Commodore Condominiums Honolulu, HI Photos Taken : August. 27, 2001 Project completed—1995 PROJECT UPDATE

description

Updates to previous Astec projects

Transcript of Astec Project Updates

Page 1: Astec Project Updates

Commodore Condominiums Honolulu, HI Photos Taken : August. 27, 2001 Project completed—1995

PROJECTUPDATE

Page 2: Astec Project Updates

Client: Couch Distributing Watsonville, CA

Dealer: Dinyari Construction Project:: 49,000 square feet

Before project commencement

During project - After waterproofing of seams and before ceramic finish coats

Completed project

Page 3: Astec Project Updates

Client: Minute Maid (Cold Storage) Auburndale, Florida

Dealer: Florida Exterior Coatings Project: 82,825 sq. ft. side walls

All chalking and surface oxidation is removed and primed with ASTEC #4000 Surface Conditioner

FINISH COAT BEING APPLIED

BEFORE

AFTER

BEFORE

AFTER

AFTER

AFTER

Page 4: Astec Project Updates

Client: Neo-Plan Brownsville, TX

Dealer: CCI-Commercial Roofing Project Square Footage: Roof-239,367 , Walls 66,473 = Total of 305,840

Page 5: Astec Project Updates

Client: Ernest N. Morial Convention Center New Orleans, LA

Dealer: Continental Roofing Project: 364,200 square feet

Page 6: Astec Project Updates

Client: Port of Pensacola Pensacola, Florida

Dealer: Gulf Coast Thermal Coatings Project:: 88,825 sq. ft. Roof & Side walls

II

Page 7: Astec Project Updates

Pro-Line Boats Crystal River, FL Sept. 2000

The Pro-Line Boat manufacturing facility in West-Central Florida was plagued with numerous leaks. The main culprit was a roof sprinkling system used in an attempt to cool the fiberglass fabrication building.

This large pumping system was used to pump large amounts of water to the roof. This created rust and corrosion problems as well as compounding the leaking roof problem.

Roof had several roof fans that could not be used. The movement of air would have been a production and health problem from fiberglass fibers blowing around. The roof fans were re-moved. The roof also has many sky-lights.

Another one of three buildings the were treated with the Astec System

Temperatures inside the fabricating building were sometimes near 100 degrees.

Page 8: Astec Project Updates

Pro-Line Boats Pg.2

All horizontal and vertical seams were repaired as needed and sealed. Skylights were sealed. Roof top fans were removed and new metal installed.

Employees said they could feel an immediate drop in the inside temperature as the coating was being applied.

Aerial view of the fiberglass fabricating building

Arrows indicate the three buildings receiving the Astec System. Pro-Line has since asked for a bid on their other facilities (Donzi) in south Florida.

Page 9: Astec Project Updates

Client:: Queen of Peace Church Ocala, Florida

Dealer: George Taylor Thermal Coatings Project:: 35,000 Sq. Ft Sidewalls

Page 10: Astec Project Updates

Client: Roanoke Industrial Park Roanoke, VA

Dealer: Wicks Painting Project: 68,320 sq. ft.

Page 11: Astec Project Updates

Client: Washington Square Center Denver, Colorado

Dealer: Thermacoat Project: 14,000 sq. ft. side wall

ASTEC was specified as the finish system for this new construction.

AFTER

AFTER