Asphaltrecycling in the Netherlands
Harry Roos
VBW-Asfalt
Dutch Asphalt Pavement Association
Juni, 2012
![Page 2: Asphaltrecycling in the Netherlands Harry Roos VBW-Asfalt](https://reader036.fdocuments.net/reader036/viewer/2022081514/56812f3d550346895d94d22e/html5/thumbnails/2.jpg)
•Developement / historyDevelopement / history
•Facts and figuresFacts and figures
•TechniqueTechnique
•RequirementsRequirements
![Page 3: Asphaltrecycling in the Netherlands Harry Roos VBW-Asfalt](https://reader036.fdocuments.net/reader036/viewer/2022081514/56812f3d550346895d94d22e/html5/thumbnails/3.jpg)
Year 2010Year 2010 Production RAPProduction RAP
HMAHMA in HMA in HMA million tons %million tons %SpainSpain 34 34 3 3FranceFrance 39 39 7 7AustriaAustria 8 8 5 5USAUSA 327327 17 17GermanyGermany 45 45 26 26The NetherlandsThe Netherlands 10 10 32 32
![Page 4: Asphaltrecycling in the Netherlands Harry Roos VBW-Asfalt](https://reader036.fdocuments.net/reader036/viewer/2022081514/56812f3d550346895d94d22e/html5/thumbnails/4.jpg)
HistoryHistoryFavourable circumstances (1970 -1980)Favourable circumstances (1970 -1980)
-- techniquetechnique-- economyeconomy-- policypolicy
![Page 5: Asphaltrecycling in the Netherlands Harry Roos VBW-Asfalt](https://reader036.fdocuments.net/reader036/viewer/2022081514/56812f3d550346895d94d22e/html5/thumbnails/5.jpg)
Circumstances in the NetherlandsCircumstances in the NetherlandsTechniqueTechnique
-- available techniqueavailable technique-- support by the clientsupport by the client-- Dutch standard specificationsDutch standard specifications
![Page 6: Asphaltrecycling in the Netherlands Harry Roos VBW-Asfalt](https://reader036.fdocuments.net/reader036/viewer/2022081514/56812f3d550346895d94d22e/html5/thumbnails/6.jpg)
Environmental CircumstancesEnvironmental Circumstances
-- global environmental global environmental awarenessawareness
-- scarcity of quarry materialscarcity of quarry material-- alternative construction alternative construction
materialsmaterials
![Page 7: Asphaltrecycling in the Netherlands Harry Roos VBW-Asfalt](https://reader036.fdocuments.net/reader036/viewer/2022081514/56812f3d550346895d94d22e/html5/thumbnails/7.jpg)
Economic CircumstancesEconomic Circumstances
-- oil crisisoil crisis-- high bitumen priceshigh bitumen prices-- return on investmentreturn on investment-- min. 50% reclaimed asphalt in min. 50% reclaimed asphalt in
specsspecs
![Page 8: Asphaltrecycling in the Netherlands Harry Roos VBW-Asfalt](https://reader036.fdocuments.net/reader036/viewer/2022081514/56812f3d550346895d94d22e/html5/thumbnails/8.jpg)
SummarisingSummarising
-- accepted technologyaccepted technology-- co-operation client - industryco-operation client - industry-- environmental policyenvironmental policy-- scarcity of natural aggregatesscarcity of natural aggregates-- waste reductionwaste reduction-- oil crisesoil crises
![Page 9: Asphaltrecycling in the Netherlands Harry Roos VBW-Asfalt](https://reader036.fdocuments.net/reader036/viewer/2022081514/56812f3d550346895d94d22e/html5/thumbnails/9.jpg)
Today's incentivesToday's incentives
-- Dumping not allowedDumping not allowed-- Economic valueEconomic value-- Mixing plants equippedMixing plants equipped-- Standard technical Standard technical specificationsspecifications-- Green ProcurementGreen Procurement
![Page 10: Asphaltrecycling in the Netherlands Harry Roos VBW-Asfalt](https://reader036.fdocuments.net/reader036/viewer/2022081514/56812f3d550346895d94d22e/html5/thumbnails/10.jpg)
ENVIRON-MENTALITYENVIRON-MENTALITY
![Page 11: Asphaltrecycling in the Netherlands Harry Roos VBW-Asfalt](https://reader036.fdocuments.net/reader036/viewer/2022081514/56812f3d550346895d94d22e/html5/thumbnails/11.jpg)
Facts and figuresFacts and figures
-- production HMA 8 - 9 million tns/yrproduction HMA 8 - 9 million tns/yr
-- 40 asphalt mixing plants equipped40 asphalt mixing plants equippedfor recyclingfor recycling
-- RAP 3.5 - 4 million tns/yrRAP 3.5 - 4 million tns/yr
![Page 12: Asphaltrecycling in the Netherlands Harry Roos VBW-Asfalt](https://reader036.fdocuments.net/reader036/viewer/2022081514/56812f3d550346895d94d22e/html5/thumbnails/12.jpg)
0
20
40
60
80
100
120
1996 1998 2000 2003 2004 2005 2006 2007 2008 2009 2010
%% RAP in HMA % parallel drum% parallel drum
![Page 13: Asphaltrecycling in the Netherlands Harry Roos VBW-Asfalt](https://reader036.fdocuments.net/reader036/viewer/2022081514/56812f3d550346895d94d22e/html5/thumbnails/13.jpg)
AvailabilityAvailability
-- right placeright place-- right timeright time-- right quantityright quantity-- right qualityright quality
![Page 14: Asphaltrecycling in the Netherlands Harry Roos VBW-Asfalt](https://reader036.fdocuments.net/reader036/viewer/2022081514/56812f3d550346895d94d22e/html5/thumbnails/14.jpg)
Requirements for RAPRequirements for RAP-- reclaimed bitumen qualityreclaimed bitumen quality-- aggregate sizeaggregate size-- aggregate shapeaggregate shape-- no pollutionno pollution-- no tarno tar-- homogeneityhomogeneity
![Page 15: Asphaltrecycling in the Netherlands Harry Roos VBW-Asfalt](https://reader036.fdocuments.net/reader036/viewer/2022081514/56812f3d550346895d94d22e/html5/thumbnails/15.jpg)
Quality!Quality!Pavement demolitionPavement demolition
==Preparing valuable materialPreparing valuable material
No Waste!!No Waste!!
![Page 16: Asphaltrecycling in the Netherlands Harry Roos VBW-Asfalt](https://reader036.fdocuments.net/reader036/viewer/2022081514/56812f3d550346895d94d22e/html5/thumbnails/16.jpg)
RAP = Reclaimed Asphalt Pavement
Quality test on existing pavement
![Page 17: Asphaltrecycling in the Netherlands Harry Roos VBW-Asfalt](https://reader036.fdocuments.net/reader036/viewer/2022081514/56812f3d550346895d94d22e/html5/thumbnails/17.jpg)
RAP = Reclaimed Asphalt Pavement
Cold Milling:
Possibly in layers
![Page 18: Asphaltrecycling in the Netherlands Harry Roos VBW-Asfalt](https://reader036.fdocuments.net/reader036/viewer/2022081514/56812f3d550346895d94d22e/html5/thumbnails/18.jpg)
RAP = Reclaimed Asphalt Pavement
Crushing
![Page 19: Asphaltrecycling in the Netherlands Harry Roos VBW-Asfalt](https://reader036.fdocuments.net/reader036/viewer/2022081514/56812f3d550346895d94d22e/html5/thumbnails/19.jpg)
Bitumentanks
Ontstoffing
Voordoseursoud asfalt
Voordoseurs nieuwe grondstoffen
Zeefhuis
Fabrieks-vulstof
Voorraadsilo’swarm zand, grind,
steenslag
Weegbak
Mengbak
Ophaalbak
Eindsilowarmasfalt
Warme ladder
Waterdamp
Eigenvulstof
zandgrind steen-slag
zand
Verwarmingstrommeloud asfalt
(paralleltrommel)
Droogtrommelnieuwe grondstoffen
BrandervlamNieuwe grondstoffen Verbrandingsgassen en stof
Oud asfalt
Bitumen
Vulstof Afgevangen zand
Schoorsteen
![Page 20: Asphaltrecycling in the Netherlands Harry Roos VBW-Asfalt](https://reader036.fdocuments.net/reader036/viewer/2022081514/56812f3d550346895d94d22e/html5/thumbnails/20.jpg)
Percentage RAP in Mix
Subbase > 50 % (98 %)
Binder 45 % (90 %)
Wearing course 35 % (50 %)
Porous asphalt 30 % (20 %)
Stonemastic asphalt 25 % ( 1 %)
![Page 21: Asphaltrecycling in the Netherlands Harry Roos VBW-Asfalt](https://reader036.fdocuments.net/reader036/viewer/2022081514/56812f3d550346895d94d22e/html5/thumbnails/21.jpg)
RequirementsRequirementsfor for
hot mix with reclaimed asphalthot mix with reclaimed asphalt==
hot mix with 100% new materialshot mix with 100% new materials
![Page 22: Asphaltrecycling in the Netherlands Harry Roos VBW-Asfalt](https://reader036.fdocuments.net/reader036/viewer/2022081514/56812f3d550346895d94d22e/html5/thumbnails/22.jpg)
Possible solutionPossible solution
Recipe approachRecipe approach
Performance based requirementsPerformance based requirements
![Page 23: Asphaltrecycling in the Netherlands Harry Roos VBW-Asfalt](https://reader036.fdocuments.net/reader036/viewer/2022081514/56812f3d550346895d94d22e/html5/thumbnails/23.jpg)
ConclusionsConclusionsSuccess-factorsSuccess-factors-- acceptance of techniqueacceptance of technique-- environ-mentalityenviron-mentality-- co-operationco-operation-- return on investmentreturn on investment-- marketmarket