    Project Focus:

    BEDFORD STATION

    ASPINC

    O

    NSULTING

    OUTLINE DESIGN SCOPE

    3 SEPARATE CONTRACTS CONSISTING:

    DESIGN OF PRECAST MODULARPLATFORM EXTENSION WITH STEELDRIVEN PILES

    DESIGN OF A 2 TRACK GANTRY WITHCANTILEVER

    SIGNAL POST PILED FOUNDATIONDESIGNS

    OLE STRUCTURE PILE DESIGNS

    FOCAL POINTA limited construction programme and numerous buried servicesdictated that traditional methods of platform construction were notpracticable. Aspin group were engaged to deliver a bespokemodular platform extension to three platforms at Bedfordstation with limited foundation footprint and rapid installation time.

    The solution; precast concrete platform units sat on pairs of drivensteel tubular piles and reinforced concrete header beams.

    All finishes (except the thermoplastic yellow line) were cast into theunits in the factory using a variety of coloured concretes andaggregates. This included the copers and tactile pavers restrictingthe amount of onsite works and ensuring a high level of qualitycontrol.

    The weight of each element was limited to allow installation by RRVwhere overhead lines restricted the use of mobile cranage.

    The finished result is a durable, robust and solid feeling platform.

    OTHER SERVICES PROVIDED ONTHIS PROJECT BY ASPIN GROUP

    SITE INVESTIGATIONMODULAR STATION PLATFORM

    EXTENSION SUPPLY/INSTALL

    PLATFORM ANCILIARY STEELWORKSUPPLY/INSTALL

    SIGNAL GANTRY PILE SUPPLY/INSTALL

    OLE PILE SUPPLY/INSTALL

    CLIENT:

    DURATION:

    SIMILARPROJECTS:

    CARILLION (platform extensions)

    LUNDY PROJECTS (gantry design & signal fnds)CARILLION (Bedford sidings OLE pile designs)

    6 MONTHS

    OTHER SIGNAL GANTRY DESIGNS UNDERTAKENINCLUDE:THAMESLINK KO1NOTTINGHAM RESIGNALLING (3 TRACK CANT.)PORTSMOUTH RESIGNALLING

    V1.0

    2SW

    Part of:

    Tel: 01623 446 100www.aspingroup.com

    http://www.aspingroup.com/http://www.aspingroup.com/http://www.aspingroup.com/
  • 7/27/2019 ASPIN CONSULTING Project Focus Bedford V1-02 SW.pdf

    2/2

    ASPIN CONSULTING