ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - Ramallah Bill of Quantities page 1 / 28 ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT NO. US$ US$ ( BILL NO. ' 1 ' ) HOLLOW CONCRETE BLOCKS WORKS PREAMBLE All works of this bill shall be of Concrete blocks Grade 35 of high quality standards and as per specifications. Block works shall be measured in meter square. The net measurement of the complete elevations shall exclude all openings and voids more than 0.1 M. S. in area. No allowance for thickness used other than those shown in the drawings. Rates of Block works include:- - Vertical and horizontal joints. - Cement and mortar, - Galvanized angles butter fly ties (at joints and between walls in cavity walls. - Concrete filling at all ends including reinforcing steel to cavities at quoins and door and window openings, reveals, sills for windows and the like. - R.C. Door Walls and jambs for doors and others as per detailed drawings - Lintels and bond beams to the full length of the wall, min 20 cm. High and in the same wall thickness of reinforced concrete grade B-200 with due reinforcement steel, on top of doors and windows or as specified per drawings. - Window jambs of min. 20 cm width and in same wall thickness to full height of window. - And all needed to complete job as per drawings and specifications. Supply and Build Concrete Block Walls, 'Grade 35’ as per Engineer approval a. Hollow Blocks (10 Ten) cm thick. M.S 360 TOTAL CARRIED TO SUMMARY 1.01

Transcript of ATLAS 14202 - Finishing Works of Ministry of Interior

Page 1: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 1 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$( BILL NO. ' 1 ' )

HOLLOW CONCRETE BLOCKS WORKSPREAMBLE

All works of this bill shall be of Concrete blocks Grade 35 ofhigh quality standards and as per specifications.

Block works shall be measured in meter square. The netmeasurement of the complete elevations shall exclude allopenings and voids more than 0.1 M. S. in area.

No allowance for thickness used other than those shown inthe drawings.

Rates of Block works include:-

- Vertical and horizontal joints. - Cement and mortar,

- Galvanized angles butter fly ties (at joints and between wallsin cavity walls.

-Concrete filling at all ends including reinforcing steel tocavities at quoins and door and window openings, reveals,sills for windows and the like.

- R.C. Door Walls and jambs for doors and others as perdetailed drawings

-

Lintels and bond beams to the full length of the wall, min 20cm. High and in the same wall thickness of reinforcedconcrete grade B-200 with due reinforcement steel, on topof doors and windows or as specified per drawings.

- Window jambs of min. 20 cm width and in same wallthickness to full height of window.

- And all needed to complete job as per drawings andspecifications.Supply and Build Concrete Block Walls, 'Grade 35’ as perEngineer approval

a. Hollow Blocks (10 Ten) cm thick. M.S 360

TOTAL CARRIED TO SUMMARY

1.01

Page 2: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 2 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$

( BILL NO. ' 2 ' ) PLASTERING WORKS

PREAMBLE.

- Plastering to all areas shall be measured net, includingopenings, which are less than 0.25 Meter Sq.

- The price shall include for running rules , all narrow

widths, including joints on block walls or backing concreteface for key, for making good to frames around pipes andother fittings , plastering to jambs and reveals of openings,side of columns, window sills; all of which shall bemeasured as plastering . Rate includes metal anchorsbetween concrete and block walls and where necessary

-

Price shall also include Expanded metal lath, angle beadsat all appeared corners for the entire height, and plasterstops at opening edges, expansion joints, sills, labor, curing,erecting and dismantling of scaffoldings, additives, pigmentsand all incidentals required as specified and / or detailed onthe Drawings.

2.01

Two Coats of Cement and Sand Plaster over one slurrycoat to walls and ceilings and where required includingmetal Lath, angle beads, plaster stops and all required asper Specifications and Drawings.

- Internal plaster for walls, columns or wherever indicated on drawings. M.S. 1200

2.02One layer of cement plastering (Glanse) to ceiling and wall above suspended ceiling level and where ever instructed by the Engineer. (Provisional) .

M.S. 1100

TOTAL CARRIED TO SUMMARY

Page 3: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 3 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$

( BILL NO. ' 3 ' ) TILING WORKS

PREAMBLE.

-All tilling works (terrazzo, ceramics and marble) shall bemeasured net in square meters. Deducting all opening andvoids more than 0.25 M.S.

-

Marble works for steps and treads of stairs shall bemeasured in linear meter. The tread, the riser, flight skirtingand water stop shall all be measured as a single unit inlinear meter.

- Marble works for window sills and other openings shall bemeasured in linear meter.

- Parapet coping shall be measured in linear meter.

-

Rate shall include preparation of surfaces under tiles mortar(1:3), sand-cement fill, Finish to falls and cross falls, specialtile pieces for edges and the like, tile surface finishing,plastic spacers. Pointing and cleaning and all incidentals asper specifications.

-

Rates shall include also providing and mounting in place“Premises Title Marble Plate” of white Carrara marblepolished, finished and engraved in the design provided byMoIA (dimensions 70cm high x100cm wide).

- Bedding should be white cement.

3.01

Supply and Install Non-Slip ceramic glazed floor tiles forbathroom floors, first choice and free from all defects(Spanish made or equivalent - GRADE A) . Price to includesand with cement filling (Grade B-100)pointing with whitecement and cleaning on site . Engineer shall approve sizeand color , which should be 20 *20*0.6 cm .

M.S. 50

3.02

Supply and Install White ceramic glazed wall tiles, firstchoice and free from all defects. (Spanish made orequivalent - GRADE A) Price to include round edges tiles perimeters, plastic anglesfor edges, cutting, patching around the services bedding incement mortar, grouting, pointing with white cement and twocoats of plaster. All works shall be in accordance withdrawings and specification. Engineer shall approve size andcolor of tiles, which should be 20 * 20 * 0.6 cm

M.S. 240

TOTAL CARRIED TO NEXT PAGE

Page 4: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 4 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$

( BILL NO. '4 ' ) CARPENTRY WORKS

PREAMBLE.

- Sizes of carpentry works given in the Bills of Quantities arefinished sizes and shall be as per Drawings.

-Sizes of doors and other items mentioned in the Bills ofQuantities shall allow for tolerance to suit the structuralopenings shown in the Drawings.

-Wooden doors and pair of doors shall be measured innumber for each structural opening, unless stated otherwisein the Bills of Quantities.

- Wall protection wooden rubbing rails shall be measured inlinear meter.

-Cloth hangers and hanger wooden base shall be measuredin number or in linear meter as stated in the Bills ofQuantities.

- Rates for carpentry and joinery work shall include :a) Shop and coordinated drawings.

b) Frames, architrave and 20 cm. high “U” shape kick plates.

c) Allowance for plastering and tiling and the like.d) Cutting and fitting around obstructions, Bedding andpainting.e) Grouts, blocking and backings.f) Plugging concrete, block work, and stone work, andmaking well.g) Ironmongery including "original Yale" or equivalentcylinders, cylindrical locks with master key for all the doors,handles type stainless steel model TH104 from "Dmicile" orequivalent with cylinder cover model IY, stainless steelstoppers type "Domicile" ARCHIDH 003 or equivalent ,screws, temporary fixing, re-fixing, oiling and adjusting. Allto be silver color.h) Providing three keys for each lock including tagging.

i) Providing and fixing Room Title Plat, aluminum (30*20)cm. mounted on wooden plate (35*25) with varnish finish.

j) Steel legs, brackets, bearers and other supports includingpainting.k) Glass and glazing including cutting to size and putty.l) Fly screening including cutting to size.m) Preparing surfaces to receive finishes.n) Painting, varnishing, polishing, oiling, and the like, to anyarea or width in any location including work in multicolor andcutting in edges and putty.

Page 5: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 5 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$

( BILL NO. ' 4 ' ) CARPENTRY WORKS

4.01

Supply and Fix Wooden Doors 4.5 cm Thick single ordouble sashes. With (Swedish wood frame) (4.5*3.5) cm (Swedish) wood edging and (3.5*9.5) cm soft wood stile.Edge strip banding of width 4.5 mm. Formica veneer 0.6mm on both sides, color as directed by engineer. Doorpaneling to be soft wood 4.5*3.5 cm. each 4 cm., frames ofhardwood (Swedish) 3cm thickness, width according to thewall thickness’ and Allowance of 4 - 6 cm. thickness forplastering and tiling purposes, immersed in woodpreservative before erection then embedded completely insand - cement mortar and completely anchored as perspecification.

Architrave of Hardwood(Swedish) (7*1.2) cm, price toinclude ironmongery, kick plates of aluminum 10cm heightfor bath room doors, U shaped both sides, and at thebottom door stoppers, , gaskets cylindrical Lock ((Approvedby Palestine Standards Institution), and painting in threecoats of oil paint in addition to primer coat.

All as per Detailed Drawings), specification and instructionsof supervisor engineer. a.WD1 Structural opening size (100 * 210) cm. NO. 21b.WD2 Structural opening size (90 * 210) cm. NO. 10c.WD3 Structural opening size (80 * 210) cm. NO. 5

Supply and install fixed wooden (Swedish type) windows,the price includes glass 6mm with fixed frame (the sametype),painting, fixing, polish and all other accessories andfittings to fit within the opening between the two halls thisshould be executed according to the drawings andspecifications and instruction of the supervisor engineer.

4.02 Windows in partitions M.S. 30

Page 6: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 6 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$

( BILL NO. ' 4 ' ) CARPENTRY WORKS

4.03

Supply & Install top and bottom Wooden Kitchen Cabinet.Cabinet's Top shall be with granite 30 mm. thick withpolished surface and seen edges. Cabinet Sides,Elevations, Partitions, Shelves and Drawers front-side shallbe of 17-mm. thick panel wood, laminated internally with 0.5mm. Thick Formica sheet, and with 0.8mm thick Formicasheet externally. The whole cabinet shall be framed withHardwood (Zan) bands size (60*40) mm screwed to steelframe and covered with 0.8mm thick Formica sheet. Rearsides of cabinets and drawer's bottom shall be of 6 mm,thick Veneer covered internally with 0.5mm thick Formicasheet. Price to include cabinet terrazzo flooring (30 * 30 * 3)cm., and terrazzo skirting (30 * 10 * 1.5) cm., ironmongery,handles, two coats of lacquer paint over one primer coatand all the accessories as per drawings and Specifications .

SIZE: Height (90) cm. Width (60) cm. Detailed Drawings)

- For kitchen M.R 8

4.04Fabricate, supply and install Information desk counter, as in drawings with all fixing accessories, drawers, shelves, hardware, and ironmongery with a master key and made of:

18mm thick plywood for wall hung and lower cabinets, plastic laminated " top quality from outside and laminated with regular Formica from inside, 12mm thick sandwich panel for shelves laminated with regular Formica. For dimensions refer to detailed drawings.

4.04.1 Information Desk M.R 6.54.04.2 Security Desk M.R 6.5

4.05

Fabricate, supply and install wooden counter as in drawings ( Detail # 2), the price should include all fixing accessories, hard wood partition with frames "Zan", Sekurit fixed glass 10mm.

- Drawers, shelves, hardware, and ironmongery with a master key and made of:18mm thick plywood for lower cabinets, plastic laminated " top quality from outside and laminated with regular formica from inside, 12mm thick sandwich panel for shelves laminated with regular formica.

- Preparing surface,sanding,applying prime coat, one coat of protection paint (سلر), and two coats of lucker paint.For dimensions refer to detailed drawings.

LS 1

TOTAL CARRIED TO SUMMARY

Page 7: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 7 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$

( BILL NO. ' 5' ) PAINTING WORKS

Preamble.

- Painting and decorating to walls, ceilings and the like shallbe measured net in meter square.

- Painting to other works shall be included in the relateditems. Color as specified by engineer.

-Paints shall be supplied to site in sealed container, asapproved by the Engineer, and site mixing shall not bepermitted.

-

The Contractor rates shall include for supply of all materials,workmanship, samples, primers, surface preparation,protection of painted surfaces, application to all heights asrequired of works, repair of all damaged surface at thecontractor’s expenses, and all other requirements as statedin the Specifications.

- All paint types should be approved and having a supervisioncertificate from the PSI.

M.S. 1200

M.S. 100

TOTAL CARRIED TO SUMMARY

5.01

Supply and paint high quality supercryl paint for walls as perindicated in finishing tables, on one priming coat and twofinishing coats, using two coats of complete putty, as persatisfaction of the supervisor engineer.

5.02 Supply and paint three coats Polycide paint for ceilings ofhigh quality (Approved by Palestine Standards Institution).

Page 8: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 8 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$

( BILL NO. ' 6 ' ) FALSE CEILING AND GYPSUM BOARD WORKS

Preamble.

- Gypsum Board Partitions, ceilings, and acoustic tilesceilings and the like shall be measured net in meter square.

-

The Contractor rates shall include for supply of all materials,workmanship, samples, primers, surface preparation,protection of surfaces, application to all heights as requiredof works, repair of all damaged surface at the contractor’sexpenses, and all other requirements as stated in theSpecifications.

6.01

Supply and install 60*60cm squared perforated metalsheets trays with perforation diameter 1.5mm (22%perforation) covered with approved acousticmaterial,(soundtex) or equally approved

M.S. 1030

6.02

Supply and install non perforated acoustical ceiling made offormed galvanized sheet metal trays for bathrooms and wetareas. The metal tray should be of 0.8 mm thick 45 mmhigh painted with polyester epoxy paint.

M.S. 90

6.03

Supply and install gypsum board walls 10 cm thick for thepartition of offices. All fittings shall be included according tospecifications. Price includes application of two coats ofcomplete tals putty for the entire area of the gypsum board,painting, sound insulation, metal studs standing frame, steelchannels, bolts, screws, 7 cm PVC skirting, wooden toppingpanels 3cm thick, accessories and all necessary relatedmaterials and works.

M.S. 550

6.04 Ditto, same as item 6.03 but gypsum board walls 15 cm thick M.S. 50

6.05 Ditto, same as item 6.03 but gypsum board steps M.S. 60

6.06

Supply and install gypsum board partition as shown indetails # D3 , the price should include hollow steel bar 3" - 2mm thick section, from the concrete slab up to the ceiling,two coats of complete tals putty for the entire area of thegypsum board, painting, sound insulation, metal studsstanding frame, steel channels, bolts, screws, 7 cm PVCskirting, wooden topping panels 3cm thick, accessories andall necessary related materials and works.

LS 1

TOTAL CARRIED TO SUMMARY

Page 9: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 9 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$

( BILL NO. ' 7 ' ) INSULATION , ROOFING AND EXPANSION JOINTS

Preamble.

- All finishes shall be measured superficially net unless otherwise stated clearly.

-

All finishes, include triangular shaped fillets except cementand sand lining to gutters, shall be measured on the slabsurface only, parapets and column stubs to be included inthe price and not to be measured.

- Cement and sand lining to gutters shall be measured inlinear meter, unless other wise stated clearly.

- Rates for cement and sand work shall include for :

- Hacking concrete, applying cement slurry or raking outjoints of block work to form key. Application to any surface.

- Finish to surface, to falls, cross-falls and currents.

- Forming bays including joints. Finish to edges and arises.

- Making good around steel sections, pipes, tubes, bars,brackets, outlets, and the like.

-

Measurement for concrete screed and waterproofingmembrane shall be for horizontal projection of roof area ascalculated on roof plan between plastered surfaces ofparapets and walls only. Corner chamfers and verticalwaterproofing shall not be measured. Expansion jointwaterproofing shall not be measured, and is included inexpansion joint unit prices.

- Rates for waterproofing and roof sheeting shall include for

Preparation of surface, cutting in edges. Overlaps primingand treatment at the corners and floor drains.

-Dressing over parapets and stub columns including forminggroove to receive edge of plasticized bitumen membraneand sealing with elastic sealer.

- Side and end laps, Fittings including bolts, hook bolts,screws and washers,

- Sheets of any width or length.

M.S 60

TOTAL CARRIED TO SUMMARY.

7.01

Supply and apply two coats of cement polymer to beapproved by the supervising engineer, for the floors ofsanitary units, the price includes concrete screed applied intwo layers stiffened with fiber glass sheet to the full area offloor and up to 15 cm high of walls

Page 10: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 10 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$( BILL NO. ' 8 ' )

ELECTRICAL WORKS8.1 Electrical Points.

a.

The electrical power supply from electrical switchboard to first point in circuit shall be included in the unit price of that point (by means of wires, cables or leads in self extinguishing conduits or cable tray). All as per specifications and as required.

b. All wiring accessories shall be as made by Legrand, Giwess or equivalent.

8.1.1

Supply, install, connect, test and label standard lighting point internal or external, in slab or over false ceiling, to include a 16 mm diameter conduit, 1.5 or 2.5 sq. mm cross-section leads or cable, and, as required single, double, two way or push bottom lighting switch , and outlet for luminaries with junction box and terminals.

No. 170

8.1.2 Ditto but for emergency lighting point No. 30

8.1.3

Supply, install and connect a 16A wall socket point - to include a 16 mm dia. Conduit, (3x2.5) sq. mm cross-section leads or cables, and as required 16 A wall socket .

No. 90

8.1.4 Ditto as item 8.1.3 but double socket. No. 15

8.1.5 Ditto as item 8.1.3 but with water proof cover. No. 6

8.1.6 Ditto as item 8.1.4 but with water proof cover. No. 1

8.1.7 Ditto as item 8.1.3 but double UPS socket outlet. No. 85

8.1.8 Ditto as item 8.1.3 but with indicator lamp No. 19

8.1.9

Supply, install, connect, test and label Fire Alarmconnection point (Price includes 16 mm diameterconduit with cable, leading from point to the LV box orto the fire alarm panel).

No. 38

Page 11: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 11 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$( BILL NO. ' 8 ' )

ELECTRICAL WORKS

8.1.10

Supply, install, connect, test and label SAT connectionpoint (Price includes 23 mm diameter conduit withsuitable data cable leading from point to the LV box,boxes, and the socket outlet.

No. 5

8.1.10

Supply, install, connect, test and label CAT 6 Computer data point (Price includes 23 mm diameter conduit with CAT 6 cable from point to the data cabinet, boxes, and the socket outlet).- The standard connection code that will be utilized should be coordinated with supervising engineer and beneficiary representative.

No. 180

8.1.11

Supply, install, connect, test and label Single phase 25A Isolator Switch .The price include the conduits, 3*2.5 sq.mm cross section, cable tray and any accessories needed, all according to drawings and specifications for splits unit in server room.

No. 2

8.1.12 Ditto as item 8.1.11 , but Three phase 80A for VRV III outdoor machine No. 1

8.1.13 Ditto as item 8.1.11 , but Three phase 100A for VRV III outdoor machine No. 1

Total sec. 8.1) Electrical points……carried to summary

Page 12: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 12 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$( BILL NO. ' 8 ' )

ELECTRICAL WORKS

8.2 Conduit, Rigid Piping and Excavation Works

Supply, install and connect Self-extinguishing type plastic conduit, processed over or under plaster or inside castings, including junction boxes, unions, connectors, etc. including excavation, backfilling , sand , tape , and galvanized draw-strings, ready for use (for works not included in points works).

8.2.1 29 mm diameter. ML 150

8.2.3 36 mm diameter. ML 150

8.2.4 50 mm diameter. ML 150

Total sec. 8.2) Conduit, Rigid Piping and Exc…carried to summary

8.3 Cables

Supply, install and connect XLPE non-armored type thermoplastic copper cables, including insertion into conduit or attachment to structural elements or laying in ductwork, including all associated materials, insulation materials, unions,Z construction, ladders, cable shoes and connection of cable at both ends.

8.3.1 3x50+25 sq.mm cross section+25 Cu.. M.L. 50

8.3.2 3x35+16 sq.mm cross section+16 Cu.. M.L. 70

8.3.3 5x16 sq.mm cross section. M.L. 100

8.3.4 5x6 sq.mm cross section. M.L. 50

Total Sec. 8.3) Cables ….carried to summary

8.4 Structural Elements, Cabinets and Ductwork

Supply, install and connect prefabricated perforated galvanized ductwork mounted on walls or attached to ceilings. Price to include all reinforcing and attaching hardware, structural elements, brackets, hangers etc...of dimension 20/7 cm.

M.L. 60

8.4.1 Ditto with galvanized sheet metal cover M.L. 60

Total 8.4) Structural Elements, Cabinets….. carried to summary

Page 13: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 13 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$( BILL NO. ' 8 ' )

ELECTRICAL WORKS

8.5 Electrical Switchboards

a.Supply, install and connect the electrical switchboards to the site, including all associated materials and labor, as described in the technical specifications.

b.Cabinets with no access from the rear, made up of transparent polycarbonate cells, or sheet-metal cabinets with a 25% surplus space.

c. The switchboards are to be placed on the floor, in a niche against the wall.

d.Main supply lines enter from the switchboard bottom, top or side, while outgoing lines exit the switchboard from both its bottom and top sides.

e.

Price to include all structural elements required in order to install the switchboard, including bus-bars, terminals, wiring, bolts, clamps, etc. and for the equipment listed below.

f.The switchboards shall contain accessories made by one of the following manufacturers: SIMENS, MERLIN GERIN, KLOCKNER-MOELLER or Equal Approved.

g.

Prices for supply, installation and connection of various accessories including all associated labor and materials such as bus-bars, terminals, wiring reinforcements, mounts, engraved "sandwich" type identification plates, etc. including connection to mains supply - complete ready for use.

8.5.1 DB-Ground - Provisional Item Unit 1

8.5.2 DB-Fist- Provisional Item Unit 1

8.5.3 DBU-Main Unit 1

8.5.4 DBU-Sub Unit 1

Total sec. 8.5) Electrical Switchboard…..carried to summary

Page 14: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 14 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$( BILL NO. ' 8 ' )

ELECTRICAL WORKS

8.6 Lighting Fixture - Supply, install and connect the following lighting

fixtures including P.F. correction capacitors, electronic ballasts, lamps and all accessories as per drawings and specifications, similar to Philips, Trilux, Thorn, Iguzini, Disano or equally approved

8.6.4Type (A) 4X18W fluorescent lighting fixture recessed in false ceiling with steel sheet body and double parabolic reflector, IP20.

Unit 145

8.6.5Type (AE) ditto as (A), but with an emergency lighting maintained for 1x18w for a duration of 3hr. Complete with control, batteries and charger.

Unit 27

8.6.3 Type(B):2x18w compact fluorescent lighting fixture recessed in false ceiling with opal cover, IP44. Unit 14

8.6.4Type (C) 2X18w compact fluorescent down light recessed in false ceiling with galvanized steel body and forest glass diffuser, IP20.

Unit 12

8.6.5

Type (D)Wall mounted exit light, maintained 1x8w fluorescent tube for a duration of 3hr. complete with control batteries and charger with steel body and polycarbonate cover, IP20.

Unit 3

8.6.6Type (E) 2x36W, fluorescent lighting fixture, recessed in false ceiling, body of grey fiber-glass reinforced polyester, prismatic polycarbonate diffuser, IP54.

Unit 2

Total sec. 8.6) Luminaries Supply…...carried to summary

Page 15: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 15 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$( BILL NO. ' 8 ' )

ELECTRICAL WORKS

8.7 Fire Alarm System

Supply, install and connect complete in place and in anoperable manner the fire alarm system. The work is toinclude the supply of the equipment specified,installation of same connection, wiring, cables,commissioning and all of the details and connecting tothe existing system as specified in the technicalspecifications and drawing, the type of fire alarmsystem fixtures should match the existing systeminstalled at the MoIA premises.

8.7.1Connection works with the main fire alarm controlpanel at the building, the price should include allnecessary works needed to complete the job.

Unit 1

8.7.2 Intelligent manual call point. Unit 5

8.7.3 Indoor fire alarm siren Unit 5

8.7.4 Intelligent photo electric smoke detector, complete with base Unit 23

8.7.5 Intelligent heat detector, complete with base Unit 2

8.7.6 Outdoor fire alarm siren Unit 1

Total Sec. 8.7) Fire Alarm System…..carried to summary

8.8 LV Boxes

Supply, install and connect the following LV boxes. Rate to include all required materials, conduits, wires, cables and accessories manufacturing from galvanized sheet metal sheets , painted with the same color of the switch boards all as specified in the technical specification and drawings.

8.8.1 LVB Approximate dim.( 60x60x25) cm No. 2

Total of Sec-8.8) LV Boxes …...carried to summary

8.9 Network Installations

8.9.1 Supply, install, connect, test and commission Cat 6Patch Panel 48 ports 3M or equally approved. No. 4

8.9.2 Rack cabinet 12U with 2 fans and power strip 6outletwith surge protection and slides shelf No. 2

Total of Sec-8.9) Network installations …...carried to summary

Page 16: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 16 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$( BILL NO. ' 9 ' )

MECHANICAL WORKS9.1 Waste and Drainage System:

The Contractor shall, when pricing the rates of this bill, take into consideration including and allow for the costs or expenses of all requirements stipulated in the preambles, drawings and technical specification of the contract.

The Contractor has to provide complete Work-Shopdrawings for all related works in this section of the BoQshowing any changes maybe required for the bestperformance of the systems in this section. All Work-Shop Drawings has to be approved by the Engineer priorstarting the work in site.

The following notes should be considered when pricing:

1- The price shall include all required digging orexcavation backfilling and cement covering as specified.

2- The price shall include all connections to existingdrainage pipes.

3- The contractor must consider keeping the systemrunning in the building during the whole constructionperiod.

9.1.1

Supply and install (S & I) drain water pipe for airconditioning equipment drainage, and stand pipes. Pipesrun exposed and are fastened to walls and under ceiling,shafts, or pipes laid within walls and under floors. Priceincludes all supports and fasteners, digging, backfillingand proper connections to air conditioning, floor drain,and all required connection with pipes imbedded in walls.All done as per drawings, Specifications and theApproval of the Engineer.

9.1.2 2" Lm 110

Page 17: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 17 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$( BILL NO. ' 9 ' )

MECHANICAL WORKS

9.1.3

S & I PVC waste water and drain pipes heavy duty BS4669, running exposed along partitions, false ceiling,walls, shafts, under tiles or laid in walls. Price include alltype of fittings, rubber seals, supports, hooks, and allexcavation and quarrying. All done as per drawings,Specifications and the Approval of the Engineer.

9.1.4 4" pipe Lm 85

9.1.5 2" pipe Lm 90

9.1.6

S & I 4/2" Floor drain type multi inlet adjustable with trap.Dura coated cast iron body with integral trap seal,complete with bronze clean out plug, invert collar and 5"round, polished nickel bronze adjustable top. The rateshall include for all connections with drain pipes andfixtures.

No 7

9.1.7 Ditto, but 4" Floor Trap. No 13

9.1.8S & I non adjustable floor clean out with Dura coatedcast iron body, with gas and water tight ABS plug andframe.

No 11

Total of waste and drainage systems Carried to Summary Sheet

Page 18: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 18 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$( BILL NO. ' 9 ' )

MECHANICAL WORKS

9.2 Sanitary Fixture and their Accessories:

The Contractor shall, when pricing the rates of this bill, take into consideration including and allow for the costs or expenses of all requirements stipulated in the preambles, drawings and technical specification of the contract.

The Contractor has to provide complete Work-Shopdrawings for all related works in this section of the BoQshowing any changes maybe required for the bestperformance of the systems in this section. All Work-Shop Drawings has to be approved by the Engineer priorstarting the work in site.

9.2.1S & I Porcelain wall hung wash basin in toilets of size 420x560 mm with proper fixing with Marble where needed. The rate shall include S & I the following:

No. 7

9.2.2Ditto but for handicapped specifications for handicapped toilets, with all the required accessories needed other than the following items.

No. 2

9.2.3 Semi pedesta. No. 9

9.2.4 Chrome plated gear mixer type. No. 9

9.2.5 Chrome plated syphon" heavy duty" No. 9

9.2.6 3/8" Angle valve No. 18

9.2.7 Fixing galvanized screws . No. 18

9.2.8S & I Porcelain wall hung W.C white color size 530x360 European type, P-trap . The rate shall include for the following:

No. 9

9.2.9 Concealed steel support frame. No. 9

9.2.10 Seat with cover including stainless steel hinges. No. 9

9.2.11 Push button 6Lt silent flush valve. No. 9

9.2.12 Concealed stainless steel gage 12 service box and cover size 30x30x15 cm for flush valve maintenance. No. 9

9.2.13 Stainless steel Paper holder for single roll fixed to wall. No. 9

9.2.14 3/8" Angle valve. No. 18

Page 19: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 19 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$( BILL NO. ' 9 ' )

MECHANICAL WORKS

9.2.15 Fixing galvanized screws . No. 18

9.2.16 Chrome plated hand shower for wc (heavy duty) with all required parts to be connected with water pipe in wall. No. 9

9.2.17Horizontal two way grab bar for handicapped W.C 914x1372 mm. The rate shall include for fixing the bar at wall using special fixing and mortar mix.

No. 2

9.2.18

S & I stainless steel kitchen sink, with all the needed fixation and support with the wall and the marble. Price includes all the needed connections with drain pipes and the following:

No. 2

9.2.19 Kitchen Chrome plated syphone" heavy duty" No. 2

9.2.20 3/8" Angle valve. No. 4

9.2.21 Fixing galvanized screws . No. 8

9.2.22 S & I Chrome plated swivel - spout mixer for stainless steel kitchen sink, with chain and rubber plug. No. 2

9.2.23 Heavy duty soap dispenser with all fixing accessories needed. No 11

9.2.24 Heavy duty towel paper holder for single roll to be fixed at wall with all fixing accessories needed. No 7

9.2.25S & I mirror with white aluminum frame with sizes40X60cm. The rate shall include fixing the mirror to walland according to the Engineer.

No 9

9.2.26S & I automatic hand dryer 2000 W. The rate shallinclude fixing the unit to wall and all required electricalconnections.

No 5

Sanitary fixture and their accessories. Carried tomechanical summery sheet

Page 20: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 20 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$( BILL NO. ' 9 ' )

MECHANICAL WORKS

9.3 Domestic Hot and Cold Water System:

The Contractor shall, when pricing the rates of this bill, take into consideration including and allow for the costs or expenses of all requirements stipulated in the preambles, drawings and technical specification of the contract.

The Contractor has to provide complete Work-Shopdrawings for all related works in this section of the BoQshowing any changes maybe required for the bestperformance of the systems in this section. All Work-Shop Drawings has to be approved by the Engineer priorstarting the work in site.

9.3.1

Supply and install galvanized Sch40 pipes for cold waterand hot water. The work includes all fittings, valves,TOLGO type hangers, saddles, connection betweenrisers and collectors and all other accessories, includingvalves, fittings, tees, Nipples, flexible connections, andall related parts.

a 1/2" LM 4

b 3/4" LM 4

c 1" LM 5

d 1 1/4" LM 5

e 1 1/2" LM 5

f 2" LM 5

9.3.2

S & I hot and cold water collectors. Price shall include allrequired fittings, valves, factory-coated steel cabinet, andall related works as per the drawings, specifications andthe approval of the Engineer.

a 1" Eye 4

b 1 1/4" Eye 36

Page 21: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 21 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$( BILL NO. ' 9 ' )

MECHANICAL WORKS

9.3.3

S & I crossed linked PE pipe with diffusion oxygen barrier layers. The rate shall include all fittings eq: copper elbow inside walls, 1/2" male and female adaptors and all needed accessories for connection between copper collectors to fixtures.

a 17mm pipe with 32 mm sleeve Lm 310

b 25mm pipe with 36 mm sleeve Lm 60

9.3.4

S & I hot water 60 liters cylinder horizontal type above false ceiling in the toilets with electric coil, all piping and connection till hot water collector and cold water feeder pipe complete with all accessories needed as per drawings, specifications and engineers' instructions. The work shall be completed as specified and according to the Engineer's instructions.

No. 2

9.3.5

S & I of electrical drinking fountain of capacity 40 L/H of approved manufacture. The price complete with all necessary fitting and pipes for connection of cold water and drain pipes. Price includes also electrical supply. The work shall be completed as specified and according to the Engineer's instructions.

No. 2

Total of Domestic Services Carried to Summary Sheet

Page 22: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 22 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$( BILL NO. ' 9 ' )

MECHANICAL WORKS

9.4 HVAC System:The contractor shall, when pricing the rates of this bill take into consideration including and allow for the cost expenses of all requirements stipulated in the preambles, drawings and technical specifications of the contract. Also the contractor must consider the fact that this project is a running complex and must be kept as so during the whole period of construction.

The Contractor has to provide complete Work-Shopdrawings for all related works in this section of the BoQshowing any changes maybe required for the bestperformance of the systems in this section. All Work-Shop Drawings has to be approved by the Engineer priorstarting the work in site.

Price of the following VRF Units include completesupplying, installation and commissioning for the units.Price of the following units include all required installationand commissioning works consisting and not limited to:

*

L-Type Copper networks and pipes of ANY required sizeand shape welded and joined as per Specifications,insulated with 13mm insulation and wrapped with whitecolor plastic band, all as per the approval of theEngineer. Price of the units has to include also all relatedfittings for the network, as per the recommendation of theUnits Manufacturer, that includes also the requiredRefnets branching kit of any kind and specifications,tees, branches, valves, flexible connections, and allneeded parts to complete the network.

*All electrical and control connections, wiring, breakers,electric parts, between the units and between the unitsand the Electrical Distribution Board.

Supply, install and commission heat pump VRF system.Refrigerant R410A Complete with the outdoor and indoorunits, piping network, control systems and all the needednecessary parts according to the drawings andspecifications. Applies for the following:

Page 23: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 23 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$( BILL NO. ' 9 ' )

MECHANICAL WORKS

9.4.1

Supply, install and commission outdoor VariableRefrigerant Flow (VRF) heat pump air conditioning setsbased on refrigerant R410, consisting of the requiredunits as per drawings and approved by the Engineer.The price include control system, steel bases, gas pipesnetwork from outdoor units till the indoor units located ondrawings, in addition to headers and pipes branches andall accessories needed to complete the job. The priceshall also include electrical wirings and connection tomain distribution boards.

a 75.8 kW Set 1

b 91.7 kW Set 1

9.4.2

Supply, install, and commission indoor VRF airconditioning units ducted concealed type, complete withcopper pipes connections, acoustic insulation adapterbetween the units and ducts, drain pan and connectionsto drain pipes, supports and hangers, builders work,flexible connections, connections with supply duct,electrical wirings and connections to main distributionboards, all according to drawings, specifications, andapproval of supervisor engineer, as follows:

a Concealed ceiling type 17 kW as shown on Drawings. No. 4

b Concealed ceiling type 14 kW as shown on Drawings. No. 1

c Concealed ceiling type 12 kW as shown on Drawings. No. 1

d Concealed ceiling type 8 kW as shown on Drawings. No. 1

Page 24: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 24 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$( BILL NO. ' 9 ' )

MECHANICAL WORKS

9.4.3

Supply, install, and commission indoor VRF airconditioning units two ways cassette type, complete withcopper pipes connections, drain pan and connections todrain pipes, supports and hangers, builders work,electrical wirings and connections to main distributionboards, all according to drawings, specifications, andapproval of supervisor engineer, as follows:

a Cassette type 7.3 kW as shown on Drawings. No. 1

b Cassette type 5.6 kW as shown on Drawings. No. 4

c Cassette type 3.6 kW as shown on Drawings. No. 3

d S & I Control: Wired remote control with digital displayand function buttons, include 2*1.5 mm cable for control. No. 17

9.4.4

Supply, install, and commission of forward curve singlephase decorative split unit heat pump with low ambientkit special for server rooms. The unit shall be a singlecoil with drain pan made of stainless steel and with allparts such as copper valves, washable flat filter, multispeed electric motor and room thermostat with distantremote controller. The rate includes copper pipes ofproper diameters with 9 mm insulation and 10 cm plasticwrap strips, all the required fittings internally andexternally, flexible pipe for drain water to be connected tothe PVC A/C drain pipe in wall, electrical power andcontrol cable, and any other material deemed necessaryto complete the job.

The external units shall be in a location selected andapproved by the Engineer, they may be located in theoutdoor in a place not visible and away from theentrances, or the roof, the price shall include galvanizedsteel wall hangers or floor stands for the units, withhinges and locks. The units are to be special to meet therequirements of the server rooms with low ambient kitsand any other specifications.

Page 25: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 25 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$( BILL NO. ' 9 ' )

MECHANICAL WORKS

a Wall mounted type 2 kW. No. 1

b Wall mounted type 11 kW. No. 2

9.4.5

Supply and install white anodized Aluminum, of approvedquality, 4-way supply air diffusers with registers. Theprice includes galvanized adapter, opening in falseceiling or gypsum boards, and duct flexible connectionof size as shown on the drawings. The sizes of grilles areas follows:

a 30X30 cm No. 33

9.4.6

Supply and install white anodized Aluminum, of approvedquality, return air grilles. The price includes opening infalse ceiling or gypsum boards. The sizes of grilles areas follows:

a 30X30 cm No. 17

b 60X60 cm No. 10

9.4.7

Supply and install galvanized metal sheet rectangular duct, with thickness according to ASHRAE Standards, for air conditioning system. The price includes thermal external insulation (1" thick, 24kg/m3 density), all joints, sealant compound, fire retardant sealant, volume dampers and fire dampers (where required), splitter dampers, galvanized hangers, and hooks. All as per drawings, Specifications and the approval of the Engineer.

M2 320

9.4.8

Supply, install and commission wall type exhaust air fan, with automatic shutter of 30 l/s air flow. The price includes openings in walls or windows, electrical wirings and connections to main distribution board according to engineer’s instructions.

No. 1

Page 26: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 26 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$( BILL NO. ' 9 ' )

MECHANICAL WORKS

9.4.9

Supply and install ducted in-line exhaust fan of size 180 l/s air flow. The price includes vibration isolators, galvanized adapter, flexible connection and all accessories needed for installation and commissioning. The price shall also include outdoor rain water gravity grilles with insect mesh and shutter according to the sizes shown on drawings, and also electrical and control cables and connections to main distribution board, all according to drawings and engineer’s instructions. The fans capacities are as follows:

No. 2

9.4.10

Supply and install galvanized metal sheet duct, withthickness according to ASHRAE Standards, for exhaustand fresh air system. The price includes all joints, sealant compound, fire retardant sealant and all necessaryaccessories, dampers (where required), splitterdampers, galvanized hangers, and hooks.

M2 30

9.4.11

Supply and install white anodized Aluminum, of approvedquality, exhaust and fresh air grilles, with registers. Theprice includes galvanized adapter, opening in falseceiling or gypsum boards, and duct flexible connectionof size as shown on the drawings between the grill andthe duct / exhaust fan. The sizes of grilles are as follows:

a 15X15 cm No. 8

b 23X23 cm No. 4

9.4.12

Supply and install Sch.40 black steel pipes for heatingsystem main pipes. The work includes all fittings, valves,TOLGO type hangers, saddles, welding, threading,connection to existing system (where needed) and allother accessories. Price shall include 13mm thickinsulation for hot water heating pipes. The work includesinsulating all fittings, valves, and wrapping with 10cmplastic wrap. (Contractor has to provide full work-shopdrawings for all related works).

a 1" LM 20

b 1 1/4" LM 20

c 1 1/2" LM 20

d 2" LM 20

Total of HVAC System carried to Mechanical Summary Sheet

Page 27: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 27 / 28

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

NO. US$ US$( BILL NO. ' 9 ' )

MECHANICAL WORKS

9.5 Fire Fighting System:The contractor shall, when pricing the rates of this bill take into consideration including and allow for the cost expenses of all requirements stipulated in the preambles, drawings and technical specifications of the contract.

The Contractor has to provide complete Work-Shopdrawings for all related works in this section of the BoQshowing any changes maybe required for the bestperformance of the systems in this section. All Work-Shop Drawings has to be approved by the Engineer priorstarting the work in site.

Supply, install, and test the following items complete with necessary fixing accessories as specified and as shown in drawings:

9.5.1

Wall mounted fire cabinet 120x80x30 cm equipped with 1" swinging hose reel 30 m polystyrene hose 1" aluminum nozzle, 12 kg powder extinguisher, 2" linen hose (2 x 25 m) with quick coupling, 2" nozzle, 2" landing valve, and all required fittings and valves.

No. 2

9.5.2

Supply and install black steel Sch40 pipes jointed byusing cut grooved coupling joints made by MODGAL orE.A. The work also include all valves, strainer, unions,nipples, fittings, hangers and all needed otheraccessories.

a 2" LM 35

9.5.3

S & I Portable Fire Extinguisher of 3Kg. powdercapacity, each in location as shown on drawings and/ordecided by the Engineer. The installation shall becomplete with brackets and bolts, it should be inaccordance with the Civil Defense specification and asapproved by the Engineer.

No. 10

Total of Fire Fighting System carried to mechanical summary sheet

Page 28: ATLAS 14202 - Finishing Works of Ministry of Interior

ATLAS 14202 - Finishing Works of Ministry of Interior Affairs - RamallahBill of Quantities

page 28 / 28

TotalUS$

Finishing WorksBill No. 1 Hollow Concrete Block

Bill No. 2 Plastering.

Bill No. 3 Tiling, Flooring and Marble works.

Bill No. 4 Carpentry and Joinery Works.

Bill No. 5 Painting Works.

Bill No. 6 False Ceiling and Gypsum Board Works

Bill No. 7 Insulation, Roofing and Expansion and/or Seismic Joints.

A Total of Finishing Works

Bill No. 8 Electrical Works

8.1 Electrical Points

8.2 Conduit, Rigid Piping and Excavation Works

8.3 Cables

8.4 Structural Elements, Cabinets and Ductwork

8.5 Electrical Switchboards

8.6 Lighting Fixture

8.7 Fire Alarm System

8.8 LV Boxes

8.9 Network Installations

B Total of Electrical Works

Bill No. 9 Mechanical Works

9.1 Waste and Drainage System

9.2 Sanitary Fixture and their Accessories

9.3 Domestic Hot and Cold Water System

9.4 HVAC System

9.5 Fire Fighting System

C Total of Mechanical Works

Total of Finishing, Electrical and Mechanical Works (A+B+C)Excluding V.A.T

Date: --------------------------------------------------------------------

Contractor: --------------------------------------------------------------

Summary

Signature: ---------------------------------------------------------------

Item Description

The sum of (in words):