At the beginning there were two canals:

24
At the beginning there were two canals: Canal Forth and Clyde was built in 1777 between harbors Grangemouth and Falkirk connecting Glasgow with west cost of Scotland. Canal Union between Falkirk and Edinburgh was finished in 1822. Because of geographical difficulties, which created a difference of 79ft.in elevation, the two canals were connected by 11 locks.

description

At the beginning there were two canals: Canal Forth and Clyde was built in 1777 between harbors Grangemouth and Falkirk connecting Glasgow with west cost of Scotland. Canal Union between Falkirk and Edinburgh was finished in 1822. - PowerPoint PPT Presentation

Transcript of At the beginning there were two canals:

Page 1: At the beginning there were two canals:

At the beginning there were two canals:Canal Forth and Clyde was built in 1777 between harbors Grangemouth and Falkirk connecting Glasgow with west cost of Scotland. Canal Union between Falkirk and Edinburgh was finished in 1822. Because of geographical difficulties, which created a difference of 79ft.in elevation, the two canals were connected by 11 locks.

Page 2: At the beginning there were two canals:
Page 3: At the beginning there were two canals:

In 1963, after 150 yrs of existence of this water way with 11 locks the construction of a huge water carousel started. This extraordinary idea was finished in 2002 and became a symbol of Scotland. This invention saves not only time but also energy.

Page 4: At the beginning there were two canals:
Page 5: At the beginning there were two canals:
Page 6: At the beginning there were two canals:

This is the only rotational boat transporter in the world. It has two arms and each arm forms a kind of huge tub filled with water. Boats enter the tub, then the tub locks up and the huge arm starts rotating .

Page 7: At the beginning there were two canals:

lower canallower canal

Page 8: At the beginning there were two canals:

Entrance to lower canalEntrance to lower canal

Page 9: At the beginning there were two canals:

A Boat is approaching the “tub”A Boat is approaching the “tub”

Page 10: At the beginning there were two canals:
Page 11: At the beginning there were two canals:

There are boats in both “tubs” There are boats in both “tubs” upper and lowerupper and lower

35 m35 m

Page 12: At the beginning there were two canals:

Rotation is startingRotation is starting

Page 13: At the beginning there were two canals:

Boats in both rotating armsBoats in both rotating arms

Page 14: At the beginning there were two canals:

rotationrotation

Page 15: At the beginning there were two canals:

Otáčení...Otáčení...

Page 16: At the beginning there were two canals:

Just before “landing”Just before “landing”

Page 17: At the beginning there were two canals:
Page 18: At the beginning there were two canals:
Page 19: At the beginning there were two canals:

Closing the gate , regulation of level of water and “tubs” rotationTakes 15 min. only.

Page 20: At the beginning there were two canals:
Page 21: At the beginning there were two canals:

One “tub” 78ft. Long with water and boat weights about 300 tons. One “tub” 78ft. Long with water and boat weights about 300 tons.

Page 22: At the beginning there were two canals:

The “tubs” are filled according the Archimedes’ Law.So the weight of “tubs” are balanced.

To open the upper and lower lock and turn the whole system by 180◦ they need an engine of 22.5 kW which only use 1.5 kWh

Page 23: At the beginning there were two canals:
Page 24: At the beginning there were two canals: