Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine &...

43
Atomic Energy Civil Aviation S.N S.N Agency Agency Project Name Project Name Pro Code Pro Code DOA DOA Cost Org Cost Org 1 2 3 4 5 6 7 8 9 10 11 12 13 BHAVINI LIMITED NUCLEAR POWER CORPORATION OF INDIA LIMITED NUCLEAR POWER CORPORATION OF INDIA LIMITED NUCLEAR POWER CORPORATION OF INDIA LIMITED URANIUM CORPORATION OF INDIA LIMITED AIRPORT AUTHORITY OF INDIA LIMITED AIRPORT AUTHORITY OF INDIA LIMITED AIRPORT AUTHORITY OF INDIA LIMITED AIRPORT AUTHORITY OF INDIA LIMITED AIRPORT AUTHORITY OF INDIA LIMITED AIRPORT AUTHORITY OF INDIA LIMITED AIRPORT AUTHORITY OF INDIA LIMITED AIRPORT AUTHORITY OF INDIA LIMITED PROTOTYPE FAST BREEDER REACTOR (BHAVINI, 500 MWE) KUDANKULAM APP (NPCIL) KAIGA 3 and 4 UNITS (NPCIL) RAJASTHAN ATOMIC POWER PROJECT 5 and 6 (NPCIL) URANIUM ORE MINE & PROCESSING PLANT AT TUMMALAPALLE D/O KAMARAJ DOMESTIC TER-PH-II & EXP. ANNA INT. TER BLDG C/O EXPANDABLE MODULAR INTEGRATED TER. BULD. RAJA BHOJ AIRPORT CONSTRUCTION OF NEW INTERNATIONAL TERMINAL BLDG. AT SVPI AIRPORT, AHMEDABAD C/O EXPANDABLE MODULAR TER. BULD. AT DABH INDORE D/O OF TERMINAL BLDG. AND PAVEMENT WORKS AT CHENNAI AIRPORT C/O INTEGRATED PASSENGER TER. BULD. NSCBI AIRPORT C/O INTEGERATED CARGO COMPLEX(PH-III) AT CHENNAI AIRPORT CONSTRUCTION OF NEW INTERNATIONAL TERMINAL BUILDING 020100044 020100040 020100041 020100042 N02000007 N04000038 N04000035 N04000017 N04000036 N04000040 N04000037 N04000039 N04000016 09/2003 12/2001 05/2001 04/2002 09/2007 08/2008 03/2008 02/2007 02/2008 01/2008 08/2008 08/2008 10/2006 3492.00 ******** 4213.00 3072.00 1106.29 1273.00 135.04 290.92 135.60 535.00 1942.51 144.94 245.58 Tamil Nadu Tamil Nadu Karnataka Rajasthan Andhra Pradesh Tamil Nadu Madhya pradesh Gujarat Madhya pradesh Tamil Nadu West Bengal Tamil Nadu Kerala State State

Transcript of Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine &...

Page 1: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

Atomic Energy

Civil Aviation

S.N

S.N

Agency

Agency

Project Name

Project Name

Pro Code

Pro Code

DOA

DOA

Cost Org

Cost Org

1

2

3

4

5

6

7

8

9

10

11

12

13

BHAVINI LIMITED

NUCLEAR POWERCORPORATION OFINDIA LIMITED

NUCLEAR POWERCORPORATION OFINDIA LIMITED

NUCLEAR POWERCORPORATION OFINDIA LIMITED

URANIUMCORPORATION OFINDIA LIMITED

AIRPORT AUTHORITYOF INDIA LIMITED

AIRPORT AUTHORITYOF INDIA LIMITED

AIRPORT AUTHORITYOF INDIA LIMITED

AIRPORT AUTHORITYOF INDIA LIMITED

AIRPORT AUTHORITYOF INDIA LIMITED

AIRPORT AUTHORITYOF INDIA LIMITED

AIRPORT AUTHORITYOF INDIA LIMITED

AIRPORT AUTHORITYOF INDIA LIMITED

PROTOTYPE FAST BREEDER REACTOR(BHAVINI, 500 MWE) KUDANKULAM APP (NPCIL) KAIGA 3 and 4 UNITS (NPCIL) RAJASTHAN ATOMIC POWER PROJECT5 and 6 (NPCIL) URANIUM ORE MINE & PROCESSINGPLANT AT TUMMALAPALLE

D/O KAMARAJ DOMESTIC TER-PH-II& EXP. ANNA INT. TER BLDG C/O EXPANDABLE MODULARINTEGRATED TER. BULD. RAJABHOJ AIRPORT CONSTRUCTION OF NEWINTERNATIONAL TERMINAL BLDG.AT SVPI AIRPORT, AHMEDABAD C/O EXPANDABLE MODULAR TER.BULD. AT DABH INDORE D/O OF TERMINAL BLDG. ANDPAVEMENT WORKS AT CHENNAIAIRPORT C/O INTEGRATED PASSENGER TER.BULD. NSCBI AIRPORT C/O INTEGERATED CARGOCOMPLEX(PH-III) AT CHENNAIAIRPORT CONSTRUCTION OF NEWINTERNATIONAL TERMINALBUILDING

020100044

020100040

020100041

020100042

N02000007

N04000038

N04000035

N04000017

N04000036

N04000040

N04000037

N04000039

N04000016

09/2003

12/2001

05/2001

04/2002

09/2007

08/2008

03/2008

02/2007

02/2008

01/2008

08/2008

08/2008

10/2006

3492.00

********

4213.00

3072.00

1106.29

1273.00

135.04

290.92

135.60

535.00

1942.51

144.94

245.58

Tamil Nadu

Tamil Nadu

Karnataka

Rajasthan

AndhraPradesh

Tamil Nadu

Madhyapradesh

Gujarat

Madhyapradesh

Tamil Nadu

West Bengal

Tamil Nadu

Kerala

State

State

Page 2: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

CoalS.N Agency Project Name Pro Code DOA Cost Org

14

15

16

17

18

19

20

21

22

23

24

25

26

AIRPORT AUTHORITYOF INDIA LIMITED

BHARAT COKING COALLIMITED

CENTRAL COALFIELDS LIMITED

CENTRAL COALFIELDS LIMITED

EASTERN COALFIELDS LIMITED

EASTERN COALFIELDS LIMITED

EASTERN COALFIELDS LIMITED

EASTERN COALFIELDS LIMITED

EASTERN COALFIELDS LIMITED

EASTERN COALFIELDS LIMITED

MAHANADI COALFIELDS LIMITED

MAHANADI COALFIELDS LIMITED

MAHANADI COALFIELDS LIMITED

C/O NEW EXPANDABLE MODULARINTEGRATED BLDG. RAIPURAIRPORT

Batura OC ASHOK EXPN.OCP -CCL (6.5 MTY) MAGADH OC (CCL) JHANJRA LONGWAL UG PHASE II AUGMENTATION OF PRODUCTION ATSAPRI UG MINE NARAYANKURI UG CHITRA EAST OCP JHANJRA CONTINEOUS MINAR FORUG-II RAJMAHAL OC EXP. KULDA OCP (MAHANADI COALFIELDSLTD.) LAKHANPUR OC EXP. PROJECT PH-II HINGULA OC-II EXP. PH-II (15MTY)

N04000034

N06000049

060100096

N06000015

N06000020

N06000058

N06000059

N06000060

N06000057

N06000056

060100092

N06000069

N06000068

03/2008

09/2008

04/2006

07/2006

11/2006

09/1987

02/2009

08/2007

02/2009

02/2006

01/2005

03/2004

11/2008

129.65

203.82

471.66

469.78

287.18

147.86

149.06

112.69

122.35

50.08

302.96

98.74

475.93

Chhatisgarh

Madhyapradesh

Jharkhandd

West Bengal

West Bengal

West Bengal

Jharkhandd

West Bengal

Jharkhandd

Orissa

Orissa

Orissa

State

Page 3: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

27

28

29

30

31

32

33

34

35

36

37

38

39

40

MAHANADI COALFIELDS LIMITED

MAHANADI COALFIELDS LIMITED

MAHANADI COALFIELDS LIMITED

MAHANADI COALFIELDS LIMITED

MAHANADI COALFIELDS LIMITED

MAHANADI COALFIELDS LIMITED

MAHANADI COALFIELDS LIMITED

NEYVELI LIGNITECORPORATION

NEYVELI LIGNITECORPORATION

NEYVELI LIGNITECORPORATION

NEYVELI LIGNITECORPORATION

NEYVELI LIGNITECORPORATION

NORTHERN COALFIELDS LIMITED

NORTHERN COALFIELDS LIMITED

ANANTA OC EXPANSION PH-II BALRAM OCP EXTENSION BHARATPUR OC EXPANSION PHASE-III PROJECT BHUBANESWARI OCP KANIHA OCP TALABIRA OCP GOPAL PRASAD OCP TPS-II EXPANSION (1470MW TO1970MW) (NLC) EXPANSION OF MINE-II (10.5MTPA TO 15.0 MTPA) (NLC) BARSINGSAR TPS (2X125MW) (NLC) TUTICORIN THERMAL POWERPROJECT BARSINGSAR LIGNITE MINE 2.10MTPA (NLC) KRISHNASHILA (NCL) (4MTY) AMLOHRI EPR (NCL) (6 MTY)

N06000067

N06000044

N06000030

N06000034

N06000035

N06000043

N06000042

060100087

060100088

060100089

N06000047

060100090

N06000007

N06000010

08/2008

12/2007

02/2007

12/2007

12/2007

03/2008

02/2008

10/2004

10/2004

12/2004

05/2008

12/2004

05/2006

05/2006

207.28

172.08

131.39

490.10

457.77

447.72

395.87

2030.78

2161.28

1114.18

4904.54

254.07

789.88

1352.04

Orissa

Orissa

Rajasthan

Orissa

Orissa

Orissa

Orissa

Tamil Nadu

Rajasthan

Tamil Nadu

Rajasthan

Madhyapradesh

Madhyapradesh

Page 4: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

Health & Family Welfare

41

42

43

44

45

46

47

48

49

50

51

52

53

54

NORTHERN COALFIELDS LIMITED

NORTHERN COALFIELDS LIMITED

NORTHERN COALFIELDS LIMITED

SECL

SECL

SECL

SINGARENI COLLIERSCOMPANY LIMITTED

SINGARENI COLLIERSCOMPANY LIMITTED

SINGARENI COLLIERSCOMPANY LIMITTED

SINGARENI COLLIERSCOMPANY LIMITTED

SOUTH-EASTERN COALFIELDS LIMITED

SOUTH-EASTERN COALFIELDS LIMITED

SOUTH-EASTERN COALFIELDS LIMITED

WESTERN COALFIELDS LIMITED

BINA EXTN. PROJ NIGAHI OC EXPANSION PROJECT 10MTY TO 15 MTY, SINGRAULI BLOCK-B OCP NCL (3.5 MTY) PELMA OC CHURCHA UG BAROUD OC EXPANSION ADRIYALA SHAFT PROJECT SHANTIKHANI LONGWALL PROJ-SCCL JALLARAM SHAFT PROJECT KAKATIYA LAONGWALL GEVRA EXPANSION OCP (SECL) (25MTY) DIPKA EXPANSION OCP (SECL) (20MTY) KUSMUNDA EXPN.OCP(SECL)(10MTY) PENGANGA OC

N06000019

N06000033

N06000009

N06000045

N06000046

N06000065

N06000016

N06000017

N06000025

N06000048

060100093

060100094

N06000008

N06000066

11/2006

10/2007

06/2006

07/2008

06/2008

07/2008

09/2006

10/2006

03/2013

12/2008

07/2005

07/2005

06/2006

10/2008

168.97

529.40

746.04

448.32

462.35

135.58

212.34

249.03

467.78

453.63

1667.55

1268.53

737.65

339.77

Multi State

Madhyapradesh

Madhyapradesh

Chhatisgarh

Chhatisgarh

Chhatisgarh

AndhraPradesh

AndhraPradesh

AndhraPradesh

AndhraPradesh

Chhatisgarh

Chhatisgarh

Chhatisgarh

Maharashtra

Page 5: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

Mines

Petroleum

S.N

S.N

S.N

Agency

Agency

Agency

Project Name

Project Name

Project Name

Pro Code

Pro Code

Pro Code

DOA

DOA

DOA

Cost Org

Cost Org

Cost Org

55

56

57

58

59

60

61

62

63

64

65

66

67

HEALTH & FAMILYWELFARE

NATIONAL ALUMINUMCOMPANY LIMITED(NALCO)

BHARAT PETROLEUMCORPORATIONLIMITED

BONGAIGAONREFINERY PETROLEUMLIMITED

BONGAIGAONREFINERY PETROLEUMLIMITED

GAS AUTHORITY OFINDIA LIMITED

GAS AUTHORITY OFINDIA LIMITED

GAS AUTHORITY OFINDIA LIMITED

GAS AUTHORITY OFINDIA LIMITED

GAS AUTHORITY OFINDIA LIMITED

GAS AUTHORITY OFINDIA LIMITED

GAS AUTHORITY OFINDIA LIMITED

GAS AUTHORITY OFINDIA LIMITED

NORTH EAST INDIRA GANDHI INST-ITUTE OF HEALTH AND MS

SECOND PHASE EXPANSION OFCAPTIVE ALUMINIUM,SMELTER ANDPOWER PLANT

CRUDE OIL RECEIPTFACILITIES,KOCHI REFINERY DIESEL HYDRO TREATMENTPROJECT,BRPL DHALIGAON MSQ IMPROVMENT PROJECT CHAINSA-JHAJJAR PIPE LINEPROJECT VIJAPUR DADRI-BAWANA PIPE LINEPROJECT SULTANPUR NEEMRANA PIPE LINEPROJECT COMPRESSOR STATIONS (VIJAYPURAND JHABUA) PHASE-I & II KOCHI-KANJIRKOD BANGALORE-MANGALORE PIPELINE PROJECT BAWANA NANGAL PIPE LINEPROJECT CAPACITY AUGMENTATION OF AGRA&FEROZABAD REGION JHAJJAR HISSAR PIPE LINEPROJECT

210100001

100100054

N16000028

N16000009

N16000040

N16000047

N16000048

N16000049

N16000053

N16000071

N16000050

N16000074

N16000051

05/1986

10/2004

04/2006

06/2006

04/2008

11/2007

11/2007

11/2007

11/2007

06/2009

10/2010

07/2009

11/2007

71.18

4091.51

2591.80

1431.91

293.60

967.77

5595.31

396.13

1512.00

3032.00

1816.07

199.57

281.07

Meghalaya

Kerala

Assam

Haryana

Multi State

Multi State

Multi State

Multi State

Delhi

UttarPradesh

Haryana

State

State

State

Page 6: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

68

69

70

71

72

73

74

75

76

77

78

79

80

81

GAS AUTHORITY OFINDIA LIMITED

GAS AUTHORITY OFINDIA LIMITED

GAS AUTHORITY OFINDIA LIMITED

GAS AUTHORITY OFINDIA LIMITED

GAS AUTHORITY OFINDIA LIMITED

HINDUSTANPETROLEUMCORPORATIONLIMITEDHINDUSTANPETROLEUMCORPORATIONLIMITEDHINDUSTANPETROLEUMCORPORATIONLIMITEDHINDUSTANPETROLEUMCORPORATIONLIMITEDHINDUSTANPETROLEUMCORPORATIONLIMITEDHINDUSTANPETROLEUMCORPORATIONLIMITEDHINDUSTANPETROLEUMCORPORATIONLIMITEDHINDUSTANPETROLEUMCORPORATIONLIMITEDHINDUSTANPETROLEUM

COMPRESSOR STATIONS (KAILARAS&CHAINSA) DAHEJ-VIJAYPUR PIPE LINEPROJECT DHABOL-BANGALORE PIPELINEPROJECT JAGDISHPUR-HALDIA PIPELINEPROJECT MORADABAD-KASHIPUR-RUDRAPURPIPELINE PROJECT. INSTALLATION OF FCCV AT MUMBAIREFINERY LUBDE OIL BASE STOCK QUALITYUPGRADATION AT MUMBAI REFINERY CLEAN FUELS PROJECT AT VISAKHREFINERY(HPCL) CONSTRUCTION OF NEW TERMINALAT ENNORE CHENNAI SINGLE POINT MOORING PROJECTAT VISAKHAPATNAM DIESEL HYDROTREATOR PROJECT ATVISAKH REFINERY Guru Govind Singh RefinaryProduct Evacuation DIESEL HYDROTREATOR PROJECT ATMUMBAI REFINERY RESITMENT OF MARKETINGINSTALATION AT VISAKH

N16000054

N16000052

N16000073

N16000072

N16000070

N16000056

N16000026

160100281

N16000066

N16000067

N16000068

N16000076

N16000069

N16000057

11/2007

11/2007

06/2009

07/2009

07/2009

03/2007

10/2006

04/2003

01/2008

11/2008

03/2009

01/2009

03/2009

01/2009

1061.93

4429.38

4543.43

7596.18

238.68

900.47

638.90

1635.00

224.00

643.46

3597.00

605.40

3284.00

756.00

Multi State

Gujarat

Karnataka

Gujarat

Multi State

Maharashtra

Maharashtra

AndhraPradesh

Tamil Nadu

AndhraPradesh

AndhraPradesh

Punjab

Maharashtra

AndhraPradesh

Page 7: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

82

83

84

85

86

87

88

89

90

91

92

93

94

95

CORPORATIONLIMITED

INDIAN OILCORPORATIONLIMITED

INDIAN OILCORPORATIONLIMITED

INDIAN OILCORPORATIONLIMITED

INDIAN OILCORPORATIONLIMITED

INDIAN OILCORPORATIONLIMITED

INDIAN OILCORPORATIONLIMITED

INDIAN OILCORPORATIONLIMITED

INDIAN OILCORPORATIONLIMITED

INDIAN OILCORPORATIONLIMITED

INDIAN OILCORPORATIONLIMITED

INDIAN OILCORPORATIONLIMITED

INDIAN OILCORPORATIONLIMITED

INDIAN OILCORPORATIONLIMITED

INDIAN OILCORPORATION

PANIPAT NAPHTA CRACKER PROJECT MSQ UPGRADATION PROJECT ATPANIPAT REFINERY INST. OF FACILITIES FORIMPROVEMENT IN DIESEL QUALITY(IOCL) MSQ UPGRADATION PROJECT ATDIGBOI REFINERY MSQ UPGRADATION PROJECT ATGUWAHATI REFINERY DADRI- PANIPAT R-LNG SPURPIPELINE PARADIP REFINERY PROJECT MSQ UPGRADATION PROJECT ATBARAUNI REFINERY Construction of Tanks andBlending Facility at Vadinar Construction of Tank andBlending Facility at Vadinar INST. OF FCC GASOLINEDESULPHUN UNIT AT MATHURAREFINERY BRANCH PIPELINE FROM KSPLVIRAMGAON TO KANDLA EXPANSION OF PANIPAT REFINERYFROM 12 TO 15 MMTPA CHENNAI-BANGALORE PIPELINE

160100292

N16000035

160100289

N16000037

N16000036

N16000018

N16000058

N16000038

N16000077

N16000075

N16000034

N16000059

N16000017

N16000029

04/2006

01/2008

11/2005

04/2008

04/2008

06/2005

02/2009

04/2008

02/2009

02/2009

01/2008

02/2009

06/2005

07/2007

********

1131.00

1876.00

356.00

372.00

250.66

********

1492.00

267.00

267.00

348.00

349.00

806.00

232.11

Haryana

West Bengal

Assam

Assam

Haryana

Orissa

Bihar

Gujarat

Gujarat

UttarPradesh

Gujarat

Haryana

Multi State

Page 8: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

96

97

98

99

100

101

102

103

104

105

106

107

108

109

LIMITED

INDIAN OILCORPORATIONLIMITED

OIL & NATURAL GASCORPORATIONLIMITED

OIL & NATURAL GASCORPORATIONLIMITED

OIL & NATURAL GASCORPORATIONLIMITED

OIL & NATURAL GASCORPORATIONLIMITED

OIL & NATURAL GASCORPORATIONLIMITED

OIL & NATURAL GASCORPORATIONLIMITED

OIL & NATURAL GASCORPORATIONLIMITED

OIL & NATURAL GASCORPORATIONLIMITED

OIL & NATURAL GASCORPORATIONLIMITED

OIL & NATURAL GASCORPORATIONLIMITED

OIL & NATURAL GASCORPORATIONLIMITED

OIL & NATURAL GASCORPORATIONLIMITED

OIL & NATURAL GASCORPORATION

RESIDUE UPGRADATION AND MS/HSDQUALITY IMPROVEMENT PROJECT ATGUJRAT IOR LAKWA - LAKHMANI (ONGCL) DEVELOPMENT OF B-193 CLUSTERFIELDS DEVELOPMENT OF B-46 CLUSTERFIELD LPG PROCESSING & COMPRESSION INTEGRATED DEV OF G1 and GS-15(ONGCL) ASSAM RENEWAL PROJECT FORGROUP A C2-C3 AND LPG RECOVERY FROMLNG, DAHEJ (ONGC) ADDITIONAL GAS PROCESSINGUNITS AT URAN BARGE BUMPER-BOAT LANDING-RISER PROTECTOR PROJECT PH-II IOR, RUDRASAGAR (ONGCL) TWO PIPELINE REPLACEMENTPROJECT AT AHMEDABAD MEHSANA CONSTRUCTION OF NEW PROCESSCOMPLEX MHN NEELAM RECONSTRUCTION

N16000021

160100215

N16000033

N16000046

N16000041

160100231

N16000061

160100168

N16000064

N16000055

160100217

N16000042

N16000030

N16000063

01/2007

09/2001

06/2007

06/2007

08/2007

04/2003

03/2009

12/2003

10/2008

05/2008

09/2001

03/2008

01/2007

05/2008

5693.00

345.10

3248.78

1436.21

142.00

429.82

2465.15

900.92

1797.35

289.60

113.90

188.18

2853.29

305.08

Gujarat

Assam

Maharashtra

Maharashtra

AndhraPradesh

Multi State

Assam

Gujarat

Maharashtra

Maharashtra

Assam

Gujarat

Maharashtra

Maharashtra

Page 9: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

PowerS.N Agency Project Name Pro Code DOA Cost Org

110

111

112

113

114

115

116

117

118

119

120

121

122

LIMITED

OIL & NATURAL GASCORPORATIONLIMITED

OIL & NATURAL GASCORPORATIONLIMITED

OIL & NATURAL GASCORPORATIONLIMITED

OIL & NATURAL GASCORPORATIONLIMITED

OIL & NATURAL GASCORPORATIONLIMITED

OIL & NATURAL GASCORPORATIONLIMITED

OIL & NATURAL GASCORPORATIONLIMITED

OIL & NATURAL GASCORPORATIONLIMITED

OIL & NATURAL GASCORPORATIONLIMITED

OIL & NATURAL GASCORPORATIONLIMITED

OIL & NATURAL GASCORPORATIONLIMITED

NATIONAL HYDRO-ELECTRIC POWERCORPORATION

NATIONAL HYDRO-ELECTRIC POWERCORPORATION

OFFSHORE GRIDINTERCONNECTIVITY PROJECT INMUMBAI HIGH MUMBAI HIGH NORTH DEVELOPMENTPHASE-II HEERA RECONSTRUCTION REVAMPING OF WIN PLATFORM ATMH ASSET MNW-NF BRIDGE PROJECT ADDITIONAL GAS PROCESSINGFACILITI AT HAZIRA MUMBAI HIGH SOUTHREDEVELOPMENT PH-2 DEVELOPMENT OF B-22 CLUSTERFIELDS HEERA AND SOUTH HEERA RE-DEVELOPMENT PROJECT IOR GELEKI (ONGCL) DEVELOPMENT OF C-SERIES FIELDS

LOKTAK D/S HEP(NHPC) TEESTA LOW DAM HEP, STAGE-IV(NHPC)

N16000031

N16000060

N16000062

N16000044

N16000045

N16000065

N16000039

N16000032

N16000024

160100216

N16000023

180100078

180100243

01/2007

01/2009

05/2008

05/2008

05/2008

02/2008

06/2007

01/2007

09/2006

09/2001

08/2006

12/1999

09/2005

740.02

6855.93

706.70

333.40

175.21

370.11

1252.75

1552.63

2305.30

390.09

3195.16

578.62

1061.38

Maharashtra

Maharashtra

Maharashtra

Maharashtra

Maharashtra

Gujarat

Maharashtra

Maharashtra

Maharashtra

Assam

Maharashtra

Manipur

West Bengal

State

Page 10: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

123

124

125

126

127

128

129

130

131

132

133

134

135

136

NATIONAL HYDRO-ELECTRIC POWERCORPORATION

NATIONAL HYDRO-ELECTRIC POWERCORPORATION

NATIONAL HYDRO-ELECTRIC POWERCORPORATION

NATIONAL HYDRO-ELECTRIC POWERCORPORATION

NATIONAL HYDRO-ELECTRIC POWERCORPORATION

NATIONAL HYDRO-ELECTRIC POWERCORPORATION

NATIONAL HYDRO-ELECTRIC POWERCORPORATION

NATIONAL HYDRO-ELECTRIC POWERCORPORATION

NATIONAL HYDRO-ELECTRIC POWERCORPORATION

NATIONAL HYDRO-ELECTRIC POWERCORPORATION

NATIONAL HYDRO-ELECTRIC POWERCORPORATION

NATIONAL THERMALPOWER CORPORATION

NATIONAL THERMALPOWER CORPORATION

NATIONAL THERMALPOWER CORPORATION

EST. OF 400/220 KV GIS POOLINGSTATION NEAR CHAMERA-III HEP KISHANGANGA HEP CHUTAK HYDRO-ELECTRIC PROJECT NIMOO BAZGO HYDROELECTRICPROJECT URI H.E.P STAGE -II (NHPC) PARBATI H.E.P. STAGE -III(NHPC) CHAMERA,STAGE-III (NHPC) SEWA- II H.E.P (NHPC) LOWER SUBANSIRI H.E.P (NHPC) PARBATI HEP (NHPC) II TESSTA LOW DAM STAGE - II, III (NHPC) KOLDAM HEP (NTPC) Farakka STPP Stage-III BARH STPP STAGE -II

N18000040

N18000031

N18000007

N18000006

180100251

180100250

180100241

180100220

180100221

180100210

180100222

180100211

N18000016

N18000047

09/2007

07/2007

08/2006

08/2006

08/2005

10/2005

08/2005

09/2003

09/2003

09/2002

10/2003

10/2002

07/2006

02/2008

262.10

2238.67

621.26

611.01

1729.29

2304.56

1405.63

665.46

6285.33

3919.59

768.92

4527.15

2570.44

7341.04

Himachal Pr.

J & K

J & K

J & K

J & K

Himachal Pr.

Himachal Pr.

J & K

ArunachalPr.

Himachal Pr.

West Bengal

Himachal Pr.

West Bengal

Bihar

Page 11: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

137

138

139

140

141

142

143

144

145

146

147

148

149

150

NATIONAL THERMALPOWER CORPORATION

NATIONAL THERMALPOWER CORPORATION

NATIONAL THERMALPOWER CORPORATION

NATIONAL THERMALPOWER CORPORATION

NATIONAL THERMALPOWER CORPORATION

NATIONAL THERMALPOWER CORPORATION

NATIONAL THERMALPOWER CORPORATION

NATIONAL THERMALPOWER CORPORATION

NATIONAL THERMALPOWER CORPORATION

NHPCL

NORTH EASTELECTRIC POWERCORPORATION

NORTH EASTELECTRIC POWERCORPORATION

NORTH EASTELECTRIC POWERCORPORATION

NORTH EASTELECTRIC POWER

BONGAIGAON THERMAL POWERPROJECT SIMHADRI STPP STAGE -II Tapovan-Vishnugad HEP(4x130MW) National Capital Thermal PowerProject Stage-II KORBA STPP STAGE-III LOHARINAG-PAL HEP(4X150MW) SIPAT STPP STAGE - I (NTPC) BARH STPP(3X660MW) NTPC MOUDA STPP EASTERN REGION STRENGTHENINGSCHEME-II KAMENG HYDROELECTRIC PROJECT(NEEPCO) PARA HYDRO ELECTRIC PROJECT TUIRIAL HE PROJECT(NEEPCO) TRIPURA GAS BASED POWERPROJECT

N18000041

N18000032

N18000014

N18000013

N18000011

N18000005

180100229

180100242

N18000048

N18000033

180100239

N18000045

180100165

N18000071

01/2008

08/2007

11/2006

10/2006

08/2006

06/2006

12/2003

12/2003

11/2007

12/2007

12/2004

12/2008

07/1998

07/2009

4375.35

5103.39

2978.48

5135.33

2448.50

2895.10

8323.39

8692.97

5459.28

227.52

2496.90

573.99

368.72

421.01

Assam

AndhraPradesh

Uttaranchal

UttarPradesh

Madhyapradesh

Uttaranchal

Chhatisgarh

Bihar

Maharashtra

Multi State

ArunachalPr.

ArunachalPr.

Mizoram

Tripura

Page 12: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

151

152

153

154

155

156

157

158

159

160

161

162

163

164

CORPORATION

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OF

SYSTEM STRENGTHENING - VII OFSOUTHERN REGION (PGCIL) TRANSMISSION SY. ASSOCIATEDWITH BARH GENER.PROJECT(P.GR.) KOLDAM HEP TRANSMISSION LINE(PGCIL) TRANSMISSION SYSTEM ASSOCIATEDWITH PARBATI = II HEP SIPAT-II SUPP. TRANS. SYSTEM(PGCIL) WESTERN REGION STRENGTHENINGSCHEME-II KUNADANKULAM-APP TRANS. SYSTEM(PGCIL) SYSTEM STRENGTHENING IN SOUTH-WESTERN PART OF NORTHERN GRID(PART-B) SCHEME WESTERN REGION STRENGHTENINGSCHEME-IX SUPPLIMENTARY TRANSMISSIONASSOCIATED WITH DVC ANDMAITHON RBC NORTHERN REGION SYSTEMSTRENGHTENING SCHEME-IX EASTERN REGION STRENGTHENINGSCHEME-I NEYVELI TS-II TRANSIMISSIONSYSTEM (PGCIL) NORTHERN REGION SYSTEMSTRENGTHENING SCHEME-VI

180100253

180100260

180100263

180100261

180100257

N18000022

180100258

N18000020

N18000050

N18000065

N18000055

N18000004

180100247

N18000021

05/2005

12/2005

09/2005

12/2005

06/2005

07/2006

05/2005

10/2006

04/2008

08/2008

07/2008

10/2006

01/2005

01/2007

279.30

3779.46

464.91

358.42

813.67

5221.23

1779.29

150.26

230.89

2360.95

525.14

975.96

691.83

186.95

Tamil Nadu

Bihar

Himachal Pr.

Himachal Pr.

Chhatisgarh

Rajasthan

Tamil Nadu

Multi State

Multi State

Multi State

Multi State

UttarPradesh

Tamil Nadu

Multi State

Page 13: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

165

166

167

168

169

170

171

172

173

174

175

176

177

178

INDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OF

EAST-WEST TRANSNISSIONCORRIDOR STRENGTHNING SCHEME TR. SYSTEM ASSOCIATED WITHMUNDRA ULTRA MEGA POWERPROJECT NORTHERN REGION SYSTEMSTRENGHTENING SCHEME-XV TR. SYSTEM ASSOCIATED WITHCHAMERA III HEP SYSTEM STRANGHTENING SCHEME-VIII OF SOUTHERN REGION 765 KV POOLING STATION &NETWORK WITH DVC AND MAITHOBRBC KAIGA 3 AND 4 TRANSMISSIONSYSTEM (PGCIL) ENHANCEMENT OF TRANSMISSIONCAPACITY IN EAST-WEST CORRIDOROF NR 765 KV SYSTEM FOR CENTRAL PARTOF NORTHERN GRID PART-I SYSTEM STRENGHTENING -XI INSOUTHERN REGION NORTH- EAST NORTH WESTERNINTERCONNECTOR I PROJECT TR. SYSTEM ASSOCIATED WITHRAMPUR HEP TR. SYSTEM ASSOCIATED WITHTUTICORIN JV TPS SYSTEM STRENGHTENING SCHEME-IXOF SOUTHERN REGIONAL GRID

260100100

N18000061

N18000052

N18000064

N18000070

N18000069

180100246

N18000026

N18000068

N18000067

N18000066

N18000063

N18000062

N18000060

06/2006

10/2008

02/2009

04/2008

02/2008

08/2008

03/2005

10/2006

02/2009

03/2009

02/2009

02/2009

02/2009

02/2009

803.70

4824.12

520.48

297.37

105.84

7075.33

596.45

103.80

1347.32

196.10

********

184.19

353.57

120.62

Multi State

Multi State

Multi State

Multi State

Multi State

Multi State

Karnataka

Multi State

Multi State

Multi State

Multi State

Multi State

Multi State

Karnataka

Page 14: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

179

180

181

182

183

184

185

186

187

188

189

190

191

192

INDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OF

TRANSMISSION SYSTEM ASSOCIATEDWITH SASAN ULTRA MEGA POWERPROJECT SYSTEM STRENGHTENING IN NRGRID FOR KARCHAM WANGTOO HEP TRANSMISSION SYSTEM ASSOCIATEDWITH FARAKKA-III NORTHERN REGION SYSTEMSTRENGHTENING SCHEME-XII WESTERN REGION STREGTHENINGSCHEME-VI TR. SYSTEM FOR STARTUP POWERTO DVC & MAITHON RB GEN. PROJ. NORTHERN REGION SYSTEMSTRENGTHENING SCHEME-X WESTERN REGION STRENGTHENINGSCHEME-V NORTHERN REGION SYSTEMSTRENGTHENING-XI TRANSMISSION SYSTEM ASSOCIATEDWITH URI-II TRANSMISSION SYSTEM ASSOCIATEDWITH PARBATI-III HEP NORTHERN REGION SYSTEMSTRENGHTENING SCHEME-V TR. SYSTEM ASSOCIATED WITHCORBA III GENERATION PROJECT NORTHERN REGION SYSTEMSTRENGHTENING SCHEME-XVII

N18000046

N18000044

N18000043

N18000039

N18000038

N18000037

N18000036

N18000035

N18000034

N18000023

N18000018

N18000017

N18000059

N18000058

12/2008

12/2008

12/2008

02/2008

02/2008

04/2008

12/2007

12/2007

12/2007

10/2006

07/2006

06/2006

02/2009

02/2009

7031.88

328.97

204.07

261.55

340.72

290.49

408.36

477.69

417.76

238.25

557.24

721.25

276.61

210.79

Multi State

Multi State

Multi State

Haryana

Gujarat

Haryana

UttarPradesh

Maharashtra

Multi State

J & K

Himachal Pr.

Multi State

Madhyapradesh

Rajasthan

Page 15: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

RailwaysS.N Agency Project Name Pro Code DOA Cost Org

193

194

195

196

197

198

199

200

201

202

203

204

205

INDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

POWER GRIDCORPORATION OFINDIA LIMITED

SATLUJ JAL VIDYUTNIGAM LIMITED

TEHRI HYDRODEVELOPMENTCORPORATIONLIMITEDTEHRI HYDRODEVELOPMENTCORPORATIONLIMITEDTEHRI HYDRODEVELOPMENTCORPORATIONLIMITED

(NR)

(NR)

NORTHERN REGION SYSTEMSTRENGHTENING SCHEME-XIV NORTHERN REGION SYSTEMSTRENGHTENING SCHEME-XIX NORTHERN REGION SYSTEMSTRENGHTENING SCHEME-XIII NORTHERN REGION SYSTEMSTRENGHTENING SCHEME-XVIII WESTERN REGION SYSTEMSTRENGHTENING SCHEME-XI WESTERN REGION STRENGHTENINGSCHEME-X KOTESWAR TRANSMISSION SYSTEM(PGCIL) RAMPUR HEP(412 MW) KOTESHWAR HEP(THDC) TEHRI PUMPED STORAGEPLANT(1000MW) VISHNUGAD PIPALKOTI HYDROELECTRIC PROJECT

UDHAMPUR-SRINAGAR-BARAMULLA(NL),NR NANGALDAM-TALWARA(NL),NR

N18000057

N18000056

N18000054

N18000053

N18000051

N18000049

180100256

N18000024

180100184

N18000010

N18000042

220100133

220100188

02/2009

02/2009

02/2009

02/2009

02/2009

02/2009

06/2006

01/2007

04/2000

07/2006

08/2008

03/1995

03/1981

132.19

410.29

317.69

509.66

409.50

664.96

260.34

2047.03

1301.56

1657.00

2491.58

2500.00

37.68

Multi State

Multi State

Multi State

Multi State

Multi State

Multi State

Uttaranchal

Uttaranchal

Uttaranchal

Uttaranchal

J & K

Multi State

State

Page 16: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

206

207

208

209

210

211

212

213

214

215

216

217

218

219

(NR)

(NR)

(NR)

(NR)

(NR)

CR

CR

CR

CR

ECR

ECR

ECR

ECR

ECR

JALANDHAR-PATHANKOT-JAMMU-TAWI(LD),NR HAPUR-KANKATHER (LD),NR JIND-SONEPAT (NL),NR REWARI-ROHTAK (NL),NR CHANDIGARH-LUDHIANA(NEW BGLINE),NR AMRAVATI-NARKHER NL(CR) MIRAJ-LATUR ROAD(GC),CR BARAMATI - LONAND (NL), CR AHMEDNAGAR-PARLI VAIJNATH(NL)CR LANJHIGARH-JUNAGARH NL(ECOR) RAJGIR-TILAIYA (NL), ECR DANIAWAN-BIHARSARIF (NL), ECR BIHARSHARIFF-BARBIGHA (NL),ECR BARBIGHA - SHEKHPURA + NEORA-DANIAWAN (NL), ECR

220100258

220100278

220100280

220100279

220100241

220100118

220100162

220100271

220100181

220100148

220100312

220100311

220100310

220100309

03/2002

04/2003

01/2004

01/2004

07/1997

06/1994

04/1993

03/1998

02/1997

04/1993

04/2001

04/2001

04/2001

04/2002

409.00

106.64

190.81

149.38

248.44

120.90

225.00

75.00

353.08

100.00

180.82

104.79

103.86

120.23

Multi State

UttarPradesh

Haryana

Haryana

Punjab

Maharashtra

Maharashtra

Maharashtra

Maharashtra

Orissa

Bihar

Bihar

Bihar

Bihar

Page 17: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

220

221

222

223

224

225

226

227

228

229

230

231

232

233

ECR

ECR

ECR

ECR

ECR

ECR

ECR

ECR

ECR

ECR

ECR

ECR

ECR

ER

PATNA GANGA BRIDGE (NL), ECR RAIL-CUM-ROAD BRIDGE AT MUNGER(NL), ECR KODERMA GIRIDH (NL), ECR KODERMA-TILAIYA (NL), ECR KOSI BRIDGE (NL), ECR JAYANAGAR-DARBHANGA-NARKATIAGANJ(GC),ECR MANSI-PURNIA (EXTENSION OFMANSI-SAHARSA) GAN TALCHER-BIMALAGARH(NL)(ECOR) HAJIPUR-SUGAULI VIA VAISHALI(NL), ECR KHURDA ROAD-BOLANGIR(NL)ECOR KHAGARIA-KUSHESHWAR ASTHAN(NL) (ECR) KODERMA-RANCHI VIA BARKAKHANA(NL),ECR MUZAFFARPUR-SITAMARHI(NL),ECR MANDARHILL-DUMKA-RAMPURHAT(NL),ER

220100308

220100307

220100306

220100305

220100304

220100240

N22000002

220100328

220100303

220100284

220100257

220100222

220100194

220100168

04/2001

04/2002

04/1996

04/2002

04/2002

04/1997

04/1996

04/2005

04/2003

04/1994

03/1997

03/1999

03/1997

04/1995

624.47

921.00

371.36

459.91

323.41

233.00

114.01

726.96

324.66

355.38

78.23

491.19

100.00

184.00

Bihar

Bihar

Jharkhandd

Jharkhandd

Bihar

Bihar

Bihar

Orissa

Bihar

Orissa

Bihar

Jharkhandd

Bihar

Jharkhandd

Page 18: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

234

235

236

237

238

239

240

241

242

243

244

245

246

247

ER

ER

ER

FREIGHT OPERATIONINFORMATION SYSTEM

GAUGE CONVERSION

GAUGE CONVERSION

GAUGE CONVERSION

GAUGE CONVERSION

LINE DOUBLING

LINE DOUBLING

LINE DOUBLING

METROPOLITANTRANSPORT PROJECTS

METROPOLITANTRANSPORT PROJECTS

METROPOLITANTRANSPORT PROJECTS

DEOGHAR-DUMKA NEW BG LINE(DOUBL.)(ER) TARAKESWAR - BISHNUPUR NEW BGLINE (NL), ER DEOGHAR - SULTANGANJ (INL),ER FREIGHT OPERATIONS INFORMATIONSYSTEM (FOIS) SHIMOGA-TALAGUPPA RAJPIPLA-ANKELASHWAR (GC) SITAMARHI-RAXAUL-NARKATIAGANJ(GC) BARDHAMAN-KATWA (GC) PATTABIRAM-ARAKKONAM,SR UTRATIA-ZAFRABAD (LINEDOUBLING) AMROHA-KANKATHER,NR BELAPUR-SEAWOOD-URAN ELECTRIF-IED DOUBLE LINE(MTP)-PH-I MUMBAI URBAN TRANSPORT PROJECTPHASE-II MUMBAI URBAN TRANSPORT PROJECTPHASE-I

220100264

220100272

220100273

220100009

N22000056

N22000096

N22000089

N22000091

N22000057

N22000088

N22000058

220100164

N22000092

N22000093

02/1999

04/2000

04/2000

03/1984

12/1992

04/2006

04/1997

04/2007

04/2002

04/2006

04/2000

03/1996

04/2008

04/2003

180.73

157.96

138.00

520.00

46.00

196.97

501.69

245.15

71.94

325.00

57.00

401.81

5300.00

3125.20

Jharkhandd

West Bengal

Multi State

Multi State

Karnataka

Gujarat

Bihar

West Bengal

Tamil Nadu

UttarPradesh

UttarPradesh

Maharashtra

Maharashtra

Maharashtra

Page 19: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

248

249

250

251

252

253

254

255

256

257

258

259

260

261

METROPOLITANTRANSPORT PROJECTS

METROPOLITANTRANSPORT PROJECTS

METROPOLITANTRANSPORT PROJECTS

NCR

NCR

NCR

NCR

NEFR

NEFR

NEFR

NEFR

NEFR

NEFR

NEFR

KURLA-BHANDUP,5 AND 6THP.I.,MUMBAI,CR TOLLYGANJ-GARIA(MTP) EXT. OF MRTS FROM VELACHERY TOSTN. THOMAS GUNA-ETAWAH(NCR), NL AGRA-ETAWAH VIA FATEBAD ANDBAD (NL) NCR ETAWAH-MAINPURI (NL),NCR LALITPUR-SATNA-REWA-SINGRULINL, (NCR) EKLAKHI-BALURGHAT(NL),NEFR NEW B.G. LINE FROM ARARIA TOGALGALIA (THAKURGUNG) NEW B.G. LINE FROM AZARA TOBYRNIHAT (NATINAL PROJECT) CONSTRUCTION OF NEW LINE FROMHARMATI-ITANAGAR/NARHARIAGUN ALUABARI ROAD SILIGURIJANCTION VIA GALGALIA NEW GUWAHATI-DIGARU PATCHDOUBLING PH-I RANGIA-MURKONGSELEK, (GC)NEFR

220100300

220100268

N22000028

220100007

220100243

220100318

220100232

220100135

N22000087

N22000086

N22000083

N22000082

N22000078

220100315

04/1995

03/2000

04/2006

04/1985

04/1999

09/2001

09/1998

01/1986

09/2006

09/2006

09/1996

12/2006

09/2007

01/2004

49.84

907.69

415.59

158.77

108.00

129.70

925.00

36.80

300.00

200.00

156.00

170.00

99.84

912.70

Maharashtra

West Bengal

Tamil Nadu

Multi State

UttarPradesh

UttarPradesh

Multi State

West Bengal

Bihar

Assam

ArunachalPr.

Multi State

Assam

Multi State

Page 20: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

262

263

264

265

266

267

268

269

270

271

272

273

274

275

NEFR

NEFR

NEFR

NEFR

NEFR

NEFR

NER

NER

NER

NER

NER

NER

NER

NER

JIRIBAM TO IMPHAL(TUPUI)(NL)(NEFR) MAYNAGURI TO JOGIGHOPA VIACHANGRA (NL),NEFR KATIHAR - JOGBANI (GC)(NEFR) NEW JALPAIGURI-NEW BONGAIGAON(GC),NEFR BRAHAMAPUTRA BRIDGE AT BOGIBILAND LINK LINES,NEFR LUMDING-SILCHAR(GC),NEFR KANPUR-KASGANJ-MATHURA(GC),NER KAPTANGANJ-THAWE-SIWAN-CHHAPRA GC (NER) GONDA-GORAKHPUR LOOP WITHANAND NAGAR-NAUTANWA GC (NER) MUNDERWA-BABHNAN PATCHDOUBLING(NER) BHATNI-JIRADEI PATCH DOUBLING(NER) HATHUA-BHATNI (N L) (NER) KICHHA-KHATIMA (NL) - NER MAHARAJGANJ-MASRAKH (NL) - NER

220100288

220100266

220100247

220100224

220100201

220100170

220100197

220100256

220100255

N22000030

N22000029

220100319

220100317

220100316

04/2003

02/2000

09/2001

11/1998

04/1996

04/1996

03/1997

09/2001

03/2002

04/2006

04/2006

04/2005

04/2003

04/2003

727.56

733.00

100.00

536.85

1000.00

648.00

395.00

320.10

383.15

102.10

100.27

200.73

165.67

104.10

Multi State

Multi State

Multi State

Multi State

Assam

Assam

UttarPradesh

Multi State

UttarPradesh

UttarPradesh

Multi State

Multi State

Uttaranchal

Bihar

Page 21: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

276

277

278

279

280

281

282

283

284

285

286

287

288

289

NEW LINE

NWR

NWR

NWR

NWR

RAIL VIKAS NIGAMLTD.

RAIL VIKAS NIGAMLTD.

RAIL VIKAS NIGAMLTD.

RAIL VIKAS NIGAMLTD.

RAIL VIKAS NIGAMLTD.

RAIL VIKAS NIGAMLTD.

RAIL VIKAS NIGAMLTD.

RAIL VIKAS NIGAMLTD.

RAIL VIKAS NIGAMLTD.

ABOHAR- FAZILKA DAUSA-GANGAPUR CITY(NL),NWR AJMER-CHITTAURGARH -UDAIPUR-UMRA (GC),NWR SRIGANGANAGAR-SARUPSAR (GC),NWR REWARI-SADULPUR-HISSAR(GC),NWR HOSPET-GUNTAKAL(LD),SCR SALKA ROAD -ANUPNAGAR LINEDOUBLING OBULAVARIPALLE-KRISHNAPATNAM(RVNL) VALLAPARPADM-IDAPALLY,(NL)(RVNL) ALIGARH-GAZIABAD 3RD LINEDOUBLING (RVNL) AJMER-PHULERA-RINGUS-REWARI(G.C.)(NWR)(RVNL) PALWAL-BHUTESWAR 3RD LINEDOUBLING(NCR)(RVNL) RAICHUR-GUNTAKAL(DL)(SCR) KHURDA ROAD - BARANG 3RD LINE(DL) (ECOR)

N22000055

220100184

220100185

220100313

220100290

220100195

N22000075

N22000049

N22000048

N22000034

N22000033

N22000027

220100329

220100327

09/2001

02/1997

09/1996

04/1997

04/1997

03/1996

09/2006

07/2006

07/2006

04/2003

04/2005

04/2005

04/2003

04/2000

86.44

151.84

262.00

143.92

198.96

105.22

324.90

743.00

246.50

230.73

352.00

240.00

136.62

133.41

Punjab

Rajasthan

Rajasthan

Rajasthan

Multi State

Multi State

Chhatisgarh

AndhraPradesh

Kerala

UttarPradesh

Rajasthan

Multi State

AndhraPradesh

Orissa

Page 22: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

290

291

292

293

294

295

296

297

298

299

300

301

302

303

RAIL VIKAS NIGAMLTD.

RAIL VIKAS NIGAMLTD.

RAIL VIKAS NIGAMLTD.

RAIL VIKAS NIGAMLTD.

RAIL VIKAS NIGAMLTD.

RAIL VIKAS NIGAMLTD.

RAIL VIKAS NIGAMLTD.

RAIL VIKAS NIGAMLTD.

RAIL VIKAS NIGAMLTD.

RAIL VIKAS NIGAMLTD.

RAIL VIKAS NIGAMLTD.

RAILWAYELECTRIFICATION

RAILWAYELECTRIFICATION

RAILWAYELECTRIFICATION

CUTTACK - BARANG (LD) BHARUCH-SAMNI-DAHEJ GAUGECONVERSIN BHOPAL BINA 3D LINE DOUBLING PANSPURA-KHARAGPUR 3D LINE BHILDI-SAMDARI (GC) RAJATGARH-BARANG(LD),ECOR HARIDASPUR-PARADEEP(NL) SUKINDA ROAD - ANGUL(NL)(ECOR) BILASPUR-URKURA (DL) TAHANJAVUR-VILLUPURAM GAUGECONVERSION (G.C)(SR) RENIGUNTA-GUNTAKAL(RE) AMBALA-MORADABAD(RE) ELECTRIFICATION OF MORADABAD-ROZA CONV.OF 1500V DC TRACTION TO25 KV AC,WR

220100326

N22000081

N22000077

N22000076

220100291

220100286

220100285

220100325

220100321

220100244

220100260

220100131

N22000095

220100233

04/1995

09/2005

09/2007

09/2007

04/1999

04/1999

04/1996

04/1998

04/1997

10/2001

06/2000

03/1993

03/2006

07/1996

127.13

200.80

687.20

252.50

244.74

166.16

301.64

183.23

151.52

223.00

168.34

152.21

258.35

273.67

Orissa

Gujarat

Madhyapradesh

West Bengal

Gujarat

Orissa

Orissa

Orissa

Chhatisgarh

Tamil Nadu

AndhraPradesh

Multi State

UttarPradesh

Maharashtra

Page 23: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

304

305

306

307

308

309

310

311

312

313

314

315

316

317

RAILWAYELECTRIFICATION

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SECR

ELECTRIFICATION OF KHURJA-MEERUT-SAHARANPUR & G'BAD-MEERUT PEDAPALLI-KARIMNAGAR-NIZAMABADNL(SCR) MUNEERABAD-MAHABOOBNAGAR(NL),SCR MACHERLA-NALGONDA(NL)(SCR) BIDAR-GULBARGA,SCR(NL) GOOTY- RENIGUNTA PATCHDOUBLING PH-II (DL) (SCR) DHARMAVARAM-PAKALA (GC), SCR MANOHARABAD-KOTHPALL NEWLINE(SCR) GUNTUR-GUNTAKAL-KALLURU(GL)(SCR) GADWAL - RAICHUR (NL), SCR KOTLPALLI-NARASAPUR (NL)(SCR) PURNA-AKOLA (G.C), SCR NANDYAL-YERRAGUNTLA(NL),SCR DALLIRAJHARA-JAGDALPUR,NL,SECR

N22000094

220100106

220100205

220100220

220100254

220100267

220100282

N22000032

220100330

220100270

220100265

220100253

220100192

220100149

02/2008

12/1994

04/1996

07/1998

02/1999

05/2002

04/1997

04/2006

04/1992

04/1998

12/2001

02/2000

03/1997

04/1995

171.10

124.43

377.32

125.00

242.42

304.50

200.00

378.56

458.45

92.63

330.00

228.00

155.74

369.00

UttarPradesh

AndhraPradesh

Multi State

AndhraPradesh

Karnataka

AndhraPradesh

AndhraPradesh

AndhraPradesh

AndhraPradesh

Multi State

AndhraPradesh

Maharashtra

AndhraPradesh

Chhatisgarh

Page 24: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

318

319

320

321

322

323

324

325

326

327

328

329

330

331

SECR

SECR

SER

SER

SER

SER

SER

SER

SER

SR

SR

SR

SR

SR

GONDIA-JABALPUR(GC),(SECR) CHHINDWARA - NAGPUR (GC)(SECR) HOWRAH-AMTA-CHAMPADANGA NL(SER) RANCHI-LOHARDAGA(GC),SER GAELKERA-MANOHARPUR,(LD)(SER) PODAPAHAR-BANSPANI,(LD)(SER) EAST COAST RLY.ZN. (SER) BANKURA - DAMODAR (GC) (SER) RUPSA-BANGRIPOSI (GC)(SER) CALICUT-MANGALORE (DL) (SR) MAYLADUTHURAI-THIRUVARUR-KARAIKUDI-THIRU 'PONDI'-AGASTHAMPALLI TIDIVANAM-NAGARI (NL) TINDIVANAM-GINGEE-TIRUVANNAMALAI (NL) DINDIGUL-POLLACHI-PALGHAT-POLLACHI AND COIMBATORE

220100186

220100324

220100208

220100214

N22000045

N22000046

N22000054

220100277

220100323

220100151

N22000079

N22000085

N22000084

N22000080

02/1997

04/2005

04/1974

04/1997

03/1998

04/2006

04/1997

03/1998

02/1996

02/1996

09/2007

09/2006

09/2006

09/2006

356.00

383.79

31.42

193.78

186.92

129.74

41.67

111.90

57.94

240.00

404.19

456.00

125.00

343.17

Multi State

Madhyapradesh

West Bengal

Jharkhandd

Jharkhandd

Orissa

Orissa

West Bengal

Orissa

Multi State

Tamil Nadu

Tamil Nadu

Tamil Nadu

Tamil Nadu

Page 25: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

332

333

334

335

336

337

338

339

340

341

342

343

344

345

SR

SR

SR

SR

SR

SR

SR

SWR

SWR

SWR

SWR

SWR

SWR

WCR

VILLUPURAM-KATPADI (GC)(SR) TANUR (KUTTIPURAM) GURUVAYUR(NL) (SR) QUILON-TIRUNELVELI-TENKASI-VIRUDHUNAGAR(SR)(GC) TIRUCHIRAPPALI-NAGORE-KARAIKKAL(SR)(GC) ANGAMALI-SABARIMALA (N.L.)(SR) KARUR-SALEM(NL),SR KUTTIPURAM-CALICUT INCLD.SHORANUR-M-LORE (DL) (SR) HOTGI-GADAG(GC),SWR BANGLORE - SATYAMANGALAM(NL)(SWR) KOTTUR-HARIHAR(NL),(SWR) HUBLI-AKOLA(NL),SWR KADUR-CHIKMAGALUR-SAKLESHPUR(NL),(SWR) HASSAN-BANGALORE VIA SHRAVANA-BELGOLA(NL),SWR RAMGANJMUNDI-BHOPAL (NL),WCR

220100251

220100283

220100263

220100262

220100252

220100191

220100249

220100125

220100274

220100212

220100193

220100190

220100183

220100314

02/2000

04/1995

03/1998

09/1995

10/1998

02/1997

03/2001

04/1994

02/1999

04/1995

04/1995

04/1996

02/1997

04/2001

175.00

40.00

280.00

100.00

550.00

155.55

178.76

180.00

138.00

65.94

227.00

157.00

295.00

727.13

Tamil Nadu

Kerala

Multi State

Tamil Nadu

Kerala

Tamil Nadu

Kerala

Multi State

Karnataka

Karnataka

Karnataka

Karnataka

Karnataka

Madhyapradesh

Page 26: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

Road Transport & HighwaysS.N Agency Project Name Pro Code DOA Cost Org

346

347

348

349

350

351

352

353

354

355

356

357

358

WORKSHOPS &PRODUCTION UNIT

WORKSHOPS &PRODUCTION UNIT

WORKSHOPS &PRODUCTION UNIT

WR

WR

WR

WR

WR

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

HARNOUT -SET.UP OF W/S TO UND.POH OF UP TO50 COAC. WS&PU CHHAPRA-SETTING UP OF WHEELMANUFACTURING PLANT DLW GM 4000 / 3000 HP DIESELLOCOS VIRAMGAM-BHILDI(WR),GC RAJKOT-VERAVAL AND WANSJALIYA-JETALSAR GC(WR) PRATAPNAGAR-CHOTA UDAIPUR (GC)(WR) SURENDRANAGAR-BHAVNAGAR(GC),WR SURAT-KOSAMBA (LD),WR

ALLAHABAD BYPASS (KM.158-KM.198) GQ, NH-2 HAVERI-HARIHAR (GQ) KM.340-KM.284 (NH-4) CHITRADURGA BY PASS (GQ)KM.207-KM.189 (NH-4) SUNAKHALA-GANJAM (GQ) KM.338-KM.284 (NH-5) FATEHPUR-KHAGA (GQ) KM.38-KM.115 (NH-2)

N22000052

N22000053

220100226

220100062

220100116

220100322

220100187

220100281

240100203

240101132

240101134

240101153

240101178

04/2003

03/2005

04/1999

04/1990

04/1992

04/2005

03/1997

04/2000

04/2000

04/2000

04/2000

04/2000

04/2000

98.74

470.09

155.54

155.66

112.53

148.61

437.40

133.00

440.93

241.00

104.00

225.00

372.40

Bihar

Bihar

UttarPradesh

Multi State

Gujarat

Gujarat

Gujarat

Gujarat

UttarPradesh

Karnataka

Karnataka

Orissa

UttarPradesh

State

Page 27: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

359

360

361

362

363

364

365

366

367

368

369

370

371

372

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

GORHAR-BARWA ADDA (GQ) KM.320-KM.398.75 (NH-2) FORBESGANJ TO SIMRAHI (NH-57)(NHAI) BIJNI TO ASSAM /WB.BORDER (NH-31.C)(2)(NHAI) UP/BIHAR BORDER TO KASIA (NH-28)(NHAI) KASIA TO GORAKHPUR (NH-28)(NHAI) BIJNI TO ASSAM WB BORDER (NH-31.C)(1)(NHAI) NAGAON BYPASS (NH-37)(NHAI) DAKOBA TO NAGAON (NH-36)(NHAI) LANKA TO DABOKA (NH-54)(NHAI) TRICHY BYPASS END TOTOVARAMKURCHI (NH-45B)(NHAI) SILCHAR-UDARBAND (PH.II) HN-54, KM.309 TO KM.275 DARBHANGA-MUZAFFARPUR, NH-57(NHAI) DELHI/ HARYANA BORDER TOROHTAK AMRITSAR-WAGHA BORDER

240101187

240106294

240106293

240106292

240106291

240106290

240106289

240106288

240106286

240106285

240100207

240106295

N24000122

N24000121

04/2000

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

03/2005

12/2003

12/2003

04/2007

06/2008

399.75

332.94

237.80

227.00

242.00

195.00

230.00

225.00

225.00

261.00

157.47

305.00

486.00

205.88

Jharkhandd

Bihar

Assam

UttarPradesh

UttarPradesh

Assam

Assam

Assam

Assam

Tamil Nadu

Assam

Bihar

Haryana

Punjab

Page 28: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

373

374

375

376

377

378

379

380

381

382

383

384

385

386

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

WAINGANGA BRIDGE -CHHATISGARH-MAHARASHTRA KALGHAT-MP/MAHARASHTRA BORDERKM 16.6-84.70 END OF DURG BYPASS-CHHATISGARH/MAHARASHTRA BORDER ZIRAKPUR(HARYANA) -PARWANOO(HIMACHAL PRADESH) BALASORE BHADRAK (REVIVED) KM136.5 - 199.14 NH-5 PATHANKOT BHOGPUR NH-1A LUMDING TO DABOKA ISLAM NAGAR TO KADTAL DHOLPUR - MORENA SECTION(INCLUDING CHAMBOL BRIDGE) NH-3 NH CONNECTIVITY TO ICTTVALLARPADAEU NH - SH BANGLORE - HOSKOTE MUDBOGALSECTION NH-4 ELEVATED HIGHWAY FROM SILKBOARD JUNCTION TO ELECTRONICCITY JUNCTION BANGALORE-NEELAMANGLALA NH-4 NEELAMANGALAR JUNCTION ON NH-4SMITH NH-48 TO DEVIHALLI

N24000120

N24000119

N24000118

N24000117

N24000116

N24000115

N24000110

N24000109

N24000108

N24000107

N24000106

N24000105

N24000104

N24000103

03/2008

11/2008

01/2008

02/2008

04/2000

12/2003

12/2003

12/2003

12/2003

03/2005

03/2005

03/2005

03/2005

03/2005

424.00

549.00

464.00

295.00

228.70

229.00

130.00

546.83

232.45

557.00

565.00

450.00

445.00

441.00

Multi State

Madhyapradesh

Chhatisgarh

Multi State

Orissa

Punjab

Assam

AndhraPradesh

Multi State

Kerala

Karnataka

Karnataka

Karnataka

Karnataka

Page 29: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

387

388

389

390

391

392

393

394

395

396

397

398

399

400

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

SALEM - U / UNDRUPET(BOT -1/TN-06) NH -68 TRICHY - KORUR NH-67 PONDICHERY - TINDIVANAU NH-66 TRICHY - DINDIGUAL NH-45 AGRA-BYPASS(NS-1/UP-1), NH-2,3 JHANSI TO LALITPUR, NH-26 JHANSI TO LALITPUR, NH-25,26 LAKHNADON TO MP/MH BORDER (NS-1/BOT/MP-2), NH-7 LAKHNAADON TO MP/MH BORDER,KM596.75-653.22 (NS-1/BOT/MP-2),NH7 MAHARASHTRA/AP BORDER TO ISLAMNAGAR,(NS-2/BOT/AP-6),NH-7 KOSI BRIDGE INCLUDINGAPPROACHES AND GUIDE BOND ANDAFFLUX-BOND (BR-5) GWALIOR-JHANSI, NH-75 GWALIOR BYPSS, NH-75,3 KURALI-KIRATPUR, NH-21

N24000102

N24000101

N24000100

N24000099

N24000098

N24000097

N24000096

N24000095

N24000094

N24000093

N24000090

N24000089

N24000088

N24000087

03/2005

03/2005

03/2005

03/2005

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

03/2005

941.00

516.00

285.00

576.00

348.16

276.09

355.06

263.17

407.60

360.42

418.04

604.00

300.93

309.00

Tamil Nadu

Tamil Nadu

Tamil Nadu

Tamil Nadu

UttarPradesh

UttarPradesh

UttarPradesh

Madhyapradesh

Madhyapradesh

AndhraPradesh

Bihar

Multi State

Madhyapradesh

Punjab

Page 30: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

401

402

403

404

405

406

407

408

409

410

411

412

413

414

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

SIX LANING OF BANGLORE-HOSURSECTION OF NH-7, PHASE-III GORAKHPUR BYPASS, NH-28,PHASE-II EAST-WEST CORRIDOR PADALUR-TRICHY, NH-45 HYDERABAD-BANGALORE SEC.(NSCORR.PH-II)[KM 211-251] HYDERABAD-BANGALORE SEC.(NSCORR.PH-II)[KM 418-463.16] HYDERABAD-BANGALORE SEC.(NSCORR.PH-II)[KM 376-418] HYDERABAD-BANGALORE SEC.(NSCORR.PH-II)[KM 336-376] HYDERABAD-BANGALORE SEC.(NSCORR.PH-II)[KM 293.4-336] HYDERABAD-BANGALORE SEC.(NSCORR.PH-II)[KM 251-293.4],N BARA TO ORAI, NH-2, 25 CHAMBAL BRIDGE, NH-76 (RJ-5) PANIPAT TO PANCHI GUJRAN, NH-1 BRAHMPUTRA BRIDGE,NH NO-31 HARANGAJO TO MAIBANG, NH-54

N24000086

N24000085

N24000083

N24000081

N24000080

N24000079

N24000078

N24000077

N24000076

N24000069

N24000068

N24000066

N24000063

N24000062

03/2005

12/2003

03/2005

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

110.00

600.24

320.00

194.80

243.64

205.92

243.38

239.19

208.46

465.00

275.00

109.00

217.61

196.00

Karnataka

UttarPradesh

Tamil Nadu

AndhraPradesh

AndhraPradesh

AndhraPradesh

AndhraPradesh

AndhraPradesh

AndhraPradesh

UttarPradesh

Rajasthan

Haryana

Assam

Assam

Page 31: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

415

416

417

418

419

420

421

422

423

424

425

426

427

428

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

HARANGAJO TO MAIBANG,km164.08-190.587 NH-54 AP/KARNATKA BORDER-NANDI HILLCROSSING AND DEVANHALLI TOMEENU KUNLE VILLAGE,NH-7 GANJAM-ICCHAPURUM,NH-5(NHAI) THANJAUR-TRICHY,NH-67(NHAI) NAGPUR-KONDHALI,NH-6(NHAI) TOVARAMKURCHI-MADURAI,NH45B(NHAI) DHARAMTUL TO SONAPUR (AS-19) NALBARI TO BIJNI (AS-9) DHARAMTUL TO SONAPUR,KM 205-183 (AS-20) NALBARI T BIJNI (AS-7) NALBARI TO BIJNI (AS-6) GUWAHATI TO NALBARI (AS-5) ASSAM/WB BORDER TO GAIRKATTA(WB-1) SONAPUR TO GUWAHTI (AS-3)

N24000061

N24000060

N24000057

N24000056

N24000055

N24000054

N24000051

N24000050

N24000049

N24000048

N24000047

N24000046

N24000045

N24000044

12/2003

12/2003

04/2000

03/2005

03/2005

04/2000

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

212.00

402.80

263.27

280.00

168.00

263.00

200.00

142.00

160.00

208.00

225.00

198.16

221.82

245.00

Assam

Karnataka

Orissa

Tamil Nadu

Maharashtra

Tamil Nadu

Assam

Assam

Assam

Assam

Assam

Assam

West Bengal

Assam

Page 32: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

429

430

431

432

433

434

435

436

437

438

439

440

441

442

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NAGAON TO DHARAMTUL (AS-2) NEW MANGALORE PORT NH-17 AND48 JAWAHARLAL NEHRU PORT PHASE-II,SH-54 GUWHATI TO NALBARI (AS-4) THRISSUR TO ANGAMALI (NH-47) SITAPUR-LUCKNOW NALBARI TO BIJNI (AS-8) JHAJHARPUR TO DARBANGA (BR-7) RINGBUNDS TO JHAJHANPUR (BR-6) SIMRAHI TO RING-BUND (MISSIONGLINE) (BR-4) SILIGURI TO ISLAMPUR (WB-7) RAJMARG CHORAHA TOLAKHNANDON,KM 351 TO KM 405.7,NH-26 (NHA RAJMARG CHORAHA TOLAKHNANDON,KM 297 TO KM 351,NH-26 (NHAI) SAGAR - RAJMARG CHORAHA,KM 211TO KM 255, NH-26 (NHAI)

N24000042

N24000040

N24000039

N24000038

N24000037

N24000036

N24000035

N24000031

N24000030

N24000029

N24000028

240106305

240106304

240106303

12/2003

04/2000

04/2000

12/2003

12/2003

03/2005

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

264.72

196.50

143.00

175.96

312.50

322.00

200.00

340.00

340.00

100.50

225.00

229.91

251.03

203.43

Assam

Karnataka

Maharashtra

Assam

Kerala

UttarPradesh

Assam

Bihar

Bihar

Bihar

West Bengal

Madhyapradesh

Madhyapradesh

Madhyapradesh

Page 33: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

443

444

445

446

447

448

449

450

451

452

453

454

455

456

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

SAGAR - RAJMARG CHORAHA,KM255-297, NH-26 (NHAI) SAGAR BY PASS,KM 187 TO KM 211, NH-26 (NHAI) LALITPUR TO SAGAR KM 132 TO KM187, NH-26 (NHAI) LALITPUR TO SAGAR, NH-26(NHAI) KOTA BYPASS,RJ-4, NH-76 (NHAI) DARBHANGA-MUZAFFARPUR(KM 30 TOKM 0), NH-57 (NHAI) KELARPUR-PIMPALKATTI-KM 153 TOKM 175 MAIBANG TO LUNDING (AS-27),KM.40.000 TO KM.60.500 MAIBANG TO LUNDING (AS-24),KM.111.000 TO KM.126.450 MAIBANG TO LUNDING (AS-26),KM.60.500 TO KM.83.400, NH-54 MAIBANG TO LUNDING (AS-25),KM.83.400 TO KM.111.000 HARANGAJO TO MAIBANG (AS-23),KM.126.450 TO KM.140.700 MADURAI-ARUPKOTTAI-TUTICORIN,KM.138.8 TO KM.264.5, NH-45 B AYODHYA - LUCKNOW (LMNHP-I)NH-28, KM.45 TO KM.8.250, NH-

240106302

240106301

240106300

240106299

240106297

240106296

240106283

240106281

240106280

240106279

240106278

240106277

240106276

240106222

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

03/2005

12/2003

206.96

151.30

225.00

198.00

275.00

291.80

117.40

200.00

155.04

167.64

199.81

280.00

629.00

193.00

Madhyapradesh

UttarPradesh

Madhyapradesh

Madhyapradesh

Rajasthan

Bihar

Maharashtra

Assam

Assam

Assam

Assam

Assam

Tamil Nadu

UttarPradesh

Page 34: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

457

458

459

460

461

462

463

464

465

466

467

468

469

470

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

28

GANGA BRIDGE TO RAMDEVICROSSING PH.II NH-25, KM.75-80.06 JHANSI BYPASS (UP-3), KM.104-KM.91, NH-25 GAGODHAR-GARAMORE(PK-IV,NH15)KM 245 TO 281.3 AND 308 TO 254 BORKHEDI-JAM (NS-22/MH) PH.IIKM.36.6 TO KM.64.0, NH-7 JAM-WADNER DEVDHARI-WADNER DEVDHARI-KELAPUR HAPUR-GARHMUKTESWAR (OTHERS)KM.58-93, NH-24 VIJAYAPUR TO PATHANKOT (J ANDK) NH-1A KM.16.35 TO KM.50.00 CHITTORGARH BYPASS(RJ-6) NH-76KM.159 TO KM.213 GOGUNDA TO UDAIPUR (RJ-3)NH.76 KM.104 TO KM.73 PURNEA-FORBESGANJ (BR-2)PHASE-II, KM.268 TO 230, NH-57 PURNEA-FORBESGANJ (BR-1)PHASE-II, KM.309 TO 268, NH-57 BIJNI TO ASSAM/WB BORDERPH.II, KM.30.00 TO 0.00, NH-31

240106221

240106220

240106216

240106210

240106209

240106208

240106207

240106205

240106235

240106232

240106231

240106228

240106227

240106226

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

03/2005

12/2003

03/2005

12/2003

12/2003

12/2003

12/2003

155.00

158.06

412.78

110.00

145.00

145.00

144.00

220.00

193.09

133.03

266.00

310.00

276.00

230.00

UttarPradesh

UttarPradesh

Gujarat

Maharashtra

Maharashtra

Maharashtra

Maharashtra

UttarPradesh

J & K

Rajasthan

Rajasthan

Bihar

Bihar

Assam

Page 35: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

471

472

473

474

475

476

477

478

479

480

481

482

483

484

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

C

AYODHYA - LUCKNOW (LMNHP-II)KM.93.075 TO KM.45, NH-28 MUZZAFFARPUR TO MEHSI (LMNHP-12), KM.520 TO 480, NH-28 MEHSI TO KOTWA (LMNHP-II),PH.II, KM.480 TO KM.440, NH-28 SALEM TO KERALA BORDERSEC(TN6), KM.203.96 NH7 TO KM53 NH47 JALANDAR-AMRITSAR, KM.407/100TO KM.456/100, NH-1 GONDE-VADAPE(THANE), NH-3,KM.440/000 TO KM.539/500 AURANG-RAIPUR, NH-6, KM.232 TOKM.281 DHULE-PIMPALGAON, NH-3, KM.380TOKM. 265 MEERUT-MUZAFFARNAGAR, NH-58PHASE-III, KM.52.25 TOKM.131.00 ORAI TO JHANSI (UP-5),NH-25,KM.220.0 TO KM.170.0 ORAI TO JHANSI (UP-4),NH-25,KM.170.0 TO KM.104.0 AYODHYA-LUCKNOW (LMNHP-3),NH-28, KM.135.000 TO KM.93.075 GORAKHPUR-AYODHYA (LMNHP-4),NH-28, KM.164.00 TOKM.135.00 GORAKHPUR-AYODHYA (LMNHP-5),NH-28, KM.208.00 TO

240106225

240106224

240106223

240106273

240106268

240106262

240106260

240106257

240106256

240106250

240106249

240106248

240106247

240106246

12/2003

12/2003

12/2003

12/2003

03/2005

03/2005

03/2005

03/2005

03/2005

12/2003

12/2003

12/2003

12/2003

12/2003

217.00

275.00

239.00

469.80

263.00

579.00

190.00

556.00

359.00

340.68

451.97

212.00

205.00

227.00

UttarPradesh

Bihar

Bihar

Tamil Nadu

Punjab

Maharashtra

Chhatisgarh

Maharashtra

UttarPradesh

UttarPradesh

UttarPradesh

UttarPradesh

UttarPradesh

UttarPradesh

Page 36: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

485

486

487

488

489

490

491

492

493

494

495

496

497

498

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

KM.164.00

GORAKHPUR-AYODHYA (LMNHP-6),NH-28, KM.251.70 TOKM.208.00 KOTWA TO DEWAPUR(10LMNHP),NH-28 PHASE-II, KM.440TO KM.402 MADURAI -KANNIAKUMARI SEC.(NS-42/TN) NH-7, KM.120 TOKM.160 MADURAI -KANIAKUMARI SECTION(NS-41/TN) NH-7,KM.80 TOKM.120 PATHANKOT- BHOGPUR, KM.26-KM.70, NH-1A VIJAYAPUR TO PATHANKOT (NS-35/J AND K) NH-1A KM.50 TOKM.80 GARHMUKTESHWAR-MURADABAD(NHAI) OTHERS KM.93-149.25,NH-24 IMPROVEMENT OF ACCESS OF GQWITHIN CHENNAI CITY(NHAI)OTHERS CHENNAI BYPASS (NHAI) OTHERS,NH-45, 4 AND 5 HALDIA PORT (PORTCONNECTIVITY) (NH-41) LUCKNOW-BYPASS (EW) (NS ANDEW-PH-I) NH-25 AND NH-28 VIANH-56 PURNEA-GOYAKOTA SEC.(EW) (NSAND EW-PH-I) KM.419-KM.447,NH-31 KANYAKUMARI-PANAGUDI (NS CORR.PH-II) (KM 203-233.60), NH-7 KUNJWANI-VIJAYPUR(NS-15) (NSAND EW-PH-I) KM.80-

240106245

240106243

240106241

240106240

240106237

240106236

240106204

240106203

240106202

240104196

240103192

240103191

240102202

240102193

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

12/2003

04/2000

04/2000

04/2000

01/2004

04/2000

239.00

240.00

507.49

323.36

284.00

166.27

275.00

210.00

480.00

273.00

182.52

205.73

120.00

110.00

UttarPradesh

Bihar

Tamil Nadu

Tamil Nadu

Punjab

J & K

UttarPradesh

Tamil Nadu

Tamil Nadu

West Bengal

UttarPradesh

Bihar

Tamil Nadu

J & K

Page 37: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

Shipping & PortsS.N Agency Project Name Pro Code DOA Cost Org

499

500

501

502

503

504

505

506

507

508

509

510

511

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

NATIONAL HIGHWAYSAUTHORITY OF INDIA

MUMBAI PORT TRUST

MUMBAI PORT TRUST

PORT TRUST

PORT TRUST

PORT TRUST

PORT TRUST

PORT TRUST

KM.97.20,NH-1A

VARANASI-MOHANIA (GQ) KM.317-329 AND KM.0-KM.65 (NH-2) AGRA-SHIKOHABAD (GQ)KM.199.66-KM.250.50 (NH-2) BHUBANESWAR-KHURDA (GQ)KM.387.7-KM.418 (NH-5) HARIHAR-CHITRADURGA (GQ)KM.284-KM.207 (NH-4) COCHIN PORT, NH-47 (PORTCONNECTIVITY) KMS 348 - KMS358 ALLAHABAD BYPASS (KM.198-KM.242.708) GQ, NH-2

CONST. & DEV. OF 2 OFFSHORECONTAINER BERTHS & TERMINAL RAIL CONNECTIVITY TO ICTT ATVALLARPADAM DEEPENING AND WIDENING OF MAINHARBOUR CHANNEL AND JN PORT C CONSTRUCTION OF 13 & 14 CARGOBERTH AT KANDLA CONSTRUCTION OF CAR /CLEANCARGO TERMINAL SETHUSAMUDRAM SHIP CHANNELPROJECT OPERATION, MANAG. & MAINT. OFMULTI USER-JETTY FOR COALHANDELLING

240101181

240101173

240101151

240101133

240100206

240100204

N25000016

N25000015

N25000003

N25000039

N25000034

250100175

N25000038

04/2000

04/2000

04/2000

04/2000

04/2000

04/2000

11/2007

03/2007

10/2005

12/2005

01/2009

06/2005

06/2006

467.93

367.49

140.85

318.00

106.00

534.39

366.00

245.67

800.00

702.00

100.00

2427.40

230.00

Multi State

UttarPradesh

Orissa

Karnataka

Kerala

UttarPradesh

Maharashtra

Kerala

Maharashtra

Gujarat

Gujarat

Tamil Nadu

Karnataka

State

Page 38: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

SteelS.N Agency Project Name Pro Code DOA Cost Org

512

513

514

515

516

517

518

519

520

521

522

523

524

PORT TRUST

PORT TRUST

SCI

SCI

SCIL

SHIPPING

SHIPPING

SHIPPING

SHIPPING

SHIPPING

SHIPPING

BSL

NATIONAL MINERALDEVELOPMENTCORPORATION (NMDC)

C/O IMPOUNDED DOCK AT TUNA FORHANDELLING DRAFT VESSAL DEEPENING OF CHEENEL ATPARADIP PORT ACQUISITION OF TWO NOS.OF470000 DWT MR TANKERS ACQUISITION OF 4 NO. OF ANCHORHANDLING CUM SUPPLY VESSELS ENNORE MANALI EXPRESS WAY,F/OSPECIAL PURPOSE VEHICLE (SPV) ACQUISITION OF 6 NOS. 60470DWT LR-I PRODUCT TANKERS ACQUISITION OF 4 NOS. OF115000 DWT CRUDE OIL CARRIERS ESTABLISHMENT OF VESSELTRAFFIC SERVICES IN GULF OFKUTCH ACQUISITION OF 6 NOS. OF 57000DWT HANDYMAX BULK CARRIERS ACQUISITION OF 4 NOS. OF 80655DWT PANAMAX BULK CARRIERS ACQUISITION OF 2 NOS. OF105000 DWT LR-II TANKERS

ENHANCEMENT OF LOADINGCAPACITY AT BOLANI IRON OREMINE Deve. of Bailadila Iron OreDeposit- II(B)(NMDC)

N25000037

N25000004

N25000013

N25000014

N25000035

N25000029

N25000032

250100112

N25000033

N25000031

N25000030

N12000049

N12000018

04/2005

12/2005

12/2006

10/2007

10/2002

10/2006

08/2008

01/2002

11/2007

08/2008

08/2007

06/2008

01/2003

882.00

154.84

411.32

359.44

150.00

1658.59

1108.12

165.00

1061.96

1066.91

586.58

124.88

295.89

Gujarat

Orissa

Maharashtra

Maharashtra

Tamil Nadu

Maharashtra

Maharashtra

Gujarat

Maharashtra

Maharashtra

Maharashtra

Orissa

Chhatisgarh

State

Page 39: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

525

526

527

528

529

530

531

532

533

534

535

536

537

538

RASTRIYA ISPATNIGAM LIMITED

RASTRIYA ISPATNIGAM LIMITED

RASTRIYA ISPATNIGAM LIMITED

RASTRIYA ISPATNIGAM LIMITED

RASTRIYA ISPATNIGAM LIMITED

RASTRIYA ISPATNIGAM LIMITED

RASTRIYA ISPATNIGAM LIMITED

RASTRIYA ISPATNIGAM LIMITED

RASTRIYA ISPATNIGAM LIMITED

STEEL AUTHORITY OFINDIA LIMITED(SAIL)

STEEL AUTHORITY OFINDIA LIMITED(SAIL)

STEEL AUTHORITY OFINDIA LIMITED(SAIL)

STEEL AUTHORITY OFINDIA LIMITED(SAIL)

STEEL AUTHORITY OFINDIA LIMITED

EXPANSION OF RINL/VSP FROM 3MTPY-6.3 MTPY OF LIQUID STEEL(RINL) COKE OVEN BATTERY NO. 4 PHASE-II Pulverised coal injectionsystem for bf-1&2 Augmentation of Iron OreStorage in RMHP 330 TPH BOILER-6 AND AUXILIARYSYSTEM Air Separation Plant(ASU-5) AIR SEPARATION PLANT (ASU-4) POWER PLANT-I 67.5 MW TG-5 AUX. S'TEMEMERGENCY POWER REQUIREMENTEXP. UNIT INSTALLATION OF MSDS-V ANDTRANSMISSION NETWORK FOR POWERPLANT-3 EXPANSION OF BHILAI STEELPLANT INSTALLATION OF NEW TURBOBLOWER IN TURBO BLOWER STATION EXPANSION OF BOKARO STEELPLANT INSTALLATION OF 700 TPD OXYGENPLANT, ROURKELA

120100067

N12000038

N12000037

N12000053

N12000069

N12000052

N12000060

N12000039

N12000068

N12000022

N12000057

N12000034

N12000055

N12000025

10/2005

08/2007

11/2007

05/2008

07/2007

06/2008

03/2008

09/2007

07/2007

05/2007

09/2008

10/2007

01/2008

07/2007

8692.00

108.00

125.00

480.00

260.00

129.50

96.00

462.00

230.00

143.02

5185.00

105.33

3316.00

302.70

AndhraPradesh

AndhraPradesh

AndhraPradesh

AndhraPradesh

AndhraPradesh

AndhraPradesh

AndhraPradesh

AndhraPradesh

AndhraPradesh

Chhatisgarh

Chhatisgarh

Jharkhandd

Jharkhandd

Orissa

Page 40: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

Telecommunications

539

540

541

542

543

544

545

546

547

548

549

550

551

(SAIL)

STEEL AUTHORITY OFINDIA LIMITED(SAIL)

STEEL AUTHORITY OFINDIA LIMITED(SAIL)

STEEL AUTHORITY OFINDIA LIMITED(SAIL)

STEEL AUTHORITY OFINDIA LIMITED(SAIL)

STEEL AUTHORITY OFINDIA LIMITED(SAIL)

STEEL AUTHORITY OFINDIA LIMITED(SAIL)

STEEL AUTHORITY OFINDIA LIMITED(SAIL)

STEEL AUTHORITY OFINDIA LIMITED(SAIL)

STEEL AUTHORITY OFINDIA LIMITED(SAIL)

STEEL AUTHORITY OFINDIA LIMITED(SAIL)

STEEL AUTHORITY OFINDIA LIMITED(SAIL)

STEEL AUTHORITY OFINDIA LIMITED(SAIL)

STEEL AUTHORITY OFINDIA LIMITED(SAIL)

REBUILDING OF BLAST FURNANCENO.2(BOKARO STEEL PLANT) COKING COAL FACILITIES IN COALHANDLING PLANT EXPENSION OF ROURKELA STEELPLANT REBUILIDING OF COKE OVENBATTERY-10 REBUILDING OF COKE OVENBATTERY NO-6 (BSP) REBUILDING OF COKE OVEN BATTRYNO.-4 STEEL PLANT(SAIL) 700TPD ARI SEPARATION UNIT-4AT OXYGEN PLANT-II, BHILLAI Rebuilding of coke ovenbattery No.1 & 2 (Bokaro SteelPlant) EXPANSION OF IISCO STEEL PLANT COAL DUST INJECTION IN BF-2and 3 INSTALLATION OF NEW COKE OVENGAS HOLDER, ROURKELA EXPANSION OF SALEM STEEL PLANT SIMULTANEOUS BLOWING OF BOFCONVERTER OF SMS-II

N12000035

N12000010

N12000056

N12000016

N12000054

N12000021

N12000023

N12000033

N12000051

120100069

N12000024

N12000050

N12000036

10/2007

09/2006

09/2008

03/2007

07/2008

05/2007

07/2007

10/2007

02/2008

04/2006

07/2007

01/2008

01/2008

892.32

133.91

6133.00

416.50

172.78

248.94

244.30

500.90

********

132.73

123.22

1902.00

197.66

Jharkhandd

Jharkhandd

Orissa

West Bengal

Chhatisgarh

Orissa

Chhatisgarh

Jharkhandd

West Bengal

Jharkhandd

Orissa

Tamil Nadu

Orissa

Page 41: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

S.N Agency Project Name Pro Code DOA Cost Org552

553

554

555

556

557

558

559

560

561

562

563

564

565

BHARAT SANCHARNIGAM LIMITED

BHARAT SANCHARNIGAM LIMITED

BHARAT SANCHARNIGAM LIMITED

BHARAT SANCHARNIGAM LIMITED

BHARAT SANCHARNIGAM LIMITED

BHARAT SANCHARNIGAM LIMITED

BHARAT SANCHARNIGAM LIMITED

BHARAT SANCHARNIGAM LIMITED

BHARAT SANCHARNIGAM LIMITED

BHARAT SANCHARNIGAM LIMITED

BHARAT SANCHARNIGAM LIMITED

BHARAT SANCHARNIGAM LIMITED

BHARAT SANCHARNIGAM LIMITED

BHARAT SANCHARNIGAM LIMITED

GSM EXPANSION PH.IV (B) (BSNL)MAHARASHTRA NIB-II PROJECT RURAL BROADBAND GSM BASED NETWORK EXPANSIONPLAN PH-4 Assam Telecom Circle, Phase-V.I, 2G & 3G GSM EQUIPMENT OF 3125KLINES(2G) AND 625K LINES(3G)PH-5.1 UTTARANCHAL TELECOM CIRCLEPHASE-VI (2G & 3G) GSM EQUIPMENT OF 1625KLINES(2G) & 325K LINES IN M.PPH-V.I GSM EQUIPMENT-480K LINES(2G) & 220K LINES(3G) IN UP(W)-PH-V.I GSM EQUIPMENT OF 700KLINES(2G) AND 150K LINES(3G)PH-5.1 GSM EQUIPMENT OF 1162K LINESPH-4.5 GSM EQUIPMENT OF 1006280 LINESIN TAMILNADU PH-4.5 GSM EQUIPMENT OF 390KLINES(2G) AND 130K LINES(3G)PH-5.1 EXPANSION OF EXISTING 750K GSM NETWORK PE NO. 9920/05-06 PROJ.III OF NIB-II OFMESSAGING STORAGE

260100095

N26000037

N26000034

N26000062

N26000043

N26000058

N26000051

N26000050

N26000046

N26000045

N26000042

N26000041

N26000029

260100099

07/2005

12/2007

02/2007

06/2007

09/2008

01/2009

06/2008

05/2007

11/2007

03/2008

06/2008

02/2008

06/2006

11/2003

1174.75

312.86

239.19

336.81

1799.94

149.15

908.30

335.91

277.34

325.00

409.21

373.94

231.38

250.00

Maharashtra

Multi State

Chhatisgarh

Assam

Maharashtra

Uttaranchal

Madhyapradesh

UttarPradesh

Orissa

Karnataka

Tamil Nadu

Punjab

Maharashtra

Multi State

State

Page 42: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

Urban Development

566

567

568

569

570

571

572

573

574

575

576

577

578

579

BHARAT SANCHARNIGAM LIMITED

BHARAT SANCHARNIGAM LIMITED

BHARAT SANCHARNIGAM LIMITED

BHARAT SANCHARNIGAM LIMITED

BHARAT SANCHARNIGAM LIMITED

BHARAT SANCHARNIGAM LIMITED

DEPARTMENT OFTELECOMMUNICATION

MAHANAGARTELEPHONE NIGAMLIMITED

MAHANAGARTELEPHONE NIGAMLIMITED

MAHANAGARTELEPHONE NIGAMLIMITED

MAHANAGARTELEPHONE NIGAMLIMITED

MAHANAGARTELEPHONE NIGAMLIMITED

MAHANAGARTELEPHONE NIGAMLIMITED

MAHANAGARTELEPHONE NIGAMLIMITED

BIHAR TELECOM CIRCLE PHASE-V.1, 2G &3G IMPLEMENTATION AND EXECUTIONOF NEW TECHNOLOGY KOLKATA TELECOM DISTRICT PH-4 COMMISSIONING OF GSMEQUIPMENT OF 650K LINES (PH-IV++) GSM EQUIPMENT OF 216650LINES(2G) PH-5.1 GSM EQUIPMENT OF 900KLINES(2G) AND 300KLINES(3G)PH-5 NATIONAL RADIO SPECTRUMMANAGEMENTand MONIT. SY. INWPC (DOT) EXP. OF 750K GSM LINES OF 2.5GSM AND VALIDATION EQUPT.WCDMA EXPANSION OF 750K GSM LINES CONVERGENT BILLING ANDCRM(MUMBAI) EXPANSION OF EXISTING 2G&3GGSM N/W BY 750 KPE NO 9920/05-06 500K BROADBAND ACCESS H/WEQUIPMENT DELHI AND MUMBAI CONVERGENT BILLING AND CRM-MTNL(DELHI) DELHI EXP. OF 1250K LINES OF2G/3G GSM LINES

N26000060

N26000015

N26000036

N26000028

N26000040

N26000039

260100051

N26000026

N26000049

N26000016

N26000061

N26000038

N26000011

N26000052

04/2007

10/2004

09/2006

11/2006

01/2008

06/2007

08/2000

02/2007

10/2006

01/2006

10/2008

04/2007

12/2005

02/2007

366.00

160.00

208.50

364.52

192.48

601.49

279.97

741.77

278.16

247.00

180.53

134.25

249.00

463.61

Bihar

Multi State

West Bengal

Maharashtra

Haryana

Rajasthan

Delhi

Delhi

Delhi

Maharashtra

Delhi

Multi State

Delhi

Delhi

Page 43: Atomic Energy · 2010-02-11 · rajasthan atomic power project 5 and 6 (npcil) uranium ore mine & processing plant at tummalapalle d/o kamaraj domestic ter-ph-ii & exp. anna int.

Water Resources

S.N

S.N

Agency

Agency

Project Name

Project Name

Pro Code

Pro Code

DOA

DOA

Cost Org

Cost Org

580

581

582

583

CENTRAL PUBLICWORKS DEPARTMENT

DELHI METRO RAILCORPORATION

METROPOLITANTRANSPORT PROJECTS

MINISTRY OF WATERRESOURCES

C/O GENERAL POOL OFFICECOMPLEX AT INA DELHI MRTS PHASE-II PROJECT BANGALORE METRO RAIL PROJECT

PAGLADIYA DAM PROJECT

N28000016

280100002

N28000008

300100001

10/2004

08/2005

05/2006

01/2001

83.67

8118.00

6395.00

542.90

Delhi

Karnataka

Assam

State

State