Attached+Detached Mid Semester Summary
-
Upload
intje-siswandi -
Category
Documents
-
view
222 -
download
1
description
Transcript of Attached+Detached Mid Semester Summary
Intje Siswandi s3154914ATTACH DETACHWEEK 1: ANALYSING SITUATION
BALCONY TO BALCONY
UNIT DOOR TO DOOR N
Intje Siswandi s3154914ATTACH DETACHWEEK 1: ANALYSING SITUATION
APARTMENT BUILDING TO NEIGHBORHOOD
FRANKLIN
STREET
FRANKLIN
STREET
FRANKLIN
STREET
FRANKLIN
STREET
FRANKLIN
STREET
FRANKLIN
STREET
Attached/Detached • WEEK6 • Site plan Sun Diagram • Intje Siswandi s3154914N
SUMMER
WINTER9 AM
9 AM
12 AM
12 AM 3 PM
3 PM
Attached/Detached • WEEK6 • Proposed SitePlan 1:500 • Intje Siswandi s3154914
FRANKLIN
STREET
N
Attached/Detached • WEEK6 • Sections & Elevations 1:200 • Intje Siswandi
Attached/Detached • WEEK6 • Sections & Elevations 1:200 • Intje Siswandi
Attached/Detached • WEEK6 • SitePlan Krefeld 1:1000• Intje Siswandi s3154914N
Attached/Detached • WEEK7 • Physical Model • Intje Siswandi s3154914
Physical Model experimentsNOTE: the physical model doesn’t represent the mid se-mester design. but instead, it represents the possibility of the new design correction of which the site use doesnt require demolishing the surrounding building in the neigh-bourhood, but only demolishing the existing single apart-ment building.
Attached/Detached • WEEK7 • Physical Model • Intje Siswandi s3154914
Other experiment showing the other arrangement of hous-ing blocks which are arranged vertically so that it will have a similar programs with the existing apartment bulding (high rise reseidential). This idea would be the arrange-ment that would make more sense in terms of the land use of the existing site. Due to the land use inside the CBD where the residencial are more suitable in a form of tower / highrise instead of single housing block.