Commodore Condominiums Honolulu, HI Photos Taken : August. 27, 2001 Project completed—1995
PROJECTUPDATE
Client: Couch Distributing Watsonville, CA
Dealer: Dinyari Construction Project:: 49,000 square feet
Before project commencement
During project - After waterproofing of seams and before ceramic finish coats
Completed project
Client: Minute Maid (Cold Storage) Auburndale, Florida
Dealer: Florida Exterior Coatings Project: 82,825 sq. ft. side walls
All chalking and surface oxidation is removed and primed with ASTEC #4000 Surface Conditioner
FINISH COAT BEING APPLIED
BEFORE
AFTER
BEFORE
AFTER
AFTER
AFTER
Client: Neo-Plan Brownsville, TX
Dealer: CCI-Commercial Roofing Project Square Footage: Roof-239,367 , Walls 66,473 = Total of 305,840
Client: Ernest N. Morial Convention Center New Orleans, LA
Dealer: Continental Roofing Project: 364,200 square feet
Client: Port of Pensacola Pensacola, Florida
Dealer: Gulf Coast Thermal Coatings Project:: 88,825 sq. ft. Roof & Side walls
II
Pro-Line Boats Crystal River, FL Sept. 2000
The Pro-Line Boat manufacturing facility in West-Central Florida was plagued with numerous leaks. The main culprit was a roof sprinkling system used in an attempt to cool the fiberglass fabrication building.
This large pumping system was used to pump large amounts of water to the roof. This created rust and corrosion problems as well as compounding the leaking roof problem.
Roof had several roof fans that could not be used. The movement of air would have been a production and health problem from fiberglass fibers blowing around. The roof fans were re-moved. The roof also has many sky-lights.
Another one of three buildings the were treated with the Astec System
Temperatures inside the fabricating building were sometimes near 100 degrees.
Pro-Line Boats Pg.2
All horizontal and vertical seams were repaired as needed and sealed. Skylights were sealed. Roof top fans were removed and new metal installed.
Employees said they could feel an immediate drop in the inside temperature as the coating was being applied.
Aerial view of the fiberglass fabricating building
Arrows indicate the three buildings receiving the Astec System. Pro-Line has since asked for a bid on their other facilities (Donzi) in south Florida.
Client:: Queen of Peace Church Ocala, Florida
Dealer: George Taylor Thermal Coatings Project:: 35,000 Sq. Ft Sidewalls
Client: Roanoke Industrial Park Roanoke, VA
Dealer: Wicks Painting Project: 68,320 sq. ft.
Client: Washington Square Center Denver, Colorado
Dealer: Thermacoat Project: 14,000 sq. ft. side wall
ASTEC was specified as the finish system for this new construction.
AFTER
AFTER