ATES and BTES developments in the Netherlands ......Bloemendal, v. Wijk, Hartog, Pape (H2O -online,...

19
1 ATES and BTES developments in the Netherlands: Optimization and Upscaling dr. Martin Bloemendal, dr. Niels Hartog, dr. Frank Agterberg, Der Geothermiekongress, Munich, 2019-11-19

Transcript of ATES and BTES developments in the Netherlands ......Bloemendal, v. Wijk, Hartog, Pape (H2O -online,...

Page 1: ATES and BTES developments in the Netherlands ......Bloemendal, v. Wijk, Hartog, Pape (H2O -online, 2017). 19 ATES and BTES developments in the Netherlands: Optimization and Upscaling

1

ATES and BTES developments in the Netherlands: Optimization and Upscaling

dr. Martin Bloemendal, dr. Niels Hartog, dr. Frank Agterberg, Der Geothermiekongress, Munich, 2019-11-19

Page 2: ATES and BTES developments in the Netherlands ......Bloemendal, v. Wijk, Hartog, Pape (H2O -online, 2017). 19 ATES and BTES developments in the Netherlands: Optimization and Upscaling

2

Heat transition in NL = growth of ATES & BHE 8,000,000 buildings = 25% of total NL energy use

– ~6,500,000 houses – ~1,500,000 utility buildings – ~10,000 ha greenhouses

• Currently: ~1% have ATES/BHE • In 2050: ~25%

Jaxa-Rozen, Kwakkel, Bloemendal, (under review)

2050 target

Page 3: ATES and BTES developments in the Netherlands ......Bloemendal, v. Wijk, Hartog, Pape (H2O -online, 2017). 19 ATES and BTES developments in the Netherlands: Optimization and Upscaling

3

Page 4: ATES and BTES developments in the Netherlands ......Bloemendal, v. Wijk, Hartog, Pape (H2O -online, 2017). 19 ATES and BTES developments in the Netherlands: Optimization and Upscaling

4

Page 5: ATES and BTES developments in the Netherlands ......Bloemendal, v. Wijk, Hartog, Pape (H2O -online, 2017). 19 ATES and BTES developments in the Netherlands: Optimization and Upscaling

5

Legislation situation: permitting

• Reporting obligation • 6 wk permit procedure • HT-ATES Pilots allowed

• In busy areas: possibility to plan • Reporting of performance

Page 6: ATES and BTES developments in the Netherlands ......Bloemendal, v. Wijk, Hartog, Pape (H2O -online, 2017). 19 ATES and BTES developments in the Netherlands: Optimization and Upscaling

6

Legislation situation: certification

• Design, Build, Operate • Drilling& completion,

Climate installations

Page 7: ATES and BTES developments in the Netherlands ......Bloemendal, v. Wijk, Hartog, Pape (H2O -online, 2017). 19 ATES and BTES developments in the Netherlands: Optimization and Upscaling

7

Rationale for certification

• Allow (partly) irreversible disturbances in the subsurface

• GHG emission must go down

Page 8: ATES and BTES developments in the Netherlands ......Bloemendal, v. Wijk, Hartog, Pape (H2O -online, 2017). 19 ATES and BTES developments in the Netherlands: Optimization and Upscaling

8

BTES borehole completion

Page 9: ATES and BTES developments in the Netherlands ......Bloemendal, v. Wijk, Hartog, Pape (H2O -online, 2017). 19 ATES and BTES developments in the Netherlands: Optimization and Upscaling

9

BTES borehole completion • Clay/bentonite • Cementing

• Verification techniques

Page 10: ATES and BTES developments in the Netherlands ......Bloemendal, v. Wijk, Hartog, Pape (H2O -online, 2017). 19 ATES and BTES developments in the Netherlands: Optimization and Upscaling

10

Page 11: ATES and BTES developments in the Netherlands ......Bloemendal, v. Wijk, Hartog, Pape (H2O -online, 2017). 19 ATES and BTES developments in the Netherlands: Optimization and Upscaling

11

High density use of BTES

Tem

pera

tuur

Page 12: ATES and BTES developments in the Netherlands ......Bloemendal, v. Wijk, Hartog, Pape (H2O -online, 2017). 19 ATES and BTES developments in the Netherlands: Optimization and Upscaling

12

High density use ATES

Page 13: ATES and BTES developments in the Netherlands ......Bloemendal, v. Wijk, Hartog, Pape (H2O -online, 2017). 19 ATES and BTES developments in the Netherlands: Optimization and Upscaling

13

Subsurface heat transport

Page 14: ATES and BTES developments in the Netherlands ......Bloemendal, v. Wijk, Hartog, Pape (H2O -online, 2017). 19 ATES and BTES developments in the Netherlands: Optimization and Upscaling

14

HT-ATES

Page 15: ATES and BTES developments in the Netherlands ......Bloemendal, v. Wijk, Hartog, Pape (H2O -online, 2017). 19 ATES and BTES developments in the Netherlands: Optimization and Upscaling

15

Mismatch availability of heat

ener

gy (G

J)

month

0

20

40

60

80

100

1 3 2 4 5 6 7 8 9 10 11 12

heating heating

storage potential

Heat availability

Page 16: ATES and BTES developments in the Netherlands ......Bloemendal, v. Wijk, Hartog, Pape (H2O -online, 2017). 19 ATES and BTES developments in the Netherlands: Optimization and Upscaling

16

Integration in heat-networks

• Redundacy in supply and off-take

Page 17: ATES and BTES developments in the Netherlands ......Bloemendal, v. Wijk, Hartog, Pape (H2O -online, 2017). 19 ATES and BTES developments in the Netherlands: Optimization and Upscaling

17

Existing buffer at heat network A’dam 22,000 m3 ≈10TJ just enough to cover a weekend

Stam, S., 2016. Enorme opslagtank geeft speelruimte in levering warmte, Energiegids.nl. LT-ATES

Page 18: ATES and BTES developments in the Netherlands ......Bloemendal, v. Wijk, Hartog, Pape (H2O -online, 2017). 19 ATES and BTES developments in the Netherlands: Optimization and Upscaling

18

L&HT-ATES Triplet

Bloemendal, v. Wijk, Hartog, Pape (H2O-online, 2017).

Page 19: ATES and BTES developments in the Netherlands ......Bloemendal, v. Wijk, Hartog, Pape (H2O -online, 2017). 19 ATES and BTES developments in the Netherlands: Optimization and Upscaling

19

ATES and BTES developments in the Netherlands: Optimization and Upscaling

dr. Martin Bloemendal +31 625179849 [email protected] / [email protected]