscale and mainstream migration and development in the local level through inclusive and sustainable programs that will minimize social cost and maximize gains of overseas migration. The RDC-CMD ensures that the project activities are aligned and harmonized with the Committee’s activities as well as other regional, national and international events through close coordination with all the five provinces. Financial Literacy Training of Trainers were conducted in Cavite, Laguna and Batangas in partnership with Atikha (NGO partner agency). Other activities related to socio-economic and physical planning and policy services conducted during the third quarter of 2014 include the updating oftheCalabarzon Regional Results Matrix and the formulation of the Regional Development Research Agenda, which contains the research areas/subject matter relating to the region’s growth drivers and list of proposed/pipelined researches identified by the RLAs, SUCs, and LGUs.
Technical Support and Advisory Services Technical Support to Regional Development Council Related Activities The NRO, as secretariat of the RDC, facilitated the conduct of the 3rd Quarter Full Council meeting. Eleven resolutions endorsed and approved by the RDC and were transmitted to concerned entities. Technical and administrative support were provided in the conduct of meetings of the RDC Sectoral Committees on Social, Economic, Infrastructure and Macroeconomy and Development Administration, where the proposed programs, programs and activities submitted to the RDC were deliberated. It provided support to the RPMC and RLUC as a well as served as Secretariat to the RDC Sub-Committees, such as: Regional Information and Communications Technology Committee, Regional Research Committee, Regional Statistical Coordination Committee, Regional Competitiveness Committee, Committee on Migration and Development, and Sub-Committee on Gender and Development. Communication of the Regional Development Plan The NRO IV-A prepared and published the 3rd Quarter Calabarzon Newsletter, which serve as a strategic medium for disseminating the development efforts of the agencies, LGUs, SUCs, and the private sector in the region. Likewise, the NRO IV-A released the Regional Economic Situationerfeaturing the region’s economic performance during the first semester of 2014. The NRO IV-A also conducted redesigning of the NRO IV-A Official Website following the prescribed template provided by the DOST in compliance with the Uniform Website Content Policy. Investment Programming Services The NRO IV-A consolidated the Investment Program supporting the proposed Luzon Spatial Development Framework 2013-2045.The evaluation of the BauanBatangas Municipal Hall Project and initial review of the Rizal Eastlake Development Project were also done during the period. The NRO IV-A also responded to the queryof LGUs regarding projects that are seeking RDC endorsement. Monitoring and Evaluation Services The NRO IV-A through the Sectoral Committee on Infrastructure Development (SCID)and the Regional Project Monitoring Committee conducted project tracking of 12on-goingprograms and projects in the region. Among the projects monitored for their progress include the status of the regional share funds accruing to Calabarzon under the DOE ER 1-94 of DOE; three ongoing bridges of DPWH; obstructions in RROW of roads by DPWH 4A, rehabilitation projects of PNR and related fees and charges of LTO. A field monitoring of sub projects of the PPP School Infrastructure Project and Health Facilities Enhancement Program in Laguna province were also conducted. Project monitoring and evaluation reports were submitted to the RDC and NEDA CO-Monitoring and Evaluation Staff.
For the establishment of a web-based project monitoring system in the Calabarzon, the NRO IV-A initiated the conduct of the RPMES Consultation Workshop. Priortothis, the NRO IV-A conducted a survey to gauge the awareness of stakeholders on the RPMES and web-based project monitoring system. Subsequently, an initial design of the Calabarzon Project Monitoring System was approved by the RPMC and RDC. Technical assistance in terms of coordination, identification and submission of nominees to the SOV 2014 by government agencies and LGUs in the region was also provided by the NRO IV-A. A total of seven individual and organization nominees were validated through the conduct of field visits and onsite interviews of the nominees. On the establishment of the Regional Government Center, the NRO IV-A provided assistance in coordinating a small group meeting attended by the prospective agency occupants and representatives from the Calamba City Government to discuss issues on the use of RGC. Further, an Aide Memoire on the status of the RGC and acquisition of office space by the office was prepared and submitted to DG Balisacan. Other NRO IV-A activities and initiatives • Attendance of NRO IV-A staff to the following trainings: (a) Cost Benefit Analysis of
Projects using STATA; (b) GIS Training; (c) Policy Analysis Course; (d) PPP Capacity Building Project Training-Workshop on Financial Analysis; (e) Public Financial Management Core Team and Financial Officers Seminar-Workshop; (f) Project Development Training; and (g) Supervisory Development Course Track 2.
• Establishment and continuous updating of the NEDA-RDC Local Office File Server to
make all NEDA and RDC related information and reference materials easily accessible to all NRO IV-A staff.
• Implementation of the NRO4A Document Tracking System, which enables the regional
director, assistant regional director, secretary, division chiefs and staff to track office communications online via Google Docs. It also provides a real time facility to post documents for action and generate comments.
• Establishment of a Local File Server containing templates for letters and memos.