AIR SUSPENSION SYSTEM IN EMU
PRESENTED BY
E.M.U.CARSHED / HOWRAH EASTERN RAILWAY
INTRODUCTION
• PREVIOUSLY END GROUNDED CLOSED COIL
HELICAL SPRINGS WITH OIL DUMPER / SHOCK
ABSORBER ARE USED BOTH FOR PRIMARY
AND SECONDARY SUSPENSION.• BUT NOW AIR COLUMN IS USED IN PLACE OF
COIL SPRING IN SECONDARY SUSPENSION
DUE TO ITS CLASSIC CHARACTERISTICS OF
VARYING STIFFNESS.
EMU COACHES ARE PROVIDED WITH DOUBLE STAGE SUSPENSION SYSTEM –
• PRIMARY SUSPENSION• SECONDARY SUSPENSION
ADVANTAGES OF AIR SUSPENSION SYTEM
1. CONSTANT HEIGHT OF COACH IRRESPECTIVE OF LOAD.
2. NO CHANCE OF PLATFORM RUBBING.
3. VERY SMOOTH RIDING.
4. LESS MECHANICAL FAILURE.
5. LESS MAINTENANCE.
AIR SUSPENSION BOGIE FOR EMU
SHOCK ABSORBER
BOLSTERLEVELING VALVE
INSTALLATION LEVERAIR SPRING BELLOWDUPLEX CHECK VALVE
HISTORY
• In the year 2001a trial had been done by RDSO on 3-point and 4-point air suspension coaches. • After the trial RDSO declared that the 3-point suspension system is not suitable for EMU service.• Only 4-point suspension system remain is in system and one trailer coach with 3-point suspension is converted to 4-point suspension as per ICF drawing by CS/HWH & in one Motor with 3-point suspension is in service with conventional coil springs in secondary.
AIR SUSPENSION BOGIE FOR EMU
SHOCK ABSORBER
BOLSTERLEVELING VALVE
INSTALLATION LEVERAIR SPRING BELLOWDUPLEX CHECK VALVE
WORKING PRINCIPLEAir from MR flows to air spring bellow through levelingvalve when this valve is in charging position. As the pressure inside the bellow increases bellow heightincreases as well as bolster also lifts up and the linkof leveling Valve approaching to horizontalposition. When the Leveling valve enters within deadband zone no further air will flow to bellow. Now ifthe load on air spring increases, bolster goes downand leveling valve will be in charging conditionadmitting more air into the bellow. This causesbolster again lifts up to the preset level.
Now when the load on air spring decreases, the bolster goes up and leveling valve will be in discharging mode. Then air from bellow flows out to atmosphere through leveling valve. Thus bolster as well as leveling valve goes down up to the same preset level.
WORKING PRINCIPLE
LEVELING VALVELEVELING VALVE
SCHEMATIC DIAGRAM FOR 4-POINT AIR-SUSPENSION
DUPLEX CHECK VALVE
AS
DUPLEX CHECK VALVE
INSTALLATION LEVER
ISOLATING COCK FOR AIR-SUSPENSION
TWO WAY DIRT COLLECTOR
150
LT
RS
. R
ES
ER
VO
IR
AS
CHECK VALVE
INSTALLATION LEVER
MAIN RESERVOIR PIPE LINE
20 L
TR
S.
RE
SE
RV
OIR
20 L
TR
S.
RE
SE
RV
OIR
POPULATION
Division Bellow
(Contitech)
Bellow
(Firestone)
Leveling valve
(Knorr-bremse)
Leveling valve
(FTIL)
Duplex check valve
(Knorr-bremse
Duplex check valve
(FTIL)
HWH 173 39 116 96 58 48
SDAH 292 80 172 200 92 94
TOTAL 465 119 288 296 150 142
Division Vertical
Shock absorber
(300 kg.)
(ESCORTS)
Vertical
Shock absorber
(300 kg.)
(Gabrial)
Vertical
Shock absorber
(300 kg.)
(IAI)
Lateral
Shock absorber
(200 kg.) (ESCORTS)
Lateral
Shock absorber
(200 kg.) (Gabrial)
Lateral
Shock absorber
(200 kg.)
(IAI)
HWH 194 NIL 18 194 NIL 18
SDAH 260 86 26 260 86 26
TOTAL 454 86 44 454 86 44
PNEUMATIC
MECHANICAL
TOTAL FAILURE (IN HWH DIV.)
1. Hose 30 NOS
2. Lateral shock absorber 12 NOS.
3. Installation lever 16 NOS.
4. Duplex check valve 03 NOS.
5. Miscellaneous 02 NOS
6. Bellow NIL
7. Leveling valve NIL.
8. Vertical shock absorber NIL
MOTOR COACH NO. 60040
DATE OF COMMISSIONING – 31.03.2005.
DATE OF LAST POH – 01.03.07.
DATE OF FAILURE – 15.11.07.
VERTICAL SHOCK ABSORBER
TOP HOLDING BRACKET FOR VERTICAL SHOCK ABSORBER
FAILURE OF VERTICAL SHOCK ABSORBER (IN HWH DIV.)
FAILURE OF HOSE (IN HWH DIV.)
• Rubber braided flexible hose.
About 30 nos of flexible rubber braided hose out of 108 nos. had been failed within 09 months of commissioning. These were replaced by CS/HWH/E.Rly.
• Population of hose per coach - 08 Nos.
FAILURE OF RUBBER HOSE (IN HWH DIV.)
POPULATION
LIFE TOTAL FAILURE
FRPCPY
312
• 12 NOS. – 07 YRS.
• 54 NOS. - 03.33 YRS.
• 54 NOS. - 03 YRS.
• 54 NOS. – 01.17 YRS.
• 30 NOS. – 0.42 YRS.
• 54 NOS. - 0.25 YRS.
• 54 NOS. – 01 MONTHS.
30 NOS. 5.8
FAILURE OF LATERAL SHOCK ABSORBER (IN HWH DIV.)
THERE ARE A GOOD NUMBR OF FAILURE OF LATERAL SHOCK ABSORBER DUE TO BREAKAGE OF ITS FIXING BOLTS. THESE FAILURES WERE TAKEN PLACE WITHIN 05 MONTHS OF COMMISSIONING IN M/S JESSOP & CO. MAKE COACHESONLY.
AVAILABLE GUIDELINES FROM RDSO/LKO CMI 9802 (REV. 1) MAY 2001
& (REV. 2) FEBRUARY 2008.
• PROCEDURE FOR LEAKAGE TESTING AND PERMISSIBLE LEAKAGE.
• PROCDURE OF CHECKING BOGIE CLEARANCES AND CENTRE BUFFER COUPLER HEIGHT ADJUSTMENT.
• PROCEDURE FOR PROCEDURE FOR INSTALLATION LEVER ADJUSTMENT.
• GENERAL TECHNICAL DATA FOR SPRINGS.• MAINTENANCE SCHEDULE.• SUSPENSION DATA.
GUIDELINE REQUIRED
• MR PRESSURE SETTING.
• CLEANING OF FILTER FOR LEVELING VALVE.
• EXCESS RUNNING TIME OF MCP.
• PROBLEM WITH MAINTENANCE OF M/S FTIL MAKE LEVELING VALVE REGARDING LEAKAGE.
• NON INTERCHANGEABILITY OF BASE PLATE FOR AIR SPRING BELOW.