Assessment of Baseline Geomorphic Features at Proposed Stream Crossings On The Proposed County Road 595 Marquette County, Michigan Prepared for: Kennecott Eagle Minerals Company Marquette, Michigan Prepared by: King & MacGregor Environmental, Inc. 2520 Woodmeadow SE Grand Rapids, Michigan 49546 www.king-macgregor.com September 2011

Transcript of Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1)...

Page 1: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Assessment of Baseline Geomorphic Features at

Proposed Stream Crossings On The Proposed County Road 595

Marquette County, Michigan

Prepared for:

Kennecott Eagle Minerals Company Marquette, Michigan

Prepared by:

King & MacGregor Environmental, Inc. 2520 Woodmeadow SE

Grand Rapids, Michigan 49546 www.king-macgregor.com

September 2011

Page 2: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Stream Assessment for CR 595 September 2011 King & MacGregor Environmental, Inc.

TABLE OF CONTENTS

INTRODUCTION……………………………………………………………………………………....1

STUDY AREA………..……………………………………………………………………………….1    METHODS…..………………………………………………………………………………………...1

   RESULTS……………………………..……………………………………………………………….2  

 DISCUSSION…………………………………………………………………………………………..3

   REFERENCES

   FIGURES AND TABLES

   

Table 1. Stream Data

Page 3: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Stream Assessment for CR 595 September 2011 King & MacGregor Environmental, Inc.

INTRODUCTION

King & MacGregor Environmental Inc. (KME) was contracted by Kennecott Eagle Minerals Company (KEMC) to collect baseline geomorphic information on multiple streams and rivers located along the proposed County Road 595 (CR 595) for use in the design of potential road-stream crossings. The protocol used was developed in consultation with personnel at the Michigan Department of Environmental Quality (MDEQ) and Michigan Department of Natural Resources (MDNR). This protocol is based on methods described in Stream Simulation: An Ecological Approach to Providing Passage for Aquatic Organisms at Road-Stream Crossings (USDA, 2008).

Study Area

The area of investigation is along the proposed CR 595 route, which is located in west-central Marquette County. The proposed road connects US-41 with Triple A Road and generally is located in portions of the following: Sections 13, 23, 24, 26, and 35, (T50N-R29W) Michigamme Township; Sections 18, (T50N-R28W) Champion Township; Sections 2, 11, 14, 23, 25, 26, and 36, (T49N-R29W) Champion Township; Sections 1, 12, 25, 35 and 36, (T48N-R29W) Champion Township; Sections 7, 18, 19, and 30, (T48N-R28W) Ely Township; Section 2, (T47N-R29W)Humboldt Township.

Generally, the streams and rivers within the northern two-thirds of the area of investigation flow into Lake Superior and are part of the Yellow Dog and Dead River watersheds. The streams and rivers within the southern one-third of the area of investigation are part of the Middle Branch Escanaba River that flows into Lake Michigan and is in the Escanaba River watershed.

METHODS

Prior to field data collection, an in-office review of relevant literature was conducted.

Field data was collected from July 2010 through September 2010 and August and September 2011.

Twenty-three potential road-stream crossing locations were evaluated. KME staff, assisted by surveyors from Coleman Engineering Company and AECOM, investigated each of the road-stream crossing locations for measurable geomorphic features as described in Chapter 5 of the Steam Simulation methodology (USDA, 2008).

The protocol used attempts to document bankfull stream width at three riffle locations near the crossing point. If three riffle locations were not present, two bankfull stream widths were measured. Since a riffle is the most geomorphically stable feature, the bankfull width measurement was obtained by first determining naturally occurring geomorphic bankfull features in riffle locations close to but outside of the proposed road crossings. Bankfull widths were surveyed at riffles (generally two upstream and one downstream, if available). A detailed cross section at each riffle was surveyed and its location marked with a steel survey monument. A longitudinal profile was surveyed in the thalweg (deepest part of the channel) between the upstream and downstream riffles. Stream geomorphologic features were documented and summarized in field data forms.

In certain circumstances (ie beaver activity) riffles were not available for measurement. In these instances, bankfull measurements were taken at other stable locations or HEC-RAS modeling was used to characterize the conveyance needed.

Page 4: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Stream Assessment for CR 595 September 2011 King & MacGregor Environmental, Inc.

RESULTS

Twenty-three watercourse crossing locations were surveyed. Four categories of streams were observed: 1) streams where a full assembly of geomorphic features was present; 2) large streams where three riffles were not present; 3) streams where flow was insufficient to build geomorphic features; and 4) streams where beaver dams altered the system such that geomorphic stream features were not present. Table 1 indicates the cross sections surveyed and the average bankfull width measured at that location. Data sheets for each of the surveyed crossings are included in the Appendix.

Table 1. Stream Data

Road Station

Width in Feet

Stream Crossing Cross

section 1(ft)

Cross Section

2 (ft)

Cross Section

3 (ft)

Average Bank full Width (ft)

Middle Branch Escanaba 122+50 27.0 35.5 34.0 32.2

Second River 261+00 14.5 11.4 17.7 14.5

Trembath Lake Outlet 311+91 7.0 10.5 10.8 9.4

Unnamed Stream 3023+75 2.7 5.4 6.1 4.7

Kipple Creek 3050+35 9.4 11.6 9.7 10.2

Unnamed Tributary to Kipple Creek 1 3088+36 N/A N/A N/A N/A

Unnamed Tributary to Kipple Creek 2 3114+37 3.3 3.3 4.8 3.8

Unnamed Tributary to Dishno Creek 1130+96 3.8 4.8 N/A 4.3

Unnamed Tributary to Voelkers Creek 1219+67 5.6 2.8 3.3 3.9

Voelkers Creek 1225+61 4.1 6.7 13.6 8.1

Dead River 1353+00 29.4 26.7 N/A 28.1

Unnamed Tributary to Wildcat Canyon Creek 1404+15 N/A N/A N/A N/A

Unnamed Tributary to Wildcat Canyon Creek 1418+67 4.4 3.6 N/A 4.0

Unnamed Tributary to Wildcat Canyon Creek 1423+13 2.9 3.1 1.8 2.6

Wildcat Canyon Creek 1430+13 4.4 8.6 5.0 6.0

Unnamed Tributary to Mulligan Creek 1 1506+70 9.4 7.5 8.0 8.3

Unnamed Tributary to Mulligan Creek 2 1513+27 3.7 2.4 N/A 3.1

Unnamed Tributary to Mulligan Creek 3 1522+93 N/A 1.2 3.7 2.5

Unnamed Tributary to Mulligan Creek 4 1527+21 0.8 1.2 2.9 1.6

Unnamed Tributary to Mulligan Creek 5 1556+82 N/A N/A N/A N/A

Mulligan Creek 1566+00 17.9 10.8 N/A 14.4

Yellow Dog River 1712+00 26.8 16.2 N/A 21.5

East Branch Salmon Trout 29+74 12.0

N/A = Geomorphic feature not present

DISCUSSION

A wide variety of streams and rivers were encountered and surveyed. Some of the smallest streams were ephemeral (spring flow only) with bankfull widths of only a few feet or less and no flow observed. Other small first order streams had base flow primarily from groundwater discharge (seeps and springs). The larger rivers had significant flows and significant bankfull widths. Contributing watersheds varied from a few acres for the smallest of the streams to many square miles for the Yellow Dog River and the Middle Branch Escanaba River. Bankfull features were generally observable except where active or historic beaver activity has impacted

Page 5: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Stream Assessment for CR 595 September 2011 King & MacGregor Environmental, Inc.

the watershed and heavy siltation had occurred (beaver meadows). Beaver activity was observed at Voelkers Creek, Dead River, Wildcat Canyon Creek (Crossing 1) and Mulligan Creek crossing locations. As documented in the longitudinal profiles, the slope characteristics of the streams/rivers varied from generally low gradient (less than 0.05 percent) to very steep (greater than 10 percent). The steeper gradient streams were primarily associated with bedrock at or near the ground surface and these were generally the smaller streams located within the Mulligan River watershed.

REFERENCES

Freiburger, C. & Fulcher, J. 2009. Culvert sizing and installation – stream simulation. PowerPoint presentation. Michigan Department of Natural Resources, Lansing, Michigan.

Leopold, L. B., Wolman, M. G., and Miller, J. P. 1964. Fluvial processes in geomorphology. Dover Publications, Inc, New York, 1995 unabridged republication, 522 pp.

Leopold, L. B. 1994. A view of the river. Harvard University Press, Cambridge Massachusetts.

Rosgen, D. L. 1994. A classification of natural rivers. Wildland Hydrology Books, Fort Collins, Colorado.

Rosgen, D. L. 1996. Applied river morphology. Wildland Hydrology Books, Fort Collins, Colorado, 5-9 pp.

Rosgen, D. L. 2006. Watershed assessment of river stability and sediment supply (WARSSS), Ch. 1 & 2. Wildland Hydrology Books, Fort Collins, Colorado.

United States Department of Agriculture. 2008. Stream simulation: an ecological approach to providing passage for aquatic organisms at road-crossings. USDA Forest Service, Washington D.C., Ch 5, 3.1 pp.

Page 6: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

APPENDIX Stream Data Sheets

Page 7: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Route: Crossing Number:

Road Plan Station:

Summary of Findings Site Plan

All dimensions in feet

Longitudinal Profile

Longitudinal profile not conducted as clear span bridge is proposed

Ex. Culvert Length:

Ex. Culvert Slope:

None

None

122+51

Average Width at Bankfull:

Average Depth at Bankfull

Ex. Culvert Width:

32.2

2.7

None

Ex. Culvert Rise:

STREAM CROSSING FIELD DATA FORM

T/R/S:

Sampling Date:

Stream Name:

KME Staff:

Middle Branch Escanaba River CR 595 CR FY

MSP 8/26/2010

T47 / R29 / S2

None

Comments:1) Bankfull measurements taken on bankfull shelves at cross section locations

2) All cross sections taken in riffles

matt.stone-palmquist
Typewritten Text
Page 8: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Middle Branch Escanaba River -- County Road FY

Cross SectionsCross Section 1 Longitudinal Profile Station:

Bankfull Width (feet) Bankfull Depth (feet)

Cross section width measured with

tape only

Cross Section 2 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Cross section width measured with

tape only

2.8

35.5 2.5

N/A

N/A

27.0

King and MacGregor Environmental, Inc.

Cross Section 3 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Notes:

34 2.7

N/A

96

97

98

99

100

101

0 10 20 30 40 50

Bankfull Elevation

Width (feet)

Relativ

e Elevation (Feet)

King and MacGregor Environmental, Inc.

Page 9: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Route: Crossing Number:

Road Plan Station:

Summary of Findings Site Plan

All dimensions in feet

Longitudinal Profile

3

STREAM CROSSING FIELD DATA FORM

T/R/S:

Sampling Date:

Stream Name:

KME Staff:

Second River CR 595 1

MSP 8/23/2010

T48 / R29 / S25

Ex. Culvert Length:

Ex. Culvert Slope:

53

0.3%

261+00

Average Width at Bankfull:

Average Depth at Bankfull

Ex. Culvert Width:

14.5

2.0

5.5

Ex. Culvert Rise:

96

97bed water srf bankfull x-section

tion

Comments:1) Stream bed survey points taken at riffles and pools

2) Bankfull survey points taken at observed bankfull shelves3) All cross sections taken in riffles4) Stream survey point at Longitudinal Profile Station 9 is top of beaver dam5) Culvert under Wolf Lake Road from Longitudinal Profile Station 88 to 1406) Backwater from beaver dam downstream of cross section at Longitudinal Profile Station 480

29.6 409.6 480.993

94

95

96

97

0 50 100 150 200 250 300 350 400 450 500Longitudinal Profile Station

Relativ

e Elevation

Page 10: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Second River

Cross SectionsCross Section 1 Longitudinal Profile Station:

Bankfull Width (feet) Bankfull Depth (feet)

Cross Section 2 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

29

409

14.5 2.3

11.4 2.2

94

95

96

97

98

99

0 10 20 30 40

Bankfull Elevation

Width (feet)

Relativ

e Elevation

93.594

94.595

95.596

96.597

97.5

0 20 40 60Width (feet)

Bankfull Elevation

Relativ

e Elevation

King and MacGregor Environmental, Inc.

Cross Section 3 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Notes:

480

17.7 1.6

0 20 40 60Width (feet)

939495969798

0 20 40 60Width (feet)

Bankfull Elevation

Relativ

e Elevation

King and MacGregor Environmental, Inc.

Page 11: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Route: Crossing Number:

Road Plan Station:

Summary of Findings Site Plan

All dimensions in feet

Longitudinal Profile

Ex. Culvert Length:

Ex. Culvert Slope:

41

0.2%

311+91

Average Width at Bankfull:

Average Depth at Bankfull

Ex. Culvert Width:

9.4

1.0

2

Ex. Culvert Rise:

STREAM CROSSING FIELD DATA FORM

T/R/S:

Sampling Date:

Stream Name:

KME Staff:

Trib to Second River (a.k.a Trembath Creek) CR 595 1

MSP 8/23/2010

T48 / R28 / S19

2

98

99bed water srf bankfull x-section

ation

Comments:1) Stream bed survey points taken at riffles

1) Bankfull survey points taken at observed bankfull shelves3) All cross sections taken in riffles4) Existing culvert from Longitudinal Profile Station 141 to 183

0.0 291.8 335.894

95

96

97

98

99

0 50 100 150 200 250 300 350Longitudinal Profile Station

Relativ

e Elevation

Page 12: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Tributary to Second River (a.k.a. Trembath Creek)

Cross SectionsCross Section 1 Longitudinal Profile Station:

Bankfull Width (feet) Bankfull Depth (feet)

Cross Section 2 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

1.0

10.5 1.0

0

292

7.0

9797.5

9898.5

9999.5100

100.5

0 10 20 30 40

Width (feet)Re

lativ

e Elevation Bankfull Elevation

95.5

96

96.5

97

97.5

98

98.5

0 10 20 30 40 50

Width (feet)

Relativ

e Elevation Bankfull Elevation

King and MacGregor Environmental, Inc.

Cross Section 3 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Notes:

10.8 1.1

3+36

0 10 20 30 40 50

Width (feet)

95

95.5

96

96.5

97

97.5

98

0 10 20 30

Relativ

e Elevation

Width (feet)

Bankfull Elevation

King and MacGregor Environmental, Inc.

Page 13: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Route: Crossing Number:

Road Plan Station:

Summary of Findings Site Plan

All dimensions in feet

Longitudinal Profile

1

STREAM CROSSING FIELD DATA FORM

T/R/S:

Sampling Date:

Stream Name:

KME Staff:

Unnamed Stream 595 1

DS 9/272011

T/R/S

Ex. Culvert Length:

Ex. Culvert Slope:

44

-0.5%

3023+75

Average Width at Bankfull:

Average Depth at Bankfull

Ex. Culvert Width:

4.7

0.3

1

Ex. Culvert Rise:

1740

1750bed water srf bankfull x-section

Comments:1) Stream bed survey points taken at riffles

2) Bankfull survey points taken at observed bankfull shelves3) All cross sections taken in riffles4) Existing culvert is from Channel Profile station 461 to 505

102 341 3601700

1710

1720

1730

1740

1750

0 100 200 300 400 500

Channel Profile Stationing

Elevation

Page 14: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Unnamed Stream

Cross SectionsCross Section 1 Longitudinal Profile Station:

Bankfull Width (feet) Bankfull Depth (feet)

Cross Section 2 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

102

341

2.7 0.2

5.4 0.2

1710

1710.5

1711

1711.5

1712

1712.5

0 5 10 15

1729.5

1730

1730.5

1731

1731.5

1732

1732.5

0 5 10 15

Width (feet)

Elevation

Elevation

Bankfull Elevation

Bankfull Elevation

King and MacGregor Environmental, Inc.

Cross Section 3 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Notes:

360

6.1 0.4

1729.5

1730

0 5 10 15

17311731.21731.41731.61731.8

17321732.21732.41732.61732.8

1733

0 5 10

Width (feet)

Width (feet)

Elevation

Bankfull Elevation

King and MacGregor Environmental, Inc.

Page 15: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Route: Crossing Number:

Road Plan Station:

Summary of Findings Site Plan

All dimensions in feet

Longitudinal Profile

none

STREAM CROSSING FIELD DATA FORM

T/R/S:

Sampling Date:

Stream Name:

KME Staff:

Kipple Creek 595 1

DS 9/27/2011

T/R/S7

Ex. Culvert Length:

Ex. Culvert Slope:

none

none

3050+35

Average Width at Bankfull:

Average Depth at Bankfull

Ex. Culvert Width:

10.2

1.6

none

Ex. Culvert Rise:

16681669

bed water srf bankfull x-section

tion

Comments:1) Stream bed survey points taken at riffles

2) Bankfull survey points taken at observed bankfull shelves3) All cross sections taken in riffles

0.0 208 3001663166416651666166716681669

0 50 100 150 200 250 300 350

Channel Profile Stationing

Relativ

e Elevation

Page 16: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Kipple Creek

Cross SectionsCross Section 1 Longitudinal Profile Station:

Bankfull Width (feet) Bankfull Depth (feet)

Cross Section 2 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

0

208

9.4 1.2

11.6 1.8

1665

1665.5

1666

1666.5

1667

1667.5

1668

0 10 20 30 40

1664

1664.5

1665

1665.5

1666

1666.5

1667

0 10 20 30Width (feet)

Elevation

Elevation

Bankfull Elevation

Bankfull Elevation

King and MacGregor Environmental, Inc.

Cross Section 3 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Notes:

300

9.7 1.9

1666

1666.5

1667

1667.5

1668

1668.5

1669

0 10 20 30

16650 10 20 30 40

Width (feet)

Width (feet)

Elevation

Bankfull Elevation

King and MacGregor Environmental, Inc.

Page 17: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Route: Crossing Number:

Road Plan Station:

Summary of Findings Site Plan

All dimensions in feet

Longitudinal Profile

Longitudinal profile not surveyed as there were no stream features in the proposed road crossing location.

none

STREAM CROSSING FIELD DATA FORM

T/R/S:

Sampling Date:

Stream Name:

KME Staff:

Unnamed Tributary to Kipple Creek 1 595 1

DS 9/27/2011

T/R/S11

Ex. Culvert Length:

Ex. Culvert Slope:

none

none

3088+00

Average Width at Bankfull:

Average Depth at Bankfull

Ex. Culvert Width:

N/A

N/A

none

Ex. Culvert Rise:

Comments:1) Stream is a beaver pond at the proposed road crossing

Page 18: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Unnamed Tributary to Kipple Creek 1

Cross SectionsCross Section 1 Longitudinal Profile Station:

Bankfull Width (feet) Bankfull Depth (feet)

No cross sections were surveyed asthere were no stream features inthe proposed road crossing location.

Cross Section 2 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

No cross sections were surveyed asthere were no stream features inthe proposed road crossing location.

N/A

N/A

N/A N/A

N/A N/ARe

lativ

eElevation

Relativ

eElevation

King and MacGregor Environmental, Inc.

Cross Section 3 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

No cross sections were surveyed asthere were no stream features inthe proposed road crossing location.

Notes:

N/A

N/A N/A

Re

King and MacGregor Environmental, Inc.

Page 19: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Route: Crossing Number:

Road Plan Station:

Summary of Findings Site Plan

All dimensions in feet

Longitudinal Profile

Ex. Culvert Length:

Ex. Culvert Slope:

none

none

3114+37

Average Width at Bankfull:

Average Depth at Bankfull

Ex. Culvert Width:

3.8

0.6

none

Ex. Culvert Rise:

STREAM CROSSING FIELD DATA FORM

T/R/S:

Sampling Date:

Stream Name:

KME Staff:

Unnamed Tributary to Kipple Creek 2 CR 595 1

DS 9/8/2011

T/R/S

none

17121713

bed water srf bankfull x-section

Comments:1) Stream bed survey points taken at riffles

2) Bankfull survey points taken at observed bankfull shelves3) All cross sections taken in riffles

23 181 1981707170817091710171117121713

0 50 100 150 200Channel Profile Stationing

Elevation

Page 20: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Unnamed Tributary to Kipple Creek 2

Cross SectionsCross Section 1 Longitudinal Profile Station:

Bankfull Width (feet) Bankfull Depth (feet)

Cross Section 2 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

0.5

3.3 0.6

23

181

3.3

17101710.21710.41710.61710.8

17111711.21711.41711.6

0 5 10 15 20 25

1708

1708.5

1709

1709.5

1710

1710.5

1711

0 5 10 15 20 25

Width (feet)

Elevation

Elevation

Bankfull Elevation

Bankfull Elevation

King and MacGregor Environmental, Inc.

Cross Section 3 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Notes:

4.8 0.7

198

1710.81711

1711.21711.41711.61711.8

17121712.21712.41712.6

0 10 20 30

17101710.2

0 5 10 15 20 25

Width (feet)

Width (feet)

Elevation

Bankfull Elevation

King and MacGregor Environmental, Inc.

Page 21: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken
Page 22: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Unnamed Tributary to Dishno Creek

Cross SectionsCross Section 1 Longitudinal Profile Station:

Bankfull Width (feet) Bankfull Depth (feet)

Cross Section 2 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

31

44

3.8 0.9

4.8 0.4

7997.57998

7998.57999

7999.58000

8000.58001

0 2 4 6 8 10 12

Width (feet)Re

lativ

e Elevation Bankfull Elevation

7997.5

7998

7998.5

7999

7999.5

0 2 4 6 8 10

Width (f t)

Relativ

eElevation

King and MacGregor Environmental, Inc.

Cross Section 3 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

View downstream of wetland with no decernable

stream channel. All Flow is sub-surface

Notes:

N/A

N/A N/A

7997.5

0 2 4 6 8 10

Width (feet)

King and MacGregor Environmental, Inc.

Page 23: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Route: Crossing Number:

Road Plan Station:

Summary of Findings Site Plan

All dimensions in feetXS‐2

Longitudinal Profile

Ex. Culvert Length:

Ex. Culvert Slope:

none

none

1219+67

Average Width at Bankfull:

Average Depth at Bankfull

Ex. Culvert Width:

3.9

0.4

none

Ex. Culvert Rise:

STREAM CROSSING FIELD DATA FORM

T/R/S:

Sampling Date:

Stream Name:

KME Staff:

Unnamed Tributary to Voelkers Creek CR 595 1

DS 8/23/2010

T49 / R29 / S23

none

900690089010

bed water srf bankfull x-section

tion

Comments:1) Stream bed survey points taken at riffles

2) Bankfull survey points taken at observed bankfull shelves3) All cross sections taken in riffles4) Very low perenninal flow. Appears that flow is from upstream wetland and snow melt.

899489968998900090029004900690089010

0 50 100 150 200 250Longitudinal Profile Station

Relativ

e Elevation

Page 24: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Unnamed Tributary to Voelkers Creek

Cross SectionsCross Section 1 Longitudinal Profile Station:

Bankfull Width (feet) Bankfull Depth (feet)

Cross Section 2 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

0.5

2.8 0.4

34.5

171

5.6

9004.6

9004.8

9005

9005.2

9005.4

9005.6

9005.8

0 1 2 3 4 5 6 7

Width (feet)Re

lativ

e Elevation Bankfull Elevation

8998

8998.5

8999

8999.5

9000

9000.5

-2 0 2 4 6 8 10 12Width (ft)

Relativ

e Elevation Bankfull Elevation

King and MacGregor Environmental, Inc.

Cross Section 3 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Notes:

3.3 0.3

238

8998

-2 0 2 4 6 8 10 12Width (ft)

8997.5

8998

8998.5

8999

8999.5

9000

0 2 4 6 8 10 12

Width (feet)

Relativ

eElevation

Bankfull Elevation

King and MacGregor Environmental, Inc.

Page 25: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Route: Crossing Number:

Road Plan Station:

Summary of Findings Site Plan

All dimensions in feet

Longitudinal Profile

Ex. Culvert Length:

Ex. Culvert Slope:

32

-0.4%

1225+61

Average Width at Bankfull:

Average Depth at Bankfull

Ex. Culvert Width:

8.1

0.7

4

Ex. Culvert Rise:

STREAM CROSSING FIELD DATA FORM

T/R/S:

Sampling Date:

Stream Name:

KME Staff:

Voelkers Creek CR 595 1

MSP 8/24/2010

T49 / R29 / S23

4

9899

bed water srf bankfull x-section

n

Comments:1) Existing culvert from Longitudinal Profile Station 92 to 124

2) Stream bed survey points taken at riffles and pools downstream of existing culvert3) Bankfull survey points taken at observed bankfull shelves4) Stream bed survey points taken at centerline of stream channel upstream of culvert5) All cross sections taken in riffles6) Channel downstream of culvert is braided; single channel downstream of braided section is influenced by beaver dam7) Survey point at Longitudinal Profile Station 0 is top of beaver dam

149.3158.5 202.493949596979899

0 50 100 150 200

bed water srf bankfull x section

Longitudinal Profile Station

Relativ

eElevation

Page 26: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Voelkers Creek

Cross SectionsCross Section 1 Longitudinal Profile Station:

Bankfull Width (feet) Bankfull Depth (feet)

Bankfull width measured with tape only; no cross section

surveyed. Section immediately downstream of culvert and

may not be outside of road influence.

Cross Section 2 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

N/A

6.7 0.7

149

158

4.1

94

94.5

95

95.5

96

96.5

97

0 5 10 15 20 25 30

Bankfull Elevation

Relativ

e Elevation

King and MacGregor Environmental, Inc.

Channel braided

Cross Section 3 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Channel braided

Notes:

13.6 0.6

202

95

95.5

96

96.5

97

97.5

0 10 20 30 40 50

94

0 5 10 15 20 25 30

Bankfull Elevation

Width (feet)

R

Width (feet)

Relativ

e Elevation

King and MacGregor Environmental, Inc.

Page 27: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Route: Crossing Number:

Road Plan Station:

Summary of Findings Site Plan

All dimensions in feet

Longitudinal Profile

Due to deep water conditions created by beaver activity a longitudinal profile was not possilbe. A bridge exists and is proposed for this location.

Ex. Culvert Length:

Ex. Culvert Slope:

10

n/a

1353+00

Average Width at Bankfull:

Average Depth at Bankfull

Ex. Culvert Width:

28.1

2.1

24

Ex. Culvert Rise:

STREAM CROSSING FIELD DATA FORM

T/R/S:

Sampling Date:

Stream Name:

KME Staff:

Dead River CR 595 1

DS 8/22/2010

T49 / R29 / S11

7

Comments:1) Cross section taken in riffle

Page 28: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Dead River

Cross SectionsCross Section 1 Longitudinal Profile Station:

Bankfull Width (feet) Bankfull Depth (feet)

Cross Section 2 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Width of pool downstream from riffle cross section.

2.0

26.7 2.2

n/a

n/a

29.4

99979997.5

99989998.5

99999999.510000

10000.510001

0 10 20 30 40 50

Width (feet)

Relativ

e Elevation Bankfull Elevation

King and MacGregor Environmental, Inc.

Cross Section 3 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

View upstream of bridge (old beaver pond)

Notes:

N/A N/A

N/A

King and MacGregor Environmental, Inc.

Page 29: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Route: Crossing Number:

Road Plan Station:

Summary of Findings Site Plan

All dimensions in feet

Longitudinal Profile

Due to the proxminity of upstream and downstream beaver dams a longitudinal profile was not conductedat this location.

3

STREAM CROSSING FIELD DATA FORM

T/R/S:

Sampling Date:

Stream Name:

KME Staff:

Wildcat Canyon Creek CR 595 1

DS 8/24/2010

T49 / R29 / S2

Ex. Culvert Length:

Ex. Culvert Slope:

20

0.1%

1404+15

Average Width at Bankfull:

Average Depth at Bankfull

Ex. Culvert Width:

n/a

n/a

2 x 3

Ex. Culvert Rise:

Comments:

Page 30: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Wildcat Canyon Creek

Cross SectionsCross Section 1 Longitudinal Profile Station:

Bankfull Width (feet) Bankfull Depth (feet)

Twin 36" CMP exist.

Photograph is looking west (upstream)

Cross Section 2 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Photograph is looking east (downstream)

N/A

N/A

N/A N/A

N/A N/A

King and MacGregor Environmental, Inc.

Cross Section 3 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Notes:

N/A

N/A N/A

King and MacGregor Environmental, Inc.

Page 31: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Route: Crossing Number:

Road Plan Station:

Summary of Findings Site Plan

All dimensions in feet

Longitudinal Profile

2.5

STREAM CROSSING FIELD DATA FORM

T/R/S:

Sampling Date:

Stream Name:

KME Staff:

Wildcat Canyon Creek CR 595 2

DS 8/24/2010

T49 / R 29 / S2

Ex. Culvert Length:

Ex. Culvert Slope:

20

2.3%

1418+67

Average Width at Bankfull:

Average Depth at Bankfull

Ex. Culvert Width:

4.0

1.1

2.5

Ex. Culvert Rise:

vatio

n

Comments:1) Due to beaver activity no riffles were present.

2) Bankfull survey points taken at observed bankfull shelves

Longitudinal Profile Station

Relativ

e Elevation

Page 32: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Wildcat Canyon Creek No.2

Cross SectionsCross Section 1 Longitudinal Profile Station:

Bankfull Width (feet) Bankfull Depth (feet)

Cross Section 2 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

131

160

4.4 0.9

3.6 1.2

King and MacGregor Environmental, Inc.

Cross Section 3 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Notes:

N/A

N/A N/A

King and MacGregor Environmental, Inc.

Page 33: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Route: Crossing Number:

Road Plan Station:

Summary of Findings Site Plan

All dimensions in feet

Longitudinal Profile

Ex. Culvert Length:

Ex. Culvert Slope:

20

1.5%

1423+13

Average Width at Bankfull:

Average Depth at Bankfull

Ex. Culvert Width:

2.6

1.0

2

Ex. Culvert Rise:

STREAM CROSSING FIELD DATA FORM

T/R/S:

Sampling Date:

Stream Name:

KME Staff:

Wildcat Canyon Creek CR 595 3

DS 8/24/2010

T49 / R29 / S2

2

11997 5

11998bed water srf bankfull x-section

tion

Comments:1) Stream bed survey points taken at riffles

2) Bankfull survey points taken at observed bankfull shelves3) All cross sections taken in riffles

11996

11996.5

11997

11997.5

11998

0 20 40 60 80 100 120 140 160 180 200

Longitudinal Profile Stationing

Relativ

e Elevation

Page 34: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Wildcat Canyon Creek No. 3

Cross SectionsCross Section 1 Longitudinal Profile Station:

Bankfull Width (feet) Bankfull Depth (feet)

Cross Section 2 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

1.4

3.1 0.8

41.8

117

2.9

11996.5

11997

11997.5

11998

11998.5

11999

0 1 2 3 4 5 6

11997

11997.5

11998

11998.5

11999

0 1 2 3 4 5 6

Width (feet)

Relativ

e Elevation

Relativ

e Elevation

Bankfull Elevation

Bankfull Elevation

King and MacGregor Environmental, Inc.

Cross Section 3 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Notes:

1.8 0.8

175.4

11997

0 1 2 3 4 5 6

11996

11996.5

11997

11997.5

11998

11998.5

0 1 2 3 4 5

Width (feet)

Width (feet)

Relativ

e Elevation Bankfull Elevation

King and MacGregor Environmental, Inc.

Page 35: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Route: Crossing Number:

Road Plan Station:

Summary of Findings Site Plan

All dimensions in feet

Longitudinal Profile

Ex. Culvert Length:

Ex. Culvert Slope:

none

none

1430+13

Average Width at Bankfull:

Average Depth at Bankfull

Ex. Culvert Width:

6.0

1.0

none

Ex. Culvert Rise:

STREAM CROSSING FIELD DATA FORM

T/R/S:

Sampling Date:

Stream Name:

KME Staff:

Unnamed Tributary to Wildcat Canyon Creek CR 595 1

DS 8/24/2010

T49/R29/S2

none

13005

13010bed water srf bankfull x-section

tion

Comments:1) Stream bed survey points taken at riffles

2) Bankfull survey points taken at observed bankfull shelves3) All cross sections taken in riffles

12990

12995

13000

13005

13010

0 50 100 150 200 250 300Longitudinal Profile Stationing

Relativ

e Elevation

Page 36: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Unnamed Tributary to Wildcat Canyon Creek

Cross SectionsCross Section 1 Longitudinal Profile Station:

Bankfull Width (feet) Bankfull Depth (feet)

Cross Section 2 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

1.1

8.6 0.9

64.7

170.7

4.4

12999

12999.5

13000

13000.5

13001

13001.5

13002

0 2 4 6 8 10 12

12991.5

12992

12992.5

12993

12993.5

12994

0 5 10 15 20

Width (feet)

Relativ

eElevation

Relativ

eElevation

Bankfull Elevation

Bankfull Elevation

King and MacGregor Environmental, Inc.

Cross Section 3 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Notes:

5 0.9

270.3

12991.5

0 5 10 15 20

12991

12991.5

12992

12992.5

12993

0 5 10 15

Width (feet)

Width (feet)

ReRe

lativ

eElevation

Bankfull Elevation

King and MacGregor Environmental, Inc.

Page 37: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Route: Crossing Number:

Road Plan Station:

Summary of Findings Site Plan

All dimensions in feet

Longitudinal Profile

2, 3

STREAM CROSSING FIELD DATA FORM

T/R/S:

Sampling Date:

Stream Name:

KME Staff:

Unnamed Tributary to Mulligan Creek 1 Woodland 1

MSP 8/26/10

T50 / R29 / S35

Ex. Culvert Length:

Ex. Culvert Slope:

31, 36

0.8%, 2%

1506+70

Average Width at Bankfull:

Average Depth at Bankfull

Ex. Culvert Width:

8.3

1.2

2, 3

Ex. Culvert Rise:

100

105bed water srf bankfull x-section

tion

Comments:1) Stream bed survey points taken at riffles and steps in step-pool stream segments

2) Bankfull survey points taken at observed bankfull shelves3) All cross sections taken in riffles4) Existing culverts from Longitudinal Profile Station 113 to 1445) Drop downstream of cuverts is bedrock waterfall

54 205 31080

85

90

95

100

105

0 50 100 150 200 250 300 350Longitudinal Profile Station

Relativ

e Elevation

Page 38: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Unnamed Tributary to Mulligan Creek 1

Cross SectionsCross Section 1 Longitudinal Profile Station:

Bankfull Width (feet) Bankfull Depth (feet)

Cross Section 2 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

54

205

9.4 1.4

7.5 1.2

96

96.5

97

97.5

98

98.5

0 5 10 15 20 25 30

86.5

87

87.5

88

88.5

89

89.5

90

0 5 10 15 20 25 30

Width (feet)Re

lativ

e Elevation

Relativ

e Elevation

Bankfull Elevation

Bankfull Elevation

King and MacGregor Environmental, Inc.

Cross Section 3 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Notes:

310

8.0 1.0

86.5

87

0 5 10 15 20 25 30

85

85.5

86

86.5

87

0 5 10 15 20 25

Width (feet)

Width (feet)

RRe

lativ

e Elevation Bankfull Elevation

King and MacGregor Environmental, Inc.

Page 39: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Route: Crossing Number:

Road Plan Station:

Summary of Findings Site Plan

All dimensions in feet

Longitudinal Profile

Ex. Culvert Length:

Ex. Culvert Slope:

18

0.0%

1513+27

Average Width at Bankfull:

Average Depth at Bankfull

Ex. Culvert Width:

3.1

0.9

3

Ex. Culvert Rise:

STREAM CROSSING FIELD DATA FORM

T/R/S:

Sampling Date:

Stream Name:

KME Staff:

Unnamed Tributary to Mulligan Creek 2 CR 595 1

DS 8/23/2010

T50 / R29 / S35

3

13998

13999bed water srf bankfull x-section

ion

Comments:1) Stream bed survey points taken at riffles

2) Bankfull survey points taken at observed bankfull shelves3) All cross sections taken in riffles4) Up stream of existing road is a beaver pond with no stream channel visible. No cross section was surveyed.

13994

13995

13996

13997

13998

13999

0 20 40 60 80 100 120 140 160Longitudinal Profile Station

Relativ

e Elevation

Page 40: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Unnamed Tributary to Mulligan Creek No. 2

Cross SectionsCross Section 1 Longitudinal Profile Station:

Bankfull Width (feet) Bankfull Depth (feet)

Cross Section 2 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

0.9

2.4 0.8

94

140

3.7

13994.413994.613994.8

1399513995.213995.413995.613995.8

0 1 2 3 4 5

13995.613995.8

1399613996.213996.413996.613996.8

13997

0 1 2 3 4 5 6

Width (feet)

Relativ

e Elevation

Relativ

e Elevation

Bankfull Elevation

Bankfull Elevation

King and MacGregor Environmental, Inc.

Cross Section 3 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Notes:

N/A N/A

N/A

13995.6

0 1 2 3 4 5 6

Width (feet)

King and MacGregor Environmental, Inc.

Page 41: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Route: Crossing Number:

Road Plan Station:

Summary of Findings Site Plan

All dimensions in feet

Longitudinal Profile

Ex. Culvert Length:

Ex. Culvert Slope:

Unknown

Unknown

1522+93

Average Width at Bankfull:

Average Depth at Bankfull

Ex. Culvert Width:

2.5

0.8

0.5

Ex. Culvert Rise:

STREAM CROSSING FIELD DATA FORM

T/R/S:

Sampling Date:

Stream Name:

KME Staff:

Unnamed Tributary to Mulligan Creek 3 CR 595 1

MSP 8/26/2010

T50 / R29 / S35

0.5

1500015005

bed water srf bankfull x-section

on

Comments:1) Stream bed survey points taken at center line of wetland upslope of culvert and at steps or riffles down slope of culvert

2) Bankfull survey points taken at observed bankfull shelves3) Cross section taken in riffle; channel width measurements taken in pool segments of step-pool segments4) Existing culvert from Longitudinal Profile Station 115 to about 1405) Existing culvert buried on down slope end

283.714975149801498514990149951500015005

0 50 100 150 200 250 300Longitudinal Profile Station

Relativ

e Elevation

Page 42: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Unnamed Tributary to Mulligan Creek 3

Cross SectionsCross Section 1 Longitudinal Profile Station:

Bankfull Width (feet) Bankfull Depth (feet)

Upslope of existing road crossing is wetland seeps with no

identifiable stream features to survey

Cross Section 2 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Measured width of pool in step-pool segment

N/A

1.2 N/A

75

175

N/A

King and MacGregor Environmental, Inc.

Cross Section 3 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Notes:

3.7 0.8

283

14977.5

14978

14978.5

14979

14979.5

14980

0 2 4 6 8

Width (feet)

Relativ

e Elevation

Bankfull Elevation

King and MacGregor Environmental, Inc.

Page 43: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Route: Crossing Number:

Road Plan Station:

Summary of Findings Site Plan

All dimensions in feet

Longitudinal Profile

Buried

STREAM CROSSING FIELD DATA FORM

T/R/S:

Sampling Date:

Stream Name:

KME Staff:

Unnamed Tributary to Mulligan Creek 4 CR 595 1

MSP 8/26/2010

T50 / R29 / S26

Ex. Culvert Length:

Ex. Culvert Slope:

Buried

Buried

1527+21

Average Width at Bankfull:

Average Depth at Bankfull

Ex. Culvert Width:

1.6

1.0

Buried

Ex. Culvert Rise:

16000

16010bed water srf bankfull x-section

ation

Comments:1) Stream bed survey points taken at riffles or steps

2) Bankfull survey points taken at observed bankfull shelves3) Cross section taken in riffle4) Identifiable riffle not found upstream of existing Trail 5 crossing5) Existing Trail 5 crossing from Longitudinal Profile Station 86 to 123

217.915970

15980

15990

16000

16010

0 50 100 150 200 250 300Longitudinal Profile Station

Relativ

e Elevation

Page 44: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Unnamed Tributary to Mulligan Creek 4

Cross SectionsCross Section 1 Longitudinal Profile Station:

Bankfull Width (feet) Bankfull Depth (feet)

Cross Section 2 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

36

162

0.8 N/A

1.2 N/A

Cross Section 3 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Notes:

219

2.9 1

1598315983.5

1598415984.5

1598515985.5

1598615986.5

0 5 10 15

Width (feet)

Relativ

e Elevation

Bankfull Elevation

King and MacGregor Environmental, Inc.

Page 45: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Route: Crossing Number:

Road Plan Station:

Summary of Findings Site Plan

All dimensions in feet

Longitudinal Profile

Ex. Culvert Length:

Ex. Culvert Slope:

None

None

1556+82

Average Width at Bankfull:

Average Depth at Bankfull

Ex. Culvert Width:

N/A

N/A

None

Ex. Culvert Rise:

STREAM CROSSING FIELD DATA FORM

T/R/S:

Sampling Date:

Stream Name:

KME Staff:

Unnamed Tributary to Mulligan Creek 5 CR 595 1

MSP 8/26/2010

T50 / R29 / S26

None

1800418006

bed water srf bankfull x-section

ion

Comments:1) No stream channel observed in area of proposed crossing

2) Profile survey points taken at low point of wetland or swale

17994179961799818000180021800418006

0 20 40 60 80 100 120 140 160 180Longitudinal Profile Station

Relativ

e Elevation

Page 46: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Unnamed Tributary to Mulligan Creek 5

Cross SectionsCross Section 1 Longitudinal Profile Station:

Bankfull Width (feet) Bankfull Depth (feet)

Down slope end of proposed crossing; no swale or standing

water observed.

Cross Section 2 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Upslope end of proposed crossing; swale with no standing

water observed. No stream features observed.

N/A

N/A N/A

150

25

N/A

King and MacGregor Environmental, Inc.

Cross Section 3 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Upslope of proposed crossing; swale evident with standing

water observed. No stream features observed

Notes:

N/A N/A

N/A

King and MacGregor Environmental, Inc.

Page 47: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Route: Crossing Number:

Road Plan Station:

Summary of Findings Site Pland

All dimensions in feet

Longitudinal Profile

Ex. Culvert Length:

Ex. Culvert Slope:

None

None

1566+00

Average Width at Bankfull:

Average Depth at Bankfull

Ex. Culvert Width:

14.4

2.1

None

Ex. Culvert Rise:

STREAM CROSSING FIELD DATA FORM

T/R/S:

Sampling Date:

Stream Name:

KME Staff:

Mulligan Creek CR 595 1

MSP 8/26/2010

T50 / R29 / S26

None

1700017001

bed water srf bankfull x-section

ation

Comments:1) Stream bed survey points taken at riffles

2) Bankfull survey points taken at observed bankfull shelves3) All cross sections taken in riffles4) Proposed road crossing is at approximate Longitudinal Profile Station 525) Upstream end of profile is waterfall at beaver dam6) Downstream end of profile is influenced by backwater from beaver dam

17.4 52.6 130.116995169961699716998169991700017001

0 20 40 60 80 100 120 140 160

Longitudiinal Profile Station

Relativ

e Elevation

Page 48: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Mulligan Creek

Cross SectionsCross Section 1 Longitudinal Profile Station:

Bankfull Width (feet) Bankfull Depth (feet)

Note: bankfull width is sum of primary and secondary channels shown in this section and additional south secondary channel

Secondary channel from approx. longitudinal profile station 3 to 5 on section is breach of beaver dam.

Cross Section 2 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

2.1

10.8 2.1

17

130

17.9

16997

16998

16999

17000

17001

17002

0 5 10 15 20 25 30

16996

16997

16998

16999

17000

17001

0 5 10 15 20Width (feet)

Width (feet)

Relativ

e Elevation

Relativ

e Elevation

Bankfull Elevation

Bankfull Elevation

King and MacGregor Environmental, Inc.

Note: bankfull width is sum of channel shown in this section and additional south secondary channel

South Longitudinal Profile Station:

Secondary Channel Bankfull Width (feet) Bankfull Width (feet)

Breach of beaver dam has created secondary channel south of primary channel. Measured width of channel is 1.2 feet averageNotes:

1 1.3

N/A

0 5 10 15 20Width (feet)

King and MacGregor Environmental, Inc.

Page 49: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Route: Crossing Number:

Road Plan Station:

Summary of Findings Site Plan

All dimensions in feet

Longitudinal Profile

Bridge

STREAM CROSSING FIELD DATA FORM

T/R/S:

Sampling Date:

Stream Name:

KME Staff:

Yellow Dog River CR 595 1

DS 8/31/2010

T50 / R29 / S13

Ex. Culvert Length:

Ex. Culvert Slope:

Bridge

Bridge

1712+00

Average Width at Bankfull:

Average Depth at Bankfull

Ex. Culvert Width:

21.5

3.7

Bridge

Ex. Culvert Rise:

92

93bed water srf bankfull x-section

on

Comments:1) Stream bed survey points taken at riffles

2) Bankfull survey points taken at observed bankfull shelves3) All cross sections taken in riffles4) Only one riffle upstream and one riffle down stream were located.

89

90

91

92

93

0 50 100 150 200 250 300 350 400

Longitudinal Profile Station

Relativ

e Elevation

Page 50: Assessment of Proposed Stream Crossings …...bed water srf bankfull x-section tion Comments: 1) Stream bed survey points taken at riffles and pools 2) Bankfull survey points taken

Yellow Dog River

Cross SectionsCross Section 1 Longitudinal Profile Station:

Bankfull Width (feet) Bankfull Depth (feet)

Cross Section 2 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

61

361

26.8 3.6

16.2 3.7

909192939495969798

0 10 20 30 40

909192939495969798

0 5 10 15 20 25 30

Width (feet)Re

lativ

eElevation

Relativ

eElevation

Bankfull Elevation

Bankfull Elevation

King and MacGregor Environmental, Inc.

Cross Section 3 Longitudinal Profile Station:Bankfull Width (feet) Bankfull Depth (feet)

Notes:

N/A

N/A N/A

90

0 5 10 15 20 25 30

Width (feet)

King and MacGregor Environmental, Inc.