ASHE Presentation. Robert Samour, P.E. Deputy State Engineer Valley Transportation November 8, 2011. Update on ADOT Org. Changes. John Halikowski. Deputy Director for Policy Floyd Roehrich Jr. Deputy Director for Operations John Bogert. Jennifer Toth State Engineer. - PowerPoint PPT Presentation

Transcript of ASHE Presentation

  • ASHE PresentationRobert Samour, P.E. Deputy State Engineer Valley TransportationNovember 8, 2011

  • Update on ADOT Org. Changes

  • John Halikowski

  • Deputy Director for PolicyFloyd Roehrich Jr.

  • Deputy Director for OperationsJohn Bogert

  • Jennifer TothState Engineer

  • Valley Transportation Group

  • Valley Project Management

  • ADOT Highway Program $5.4B

    FISCAL YEAR20122013201420152016Statewide Highways$ 320 $257 $ 140$ 123 $ 208Statewide Subprograms$ 218 $ 230 $ 347 $ 313 $ 413Subtotal$ 538$ 487$ 487$ 436$ 621 MAG Area Highways$ 607 $ 465$ 862$ 731$ 0MAG Area Regionwide$ 44$ 38 $ 37$ 38 $ 0Subtotal$ 651 $ 503 $ 899$ 769 $ 0 ADOT Program Total$1,189$990$1,386$1,205$ 621

  • MAG RTP Freeway Program

  • FY 2012 CONSTRUCTION PROGRAM

  • FY 2013 CONSTRUCTION PROGRAM

  • FY 2014 CONSTRUCTION PROGRAM

  • FY 2015 CONSTRUCTION PROGRAM

  • FY 2016 CONSTRUCTION PROGRAM?

  • Upcoming Alternative Delivery Projects================================= I-10: Perryville Rd TI, Design Build

    US60 Grand Ave/SR303L TI, Interim, CMAR

  • MAG RTP Freeway ProgramFY 2012 Design Projects=================================I-10: Perryville Road TI, Design-BuildUS60 Superstition: Meridian Road TISR101L Pima: Shea Blvd to SR202L, GPLSR303L: US60 Grand Ave TI, CMARSR303L: Thomas to Camelback & Glendale to Peoria, LandscapeMAG Region wide: Four Drainage Tunnels, Drainage Tunnel Improvements

  • Where to Find Program Information==============================ADOT Freeway and Highways Statewidehttp://mpd.azdot.gov/mpd/priority_Programming/Five_Year_Programs.asp

    MAG Freeways, Arterial Streets & Transithttp://www.azmag.gov/Projects/Project.asp?CMSID2=1140&MID=Transportation

  • ASHE PresentationRobert Samour, P.E. Deputy State Engineer Valley TransportationNovember 8, 2011

    **I-17: Arizona Canal to L101 $5M FMSSR24: L202 to Ellsworth $148MSR51: Bell Rd to L101 $2M FMSL303: Thomas to Camelback $72M Glendale to Peoria $113ML303: Peoria to Waddell $2M Landscaping Waddell to Mountain View $5M LandscapingTOTAL $347M*I-10: Perryville Rd TI $18MI-10: 32nd St to L202 $167M Exp/Loc Lane Phase 1I-17: L101 to SR 74 $8M FMSSR51: Black Mountain TI $24M City of Phoenix ProjectUS60: Meridian Rd TI $12ML303: Camelback to Glendale $56ML303: Thomas to Camelback $2M Landscaping Glendale to Peoria $4M LandscapingTOTAL $291M

    *I-10: 32nd St to L202 $114M Exp/Loc Lanes Phase 2US60: L101 to Van Buren $21M Phase 2L101: Shea Blvd to L202 $91M GPLL202: Dobson to I-10 $5M FMSL202: 17th Ave to 51st Ave: $228M new FwyL303: US60 Interim TI $48ML303: Camelback-Glendale $2M LandscapingL303: I-10 TI $7M LandscapingTOTAL $516M*I-10: Sky Harbor West TI $37MI-10: 32nd St to L202 $135M Exp/Loc Lanes Phase 3I-10: L202 to Riggs Rd $69M GPL & HOVL202: L101 to Gilbert Rd $56M GPLL202: Val Vista to Dobson $6M FMSL202: Baseline to Salt River $46M Salt River to Buckeye $177ML202: Salt River Bridge $99MTOTAL $625M*I-10: Dysart 83rd Ave $5M LandscapingI-17: Arizona Canal to L101 $86M GPL Peoria to Greenway $16M DrainageUS60: L303 L101 Ph2 $50MTOTAL $157M*