Financial Resources Physical Resources Human Resources Organizational Goals.
Atapa Resources
Transcript of Atapa Resources
ATAPA RESOURCESATAPA RESOURCESExploring Northern Ontario’s Hidden Treasures
ATAPAATAPA
Exploring Northern Ontario’s Hidden Treasures
Corporate Overview
Atapa Resources has 3 major projects with detailed work commitments scheduled.
All 3 properties are located 40 kilometers from the center of Timmins, Ontario.
The major resources being explored are Nickel and Copper.
Currently working towards a NI-43101 report on all 3 properties.
Experienced management team with a proven track record.
ATAPAATAPA
Exploring Northern Ontario’s Hidden Treasures
About Nickel and Copper
Surging global demand for Nickel and Copper metals resulting from the development of infrastructure in emerging markets.
Main use for Nickel and main use for Copper. The supply and demand fundamentals for Nickel and Copper, creates
upward pressure on the price of these commodities (as show below.)
ATAPAATAPA
Exploring Northern Ontario’s Hidden Treasures
Location Map – Ontario
ATAPAATAPA
Exploring Northern Ontario’s Hidden Treasures
Why Timmins
World Class Infrastructure Hydro, Rail and Highways Year Round Accessibility Technical Expertise Xstrata Kidd Creek Meteorological Plant
• Billion Dollar Infrastructure• One Nickel Circuit Currently Receiving Ore From Montcalm
Deposit
Exceptional Blue Sky exploration potential within Timmins base metal camp.
ATAPAATAPA
Exploring Northern Ontario’s Hidden Treasures
Why Timmins
Economic Nickel Deposits in Sounding Area Fletcher Nickel - Texmont Mine Liberty Mines - Redstone Deposit Golden Chalice – Langmuir Deposit Xstrata - MontCalm Deposit Xstrata - Kidd Creek Mine
• World class VMS deposit• Kidd’s concentrating, smelting and refining processes are
among the most advanced in the world.• Increasing tonnage and grade at depth.• Deepest base metal orebody being mined in the world today.
ATAPAATAPA
Exploring Northern Ontario’s Hidden Treasures
Property Histories
LRD Nickel Property 16 kilometers due west of Kidd Creek and 34 kilometers north east of Xtrata Montcalm deposit. Over 200 claim units. Follows high-potential north south nickel bearing structure. Historic Cominco drill holes 0.41 Nickel 0.2 Copper over 7 meters. 2005 – 3rd of the property flown GeoTEM. Minimum 7 high priority targets identified.
Monetta Porcupine Nickel Property Over 440,000 tones drilled off of 0.7% Nickel 0.6% Copper. Over 23 patented claims. Only drilled to 800 feet vertical depth. Potential to increase tonnage at depth. Potential to further infill drill to increase historic tonnage estimate.
Warren-Whiteside Nickel Copper Property Privately acquired 14 patented claims that has seen very little modern geological work. 1987 AeroTem government geophysical airborne survey indicating at least 8 anomalies. 1955 historic resource of 385,000 tones of 1% combined nickel copper. Targets have never had modern geological methods applied to them. Adjacent to Warren property Whiteside property 3 promising airborne geophysical anomalies.
ATAPAATAPA
Exploring Northern Ontario’s Hidden Treasures
Project Locations – Geological Map
LRD Nickel Property
Warren-WhitesideWarren-WhitesideNickel Copper Nickel Copper PropertyProperty
Monetta Porcupine Nickel Property
ATAPAATAPA
Exploring Northern Ontario’s Hidden Treasures
Projected Budget (3 Properties)
Projected for December 2007 – March 2008 Line Cutting - $80,000 Ground IP and MAG Geophysics - $100,000 Airborne Geophysics - $50,000 Drilling (1500 Meters) - $200,000 Contingency - $70,000 Administration/Wages - $50,000
TOTAL = $550,000
ATAPAATAPA
Exploring Northern Ontario’s Hidden Treasures
LRD Property
Work commitment Currently 10 kilometers of line cutting. 10 kilometers of IP Geophysics contracted out before
2007 year end. Identifying drill targets for early 2008. 43-101 report currently being compiled.
ATAPAATAPA
Exploring Northern Ontario’s Hidden Treasures
Warren-Whiteside Property
Work Commitment 55 kilometers of line cutting. Over 55 kilometers of IP and MAG Geophysics. GeoTem IIB to be flown on Warren and adjecent
Whiteside property. Targets to be assessed and evaluated to be prioritized
for drilling in early 2008. Potential for additional staking. 43-101 report currently being compiled.
ATAPAATAPA
Exploring Northern Ontario’s Hidden Treasures
Monetta Porcupine Property
Work Commitment 1500 Meters of infill drilling. 10 Kilometers of line cutting. 10 Kilometers of IP ground geophysics. 43-101 report currently being compiled.
ATAPAATAPA
Exploring Northern Ontario’s Hidden Treasures
Comparative Valuation Chart
Company Symbol Share Price(Dec 12, 2007)
Outstanding Shares
Market Cap
Golden Challis GCR $0.95 80.2M 76.2M
Liberty Mines LBE $1.17 80.5M 94.2M
Inspiration Mining ISM $3.43 67.0M 229.8M
Amador Gold Resources
AGX $0.365 108.6M 39.6M
Sedex Exploration SDN $0.10 79.3M 7.9M
Fletcher Nickel FL $0.75 22.4M 16.8M
ATAPAATAPA
Exploring Northern Ontario’s Hidden Treasures
Share Structure
Issued Shares: 14MOptions: 1MWarrants: nil Fully Diluted: 15M
Institutional - Estimated nilManagement & Insiders: 15MFloat: nil
Cash on hand: $260,000Fully Diluted Cash: $260,000
Market Cap. (F/D): $N/A
Current as of December 2007
ATAPAATAPA
Exploring Northern Ontario’s Hidden Treasures
Management Team
Stephen Dunn A few points … …
Frank Smenk A few points … …
Don Sheldon A few points … …
Who Ever Else A few points … …
ATAPAATAPA
Exploring Northern Ontario’s Hidden Treasures
Summary
Timmins base metal camp represents exceptional blue sky exploration potential (e.g. Kidd Creek.)
Timmins area represents tremendous technical and logistical infrastructure.
Outstanding mining, financial, and legal managerial experience.
3 underdeveloped properties with very little historical geological work.
ATAPAATAPA
Exploring Northern Ontario’s Hidden Treasures
Forward Looking Statements
This presentation may include certain “forward-looking statements”. All statements other than statements of historical fact, included herein, including, without limitation, statements regarding future plans and objectives of the company, are forward-looking statements that involve various risks, assumptions, estimates and uncertainties. These statements reflect the current internal projections, expectations or beliefs of the company and are based on information currently available to the company. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. All of the forward looking statements contained in this presentation are qualified by these cautionary statements and the risk factors described above. Furthermore, all such statements are made of the date this presentation is given and the company assumes no obligation to update or revise these statements.
An investment in the company is speculative due to the nature of the company's business. The ability of the company to carry out its growth initiatives as described in this confidential PowerPoint presentation is dependant on the company obtaining additional capital. There is no assurance that the company will be able to successfully raise the capital required or to complete each of the growth initiatives described. Investors must rely upon the ability, expertise, judgment, discretion, integrity and good faith of the management of the company.