ATM Integration Trials in France · ENAC UAV Program . RPAS integration in the Airspace . RPAS...

16
ATM Integration Trials in France MARCH 2015 C.Ronflé-Nadaud (ENAC)

Transcript of ATM Integration Trials in France · ENAC UAV Program . RPAS integration in the Airspace . RPAS...

Page 1: ATM Integration Trials in France · ENAC UAV Program . RPAS integration in the Airspace . RPAS Mission / Flight plan . Remote Pilot Station . RPA airworthiness . Concepts of Operations

ATM Integration Trials in France

MARCH 2015

C.Ronflé-Nadaud (ENAC)

Page 2: ATM Integration Trials in France · ENAC UAV Program . RPAS integration in the Airspace . RPAS Mission / Flight plan . Remote Pilot Station . RPA airworthiness . Concepts of Operations

From R&D to operational procedures

R&D

Each demand studied

RPAS enabled through segregation

Growing activity RPAS integration

2005 2020 2015 2010

R&D

2012

2012 French Decrees for small RPAS and VLL flights

Concepts of Operations Operational procedures

Permit to Fly

2

Page 3: ATM Integration Trials in France · ENAC UAV Program . RPAS integration in the Airspace . RPAS Mission / Flight plan . Remote Pilot Station . RPA airworthiness . Concepts of Operations

ENAC UAV Program

UNMANNED AIRCRAFT SYSTEMS (HTTP://PAPARAZZI.ENAC.FR)

CIVIL APPLICATIONS FOR SMALL UAS

3

Page 4: ATM Integration Trials in France · ENAC UAV Program . RPAS integration in the Airspace . RPAS Mission / Flight plan . Remote Pilot Station . RPA airworthiness . Concepts of Operations

ENAC UAV Program

RPAS integration in the Airspace

RPAS Mission / Flight plan

Remote Pilot Station

RPA airworthiness

Concepts of Operations

Air Traffic Management

Communications

4

Page 5: ATM Integration Trials in France · ENAC UAV Program . RPAS integration in the Airspace . RPAS Mission / Flight plan . Remote Pilot Station . RPA airworthiness . Concepts of Operations

RPAS in Air Traffic Management

ATM LAYERS DESCRIPTION ACTORS

Strategic Flight planning Flow Control

RPAS Pilot submitting Flight Plan ATC processing of flight plans

Separation

Aircraft-to-aircraft separation between RPAS and other traffic

ATC providing separation service RPAS maintaining self separation when ATC separation service is not provided (D&A)

Collision avoidance « Last resort » collision avoidance alert and maneuver

RPAS D&A system collision avoidance resolutions and maneuvers TCAS Compatibility

Modelization

C² Link

4D Nav HMI

Human factors

D&A

5

Page 6: ATM Integration Trials in France · ENAC UAV Program . RPAS integration in the Airspace . RPAS Mission / Flight plan . Remote Pilot Station . RPA airworthiness . Concepts of Operations

RPAS Demonstrators

In October 2013, SESAR JU launched 9 RPAS Demonstrators

6

Page 7: ATM Integration Trials in France · ENAC UAV Program . RPAS integration in the Airspace . RPAS Mission / Flight plan . Remote Pilot Station . RPA airworthiness . Concepts of Operations

DGAC/DSNA ENAC Rockwell Collins France (coordinator) SAGEM

DGAC/DSNA (coordinator) ENAC Airbus Defense&Space AirbusProsky SOPRA STERIA

French Consortiums

7

Page 8: ATM Integration Trials in France · ENAC UAV Program . RPAS integration in the Airspace . RPAS Mission / Flight plan . Remote Pilot Station . RPA airworthiness . Concepts of Operations

Objective of the demonstrators Define Concepts of Operations and Operational Procedures (normal, abnormal,

emergency) using today state of the art

• Real time simulations: Validation with simulations using real traffic (registered)

with licensed Air Traffic Controllers qualified on the TMA with professional Remote Pilots

• Fast time simulations: “safety” impact of Detect and Avoid and compatibility with TCAS • Real flights with Optionaly Piloted Vehicles

8

Page 9: ATM Integration Trials in France · ENAC UAV Program . RPAS integration in the Airspace . RPAS Mission / Flight plan . Remote Pilot Station . RPA airworthiness . Concepts of Operations

Design of tailored procedures

9

Page 10: ATM Integration Trials in France · ENAC UAV Program . RPAS integration in the Airspace . RPAS Mission / Flight plan . Remote Pilot Station . RPA airworthiness . Concepts of Operations

Design of a tailored procedure for Toulouse Blagnac

Page 11: ATM Integration Trials in France · ENAC UAV Program . RPAS integration in the Airspace . RPAS Mission / Flight plan . Remote Pilot Station . RPA airworthiness . Concepts of Operations

900 000 Fast time Simulation runs

11

Coordination between an horizontal Detect and Avoid

maneuver and a TCAS logic is positive

Without Detect and Avoid With Detect and Avoid With cooperative Detect and Avoid

TRACKS<FL195

With TCAS Without TCAS

VERSUS Manned aircraft

RPAS

Page 12: ATM Integration Trials in France · ENAC UAV Program . RPAS integration in the Airspace . RPAS Mission / Flight plan . Remote Pilot Station . RPA airworthiness . Concepts of Operations

25 real flights on mid-size airport

25 flights inside airport area

Experimentations with tailored procedures for normal, abnormal and emergency situations

Detect and avoid demonstration in segregated area in ODREA

12

Page 13: ATM Integration Trials in France · ENAC UAV Program . RPAS integration in the Airspace . RPAS Mission / Flight plan . Remote Pilot Station . RPA airworthiness . Concepts of Operations
Page 14: ATM Integration Trials in France · ENAC UAV Program . RPAS integration in the Airspace . RPAS Mission / Flight plan . Remote Pilot Station . RPA airworthiness . Concepts of Operations

Preliminary findings

14

• Impact of tailored RPAS procedures is very positive

- No impact on safety - RPAS behavior very similar to light aircraft

• Emergency procedures are acceptable, but could be improved

- RPAS are more predictible • During approach phase, latency is penalizing • Needs for remote pilot specific training and

qualification • Human Factors : How to keep humans involved while

monitoring Unmanned systems?

Page 15: ATM Integration Trials in France · ENAC UAV Program . RPAS integration in the Airspace . RPAS Mission / Flight plan . Remote Pilot Station . RPA airworthiness . Concepts of Operations

Conclusion

RPAS integration in mid-size airport traffic successfully demonstrated

• Demystification of RPAS towards CAA and ATCos • Fruitfull collaboration between industry and Civil Aviation

Needs for R&D on • RPAS Flight planning • Detect&Avoid & compatibility with TCAS • Communication Link • Human Machine Interface & Human Factors

15

Page 16: ATM Integration Trials in France · ENAC UAV Program . RPAS integration in the Airspace . RPAS Mission / Flight plan . Remote Pilot Station . RPA airworthiness . Concepts of Operations

QUESTIONS ? www.odrea.org

www.tempaeris.org